Expiring UK Public Contracts: Retender Radar
Explore UK public contracts by expiry date, with buyers, incumbent suppliers and extension options. Estimated end dates are labelled; expiry does not guarantee a new tender.
Contracts ending in the next 12 months
Page 16 · 50 contracts on this page · more available
- Ends · in 122 days
Call off from FRA081:(Lot1)-Waste and Recycling Support for Brent Council
Waste & Resources Action Programme · Other public body · Nationwide (UK)
Incumbent: Circulogic Limited
Aim of the project is to provide technical advice and support to enable BC to understand the performance of their existing service and to model the costs, resource requirements and likely performance of replacing the existing reusable sack …
- Published value
- £25kinc. VAT as published
- Annual run-rate
- —term under 6 months
- Term
- 28 Oct 2026 → 28 Feb 2027 · 4 months
- Reference
ocds-h6vhtk-079073
- Ends · in 122 days
Call Off From FRA082 Waste and Resource Management Technical Advisors (Lot 1) Commercial Gate Fees
Waste & Resources Action Programme · Other public body · Nationwide (UK)
Incumbent: Green Gain
WRAP would like to procure an expert in the waste management industry to lead on the delivery of interviews with waste management operators, as part of WRAP’s annual commercial gate fees survey and report. WRAP wishes to undertake this work…
- Published value
- £15kinc. VAT as published
- Annual run-rate
- —not computed
- Term
- 1 Sept 2026 → 28 Feb 2027 · 6 months
- Reference
ocds-h6vhtk-06eba0
- Ends · in 123 days
St Agnes, Pressing
COASTLINE DESIGN AND BUILD LIMITED · Other public body · South West England
Incumbent: Classic Builders (South West) Ltd
Construction of 36 Affordable Homes and associated infrastructure in St Agnes Cornwall
- Published value
- £8.1minc. VAT as published
- Annual run-rate
- £6.0mpublished value ÷ term, inc. VAT
- Term
- 27 Oct 2025 → 1 Mar 2027 · 1.3 yrs
- Reference
ocds-h6vhtk-05ac2a
- Ends · in 123 days
LU Infrastructure Monitoring Technology Solutions Trial
Docklands Light Railway Limited · Other public body · Greater London
Incumbent: ONE BIG CIRCLE LTD
LU Infrastructure Monitoring Technology Solutions Trial for installation of Cameras and capture and analysis data for six months
- Published value
- £601k
- Annual run-rate
- —not computed
- Term
- 1 Sept 2026 → 1 Mar 2027 · 6 months
- Reference
ocds-h6vhtk-06ba9b
- Ends · in 123 days
Plumbing Works NCC - Block 3
Construction Industry Training Board · Other public body · Nationwide (UK)
Incumbent: BRUCE TOWERS AND SONS LIMITED
Plumbing work for bedroom accommodation block 3 refurbishment. (This was a limited-invitation tender, as the requirement necessitated the provision of local support and resources)
- Published value
- £105k
- Annual run-rate
- —term under 6 months
- Term
- 9 Nov 2026 → 1 Mar 2027 · 4 months
- Reference
ocds-h6vhtk-078bf5
- Ends · in 123 days
Culture Review
Post Office Limited · Other public body · Nationwide (UK)
Incumbent: Rise Associates North Limited
Culture Review Value up to £100,000 ex vat
- Published value
- £100k
- Annual run-rate
- £100kpublished value ÷ term, exc. VAT
- Term
- 3 Mar 2026 → 1 Mar 2027 · 1 yr
- Reference
ocds-h6vhtk-0666d4
- Ends · in 123 days
Whole Farm Nitrogen and Phosphorus Balances River Axe
ENVIRONMENT AGENCY · Other public body
Incumbent: FWAG SouthWest
Background and Purpose The Authority requires a competent supplier to calculate and interpret whole farm nitrogen and phosphorus balances. The work will identify whether each farm has a nutrient surplus or deficit, the main nutrient inputs …
- Published value
- £62k
- Annual run-rate
- —term under 6 months
- Term
- 26 Oct 2026 → 1 Mar 2027 · 4 months
- Reference
ocds-h6vhtk-079128
- Ends · in 123 days
Website Creation & Hosting
MAGENTA LIVING · Other public body · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: Spindogs
Website design, creation, support and hosting for 12 months.
