Contracts Finder notice
S30086 Influencing the uptake of in-vehicle safety technologies and quantifying impacts
Authority: National Highways Limited
What is being bought
Published requirement descriptionThis project aims to address these challenges:
Aim (1) Quantify the performance of vehicle safety technologies "in the field" (i.e. as close
as possible to actual, not ideal or "perfect use") and forecast KPI1 trends under different
scenarios for input to (1) an updated RTZH model and (2) a future Safety Outcome
Model to inform more accurate target setting.
Aim (2) Deliver practical evidence-based recommendations for interventions that
National Highways can use to influence uptake of in-vehicle technologies that will make
the biggest difference to KSI outcomes on the SRN;
These aims will be achieved via the delivery of two work packages (not including
the inception/mobilisation phase which is also outlined in the description of service)
- Work Package 1 - Trends in technology uptake and safety outcomes
- Work Package 2 - User segmentation, influences and policy levers.
The Road to Zero Harm project and Safety Outcome Model projects identified gaps in
our understanding of the trends in uptake and impacts of in-vehicle safety technologies.
The RTZH model relies on several assumptions about usage and effectiveness of in
vehicle safety technologies. Our confidence in the validity of these assumptions is low
because:
- Recent press coverage indicates usage may be overestimated due
to issues affecting user acceptance (e.g. people turning off lane
keep assist because they perceive it as annoying and potentially
dangerous - www.brake.org.uk/get-involved/take ↗
action/mybrake/knowledge-centre/reports/vehicle-safety-systems-and-the
future-of-driving).
- The effectiveness estimates were also based on effects estimated for
whole of England (not just SRN) as part of the work to develop the GSR
legislation for Europe (which is now quite old and doesn't allow for
differentiating effects by road features, traffic mix and speeds).
- Lack of trend data on the uptake and usage of these technologies also
prevented us including in-vehicle safety technology in the Safety Outcome
model.
The first phase of this work (Spats work order S30004) delivered the following:
- Determine current prevalence and forecast trends (to 2050) in uptake of vehicle
safety technologies.
- Determine the conditions under which each technology is most likely to be
effective, as well as the road user groups and the crash types they are most
likely to produce KSI reductions in.
- Forecast KSI savings on the SRN over time (out to 2050) in different scenarios
and assess difference in magnitude of benefits.
- Review academic and grey literature to assess:
a. perceptions of in-vehicle safety technology by road user type and socio
demographic group (including age, gender, occupation and socio
economic categories)
b. levels of technology use (using objective observational measures insofar
as possible, supplemented with self-report if needed) disaggregated by
vehicle category and socio-demographic factors
c. observed barriers and enab
Published procurement details
- Procedure
- Call-off from a framework agreement
- Buyer reference
- tender_537358/1599553
- Category
- Services
- Tender status
- Complete
- Award status
- Active
- Suitable for SMEs
- Yes
- Suitable for voluntary, community and social enterprises
- Yes
- Published tender value
- £100,000.00
- Tender deadline
- Procurement method
- Selective
- Item 1: Delivery locations as published
- British Oversea Territories; Channel Islands; Europe; Isle of Man; Rest of the World; United Kingdom
Key dates
Published dates- Award decision31 Jul 2026
- Contract starts31 Jul 2026
- Notice published3 Aug 2026
- Contract ends31 Mar 2027
Contracting authority & participating public bodies
- National Highways LimitedContracting authority
Suppliers named on the notice
- AtkinsRéalis Jacobs Joint VentureSupplier
- Voluntary, community or social enterprise
- No
- Business size
- Large
Official documents & specifications (1)
Official links; attachments are not copiedNotices published for this procedure
Source record
- Source
- Contracts Finder
- Notice language
- en
- Release reference
- ocds-b5fd17-03a04c35-be48-499c-ba1f-4da67a681f98-2026-08-03T14:23:45+01:00
- Published
- 3 Aug 2026
- Latest update
- 3 Aug 2026
- Procedure reference
- ocds-b5fd17-03a04c35-be48-499c-ba1f-4da67a681f98
- Contract reference
- ocds-b5fd17-03a04c35-be48-499c-ba1f-4da67a681f98-1