- Published value
- £62k
- Annual run-rate
- £62kpublished value ÷ term, exc. VAT
- Term
- 1 Mar 2026 → 1 Mar 2027 · 1 yr
- Reference
ocds-h6vhtk-05e364
- Ends · in 123 days
Cadoxton catchment Nature Based Solutions (NbS) engagement and delivery
Natural Resources Wales · Other public body · Wales (Cymru)
Incumbent: We are Nature based CiC
CDN for Cadoxton catchment Nature Based Solutions (NbS) engagement and delivery
- Published value
- £50k
- Annual run-rate
- —term under 6 months
- Term
- 22 Sept 2026 → 1 Mar 2027 · 5 months
- Reference
ocds-h6vhtk-0776eb
- Ends · in 124 days
Magenta Living Retaining Wall Works
MAGENTA LIVING · Other public body · North West England
Incumbent: DALE STRUCTURAL REPAIRS LIMITED
Works at a ML property; retaining wall works. Install of Temp. and Perm. Solutions to failing exterior retaining wall at the property.
- Published value
- £45k
- Annual run-rate
- £45kpublished value ÷ term, exc. VAT
- Term
- 2 Mar 2026 → 2 Mar 2027 · 1 yr
- Reference
ocds-h6vhtk-06155f
- Estimated end · in 125 daysPanel · 3 suppliers
General Lab Equipment
CENTRE FOR PROCESS INNOVATION LIMITED · Other public body · Nationwide (UK)
Panel: North England Laboratory Supplies, SciQuip Ltd, VWR International Ltd · Last contest: 3 bids (2 SME)
- Published value
- £5.0m
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 3 Mar 2027 · start not published
- Reference
ocds-h6vhtk-039921
- Estimated end · in 125 daysPanel · 3 suppliers
Analysers
CENTRE FOR PROCESS INNOVATION LIMITED · Other public body · Nationwide (UK)
Panel: Fisher Scientific UK, North England Laboratory Supplies, SciQuip Ltd · Last contest: 3 bids (2 SME)
- Published value
- £5.0m
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 3 Mar 2027 · start not published
- Reference
ocds-h6vhtk-039921
- Estimated end · in 125 daysPanel · 3 suppliers
Balances, Scales and Weights
CENTRE FOR PROCESS INNOVATION LIMITED · Other public body · Nationwide (UK)
Panel: Medline Scientific Limited, North England Laboratory Supplies, SciQuip Ltd · Last contest: 3 bids (3 SME)
- Published value
- £5.0m
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 3 Mar 2027 · start not published
- Reference
ocds-h6vhtk-039921
- Estimated end · in 125 daysPanel · 3 suppliers
Fridges, Freezers and Chillers
CENTRE FOR PROCESS INNOVATION LIMITED · Other public body · Nationwide (UK)
Panel: North England Laboratory Supplies, SciQuip Ltd, VWR International Ltd · Last contest: 3 bids (2 SME)
- Published value
- £5.0m
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 3 Mar 2027 · start not published
- Reference
ocds-h6vhtk-039921
- Estimated end · in 125 daysPanel · 3 suppliers
Laboratory/Cleanroom Furniture
CENTRE FOR PROCESS INNOVATION LIMITED · Other public body · Nationwide (UK)
Panel: North England Laboratory Supplies, SciQuip Ltd, Wolf Laboratories Limited · Last contest: 3 bids (3 SME)
- Published value
- £5.0m
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 3 Mar 2027 · start not published
- Reference
ocds-h6vhtk-039921
- Ends · in 125 days
Provision of Seabird Microcat CT(D)
National Oceanography Centre · Other public body · South East England
Incumbent: Planet Ocean Ltd
This contract was for the supply of SBE37‑SMP‑ODO moored CTD instruments and associated 7000‑metre rated components required as a standalone replacement purchase. The equipment must be sourced from the manufacturer's authorised representati…
- Published value
- US$196,776
- Annual run-rate
- —not a GBP value
- Term
- 4 Mar 2026 → 3 Mar 2027 · 1 yr
- Reference
ocds-h6vhtk-0667dc
- Ends · in 125 days
Digital Transformation Support
Midland Heart · Other public body · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: Hippo Digital Limited
To assist in the undertaking of a digital transformation programme.
- Published value
- £150kinc. VAT as published
- Annual run-rate
- £152kpublished value ÷ term, inc. VAT
- Term
- 9 Mar 2026 → 3 Mar 2027 · 1 yr
- Reference
ocds-h6vhtk-06b762
- Ends · in 125 days
Provision of Acoustic Doppler Current Profiler
National Oceanography Centre · Other public body · South East England
Incumbent: Saderet Limited
Supply of oceanographic instrumentation and associated delivery services, comprising one (1) Teledyne RDI Workhorse II Sentinel 600 kHz Acoustic Doppler Current Profiler (ADCP) (WHS600) including standard accessories/software and delivered …
- Published value
- US$40,770
- Annual run-rate
- —not a GBP value
- Term
- 4 Mar 2026 → 3 Mar 2027 · 1 yr
- Reference
ocds-h6vhtk-0671be
- Estimated end · in 127 days
TfL 95566 Private Medical Benefit Administrator
Docklands Light Railway Limited · Other public body · Nationwide (UK)
Incumbent: AXA Health · Last contest: 2 bids · awarded at the estimate
This procurement is for the provision and administration of private medical benefits in Transport for London (TfL): • Administration service is extremely important to TfL. TfL’s chosen administrator needs to provide excellent service to bot…
- Published value
- £2.5m
- Annual run-rate
- —start date not published
- Term
- Estimated end 5 Mar 2027 · start not published
- Reference
ocds-h6vhtk-02bd06
- Ends · in 127 days
Afonwen to Chwilog Active Travel - Phase 2
Cyngor Gwynedd · Other public body · Wales (Cymru)
Incumbent: G H James cyf · Last contest: awarded 26% under the estimate
Phase 2 of the Afonwen roundabout to Chwilog Active Travel multi use path.
- Published value
- £446k
- Annual run-rate
- —not computed
- Term
- 14 Sept 2026 → 5 Mar 2027 · 6 months
- Reference
ocds-h6vhtk-06c46f
- Ends · in 127 days
Job Specific Training Courses
Plymouth Community Homes · Other public body · South West England
Incumbent: GREENLIGHT TRAINING LTD
Mandatory job specific training courses tailored to organisation such as Asbestos Awareness UKATA, Tetra Systems use, Emergency first aid, CDM overview etc
- Published value
- £44k
- Annual run-rate
- £45kpublished value ÷ term, exc. VAT
- Term
- 11 Mar 2026 → 5 Mar 2027 · 1 yr
- Reference
ocds-h6vhtk-0669e0
- Ends · in 127 days
3D XRAY Annual Service
Sellafield Limited · Other public body
Incumbent: 3D XRAY Limited
Annual service & support contract cover
- Published value
- £32k
- Annual run-rate
- £33kpublished value ÷ term, exc. VAT
- Term
- 13 Mar 2026 → 5 Mar 2027 · 1 yr
- Reference
ocds-h6vhtk-066985
- Ends · in 127 days
Provision of NEBOSH Training
Nuclear Restoration Services Limited · Other public body
Incumbent: Safety Zone Scotland Ltd
A contract has been awarded by Nuclear Restoration Services (NRS) Limited (Dounreay) following a limited competitive procedure for the Provision of NEBOSH Training
- Published value
- £29k
- Annual run-rate
- —term under 6 months
- Term
- 26 Oct 2026 → 5 Mar 2027 · 4 months
- Reference
ocds-h6vhtk-06e6b4
- Estimated end · in 130 daysFramework recordPanel · 7 suppliers
Framework Agreement for Waste Management Services
PROCURE PLUS HOLDINGS LIMITED · Other public body · Nationwide (UK)
Panel: Acumen Waste Services Limited, GPT Waste Management Ltd, Go Green ltd +4 more
Re-procurement plannedFramework for Waste Management Services · tender expected
- Published value
- £20mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 8 Mar 2027 · start not published
- Reference
ocds-h6vhtk-0392b2
- Ends · in 130 days
Wylfa DCS4- Design, Manufacture and Installation of Contamination enclosure
Nuclear Restoration Services Limited · Other public body
Incumbent: RUBB BUILDINGS LTD
Design, Manufacture and Installation of Contamination enclosure at Wylfa Site, Anglesey.
- Published value
- £369kinc. VAT as published
- Annual run-rate
- £720kpublished value ÷ term, inc. VAT
- Term
- 3 Sept 2026 → 8 Mar 2027 · 6 months
- Reference
ocds-h6vhtk-06f1f0
- Ends · in 130 days
ES RDE 087 - Lowlands Peat Evidence Synthesis and knowledge gaps
ENVIRONMENT AGENCY · Other public body
Incumbent: Moffatt and Nichol
Environment Agency Self-Service Direct Award. Since the publication of the 2021 Lowland Agricultural Peat Task Force report, Defra and its delivery partners have funded a wide range of projects exploring the feasibility and implications of …
- Published value
- £98k
- Annual run-rate
- £191kpublished value ÷ term, exc. VAT
- Term
- 2 Sept 2026 → 8 Mar 2027 · 6 months
- Reference
ocds-h6vhtk-0775e6
- Ends · in 130 days
ES RDE 115 - Improving the quality of stack emissions monitoring from new source
ENVIRONMENT AGENCY · Other public body
Incumbent: NPL Management Limited
Environment Agency Self-Service Direct Award. This project will generate the evidence needed to support robust monitoring methodologies, improve consistency of application across sectors and inform future technical guidance and standard dev…
- Published value
- £90k
- Annual run-rate
- —term under 6 months
- Term
- 19 Oct 2026 → 8 Mar 2027 · 5 months
- Reference
ocds-h6vhtk-078a86
- Ends · in 130 days
Telbot Engineering Support work
Sellafield Limited · Other public body · North West England
Incumbent: Cumbria O&M Services Ltd
Telbot Engineering Support work
- Published value
- £46k
- Annual run-rate
- £83kpublished value ÷ term, exc. VAT
- Term
- 17 Aug 2026 → 8 Mar 2027 · 7 months
- Reference
ocds-h6vhtk-06e5bd
- Ends · in 130 days
Furniture for Extra Care Scheme
Saxon Weald · Other public body · South East England
Incumbent: Furniture Resource Centre
Procurement of furniture for Extra Care residential schemes to a contract value 0f £30,000. This contract was procured via Procurement for Housing framework agreement Interior Decorating and Furnishing Solutions Lot 4 Furniture, Tender Noti…
- Published value
- £30kinc. VAT as published
- Annual run-rate
- £31kpublished value ÷ term, inc. VAT
- Term
- 20 Mar 2026 → 8 Mar 2027 · 1 yr
- Reference
ocds-h6vhtk-06af73
- Ends · in 131 daysExtension option · up to 9 Mar 2029
Delivery and Supply of Fuel - East Depots
Transpennine Trains Limited · Other public body
Incumbent: ESSAR OIL (UK) LIMITED
The principal scope of this procurement activity is for supply and delivery of marked Gas Oil, also referred to as Red Diesel, that complies with the requirements set out in BS EN590.
- Published value
- £7.1m
- Annual run-rate
- £7.1mpublished value ÷ term, exc. VAT
- Term
- 11 Mar 2026 → 9 Mar 2027 · 1 yr · up to 9 Mar 2029 with extensions
- Reference
ocds-h6vhtk-0593c8
- Ends · in 131 days
Training Courses
Plymouth Community Homes · Other public body · South West England
Incumbent: SSG Training and Consultancy
Mandatory job specific training courses such as IOSH, Legionella, Manual Handling, working at heights and scaffold awareness
- Published value
- £49k
- Annual run-rate
- £50kpublished value ÷ term, exc. VAT
- Term
- 13 Mar 2026 → 9 Mar 2027 · 1 yr
- Reference
ocds-h6vhtk-0669d6
- Ends · in 132 days
RBRmaestro - Custom Float Senors
National Oceanography Centre · Other public body · South East England
Incumbent: RS Aqua Ltd
This contract was placed for the provision of a bespoke float with custom sensor suites and the calibration of the float. The contract also allows for the extended warranty of 12 months to cover the projects timeline.
- Published value
- £37k
- Annual run-rate
- £18kpublished value ÷ term, exc. VAT
- Term
- 10 Mar 2025 → 10 Mar 2027 · 2 yrs
- Reference
ocds-h6vhtk-04ead6
- Ends · in 133 days
Fire and Intruder Alarm Contract
Cell & Gene Therapy Catapult · Other public body
Incumbent: ADT Fire & Security
Service and maintenance contract for the fire and intruder alarm systems on the CGTC MIC Braintree site.
- Published value
- £82kinc. VAT as published
- Annual run-rate
- £82kpublished value ÷ term, inc. VAT
- Term
- 12 Mar 2026 → 11 Mar 2027 · 1 yr
- Reference
ocds-h6vhtk-0673c0
- Ends · in 133 days
Greenwich Park Landscape Maintenance and Welfare Refurbishment Works
The Royal Parks Ltd · Other public body · Greater London
Incumbent: Collins Contractors Ltd
TRP is seeking tenders for refurbishment works to the Greenwich Park Landscape Maintenance Welfare Building at Vanbrugh Yard. Works include upgrading welfare facilities, creating an accessible WC, refurbishing the office, replacing windows,…
- Published value
- £571inc. VAT as published
- Annual run-rate
- —term under 6 months
- Term
- 28 Oct 2026 → 11 Mar 2027 · 4 months
- Reference
ocds-h6vhtk-0790c4
- Ends · in 134 days
OS Mastermap Renewal 2026
Greensquareaccord · Other public body
Incumbent: ESRI (UK) Limited
GSA requires licensed access to Ordnance Survey (OS) mapping datasets to support operational planning, geographic analysis, and data management activities. The supplier must provide the following: 1. OS MasterMap Topography Layer 2. OS Addr…
- Published value
- £67k
- Annual run-rate
- £68kpublished value ÷ term, exc. VAT
- Term
- 13 Mar 2026 → 12 Mar 2027 · 1 yr
- Reference
ocds-h6vhtk-0668b0
- Estimated end · in 135 days
Geographical Data and Services
NORTHERN GAS NETWORKS LIMITED · Other public body · Yorkshire and the Humber
Incumbent not published · Last contest: 3 bids
The new Supplier will supply core datasets for network operation - OS MasterMap Topography, AddressBase plus with the option of upgrading to AddressBase Premium, OS Highways Network with Routing and Asset Management and OS Green Space - as …
- Published value
- £2.6m
- Annual run-rate
- —start date not published
- Term
- Estimated end 13 Mar 2027 · start not published
- Reference
ocds-h6vhtk-03fc60
- Estimated end · in 135 daysPanel · 3 suppliers
Fume Cupboards/Fume Hoods
CENTRE FOR PROCESS INNOVATION LIMITED · Other public body · Nationwide (UK)
Panel: Fisher Scientific UK, SciQuip Ltd, VWR International Ltd · Last contest: 7 bids
Supply of fume cupboards/fume hoods.
- Published value
- £5.0m
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 13 Mar 2027 · start not published
- Reference
ocds-h6vhtk-039921
- Estimated end · in 135 days
Woolwich Ferry Linkspan Maintenance
Docklands Light Railway Limited · Other public body · Nationwide (UK), Greater London
Incumbent: Talleres Zitron S.A. UK Branch · Last contest: 2 bids (2 SME) · awarded 32% under the estimate
Contract for the maintenance of Woolwich Ferry Linkspans: Each Woolwich Ferry terminal contains two Linkspans which act as a drawbridge to provide vehicles access and egress between the ferry and the terminals.
Re-procurement plannedWoolwich Ferry Linkspan Maintenance
- Published value
- £813k
- Annual run-rate
- —start date not published
- Term
- Estimated end 13 Mar 2027 · start not published
- Reference
ocds-h6vhtk-033eaf
- Ends · in 135 days
3D XRAY Refurb of RDIS LDA
Sellafield Limited · Other public body
Incumbent: 3D XRAY Limited
The linear diode array is an OEM item only manufactured by 3D X-ray
- Published value
- £109k
- Annual run-rate
- £109kpublished value ÷ term, exc. VAT
- Term
- 13 Mar 2026 → 13 Mar 2027 · 1 yr
- Reference
ocds-h6vhtk-06699e
- Ends · in 135 days
Igloo Video immersion system
Sellafield Limited · Other public body
Incumbent: Igloo Vision Limited
A video immersion system has been procured to enhance on‑site capability for remote collaboration and operational support. The system will provide group connectivity to off‑site locations, enable real‑time ROV feed visualisation, support BI…
- Published value
- £57k
- Annual run-rate
- £57kpublished value ÷ term, exc. VAT
- Term
- 13 Mar 2026 → 13 Mar 2027 · 1 yr
- Reference
ocds-h6vhtk-0669ee
- Ends · in 135 days
Asset Tracking Software
Ofcom · Other public body
Incumbent: boxxe Limited
This contract is for asset tracking software.
- Published value
- £42kinc. VAT as published
- Annual run-rate
- £42kpublished value ÷ term, inc. VAT
- Term
- 13 Mar 2026 → 13 Mar 2027 · 1 yr
- Reference
ocds-h6vhtk-061220
- Ends · in 135 days
Rapid Rail Surveys
Sellafield Limited · Other public body
Incumbent: Rapid Rail
Rapid rail will undertake comprehensive on site condition surveys (visual inspections) of all components within the FGMSP & PFSP SHM crane rail systems.
- Published value
- £40k
- Annual run-rate
- £40kpublished value ÷ term, exc. VAT
- Term
- 13 Mar 2026 → 13 Mar 2027 · 1 yr
- Reference
ocds-h6vhtk-066a14
- Ends · in 136 days
DDaT26019-Software licences
UKSBS · Other public body · Nationwide (UK)
Incumbent: Softcat Plc
***Please note this is an award notice, not a call for competition*** UK Shared Business Services (UK SBS) had a requirement for the supply of E-learning Software Subscription. This procurement is being concluded following a limited competi…
- Published value
- £12k
- Annual run-rate
- £12kpublished value ÷ term, exc. VAT
- Term
- 27 Feb 2026 → 14 Mar 2027 · 1.1 yrs
- Reference
ocds-h6vhtk-0666fc
- Ends · in 137 daysExtension option
Design and Build Works for Mains Sewer Connection at High Lodge
Forestry Commission · Other public body · East of England
Incumbent: ARTHUR CIVIL ENGINEERING LIMITED · Last contest: awarded 7% over the estimate
Connection of High Lodge Forest Centre to the mains sewer, approximately 2.4 km from the current discharge point. A Section 106 agreement with Anglian Water is already in place, and a preferred route for the connection has been identified.
- Published value
- £1.1m
- Annual run-rate
- —not computed
- Term
- 16 Sept 2026 → 15 Mar 2027 · 6 months
- Reference
ocds-h6vhtk-0661b3
- Ends · in 137 days
NBI Energy Centre - CHP Engines - Next Generation Infrastructure Programme
JOHN INNES CENTRE · Other public body · East of England
Incumbent: 2G Energy Ltd
This package of works forms part of the Next Generation Infrastructure (NGI) Programme, a funded development programme looking to develop the facilities across Norwich Research Park to transform the existing capabilities of John Innes Centr…
- Published value
- £747k
- Annual run-rate
- £1.1mpublished value ÷ term, exc. VAT
- Term
- 8 Jul 2026 → 15 Mar 2027 · 8 months
- Reference
ocds-h6vhtk-06bc7e
- Ends · in 137 days
HII Accelerator Continuation
CENTRE FOR PROCESS INNOVATION LIMITED · Other public body · North East England
Incumbent: Sustainable Venture Development Partners Ltd
The HII consortium has a multifaceted approach supporting several work programmes. One led by CPI of the HVMC, intends to partner with an ecosystem stakeholder to design, build and implement a hydrogen accelerator in collaboration with the …
- Published value
- £160k
- Annual run-rate
- £160kpublished value ÷ term, exc. VAT
- Term
- 16 Mar 2026 → 15 Mar 2027 · 1 yr
- Reference
ocds-h6vhtk-0666bf
- Ends · in 137 days
MFF164-01 aerial works 2025-28
Peak District National Park Authority · Other public body · North West England, Yorkshire and the Humber, East Midlands
Incumbent: S.J. CONTRACTING SERVICES LIMITED
This framework mini-competition covers 1 Work Packages being tendered collectively as mini-competition 01 under the MFF164 Open Framework. The Works Packages comprise a programme of works from September 2025 to March 2028; The objectives of…
- Published value
- £142k
- Annual run-rate
- £153kpublished value ÷ term, exc. VAT
- Term
- 11 Apr 2026 → 15 Mar 2027 · 11 months
- Reference
ocds-h6vhtk-06806c
- Ends · in 137 days
ES RDE 094 - Water Environment Value Implementation
ENVIRONMENT AGENCY · Other public body
Incumbent: UEA Consulting Limited
Environment Agency Self-Service Direct Award. The purpose of this contract is to integrate the new Water Environment Benefits (WEB) values across the Environment Agency's key valuation and appraisal tools, including the Common Valuation Fra…
- Published value
- £115k
- Annual run-rate
- —not computed
- Term
- 26 Sept 2026 → 15 Mar 2027 · 6 months
- Reference
ocds-h6vhtk-077eb2
- Ends · in 137 days
MFF167 2025-2028 Moorland Restoration Ground Works Package 4 Westend Head Swains Greave Planting Works
Peak District National Park Authority · Other public body · North East England, North West England, Yorkshire and the Humber, East Midlands
Incumbent: UPLAND ENVIRONMENTAL LTD
1.The objective of this Contract is to deliver a suite of Moorland Restoration Works on 2 areas in the Upper Derwent Valley in the Peak District National Park. The sites are split into 6 packages of Works. The aim of the Works suites are to…
- Published value
- £113k
- Annual run-rate
- £136kpublished value ÷ term, exc. VAT
- Term
- 18 May 2026 → 15 Mar 2027 · 10 months
- Reference
ocds-h6vhtk-05594f
- Ends · in 137 days
Lot 1
Peak District National Park Authority · Other public body · Yorkshire and the Humber
Incumbent: N66 LTD
- Published value
- £70k
- Annual run-rate
- £67kpublished value ÷ term, exc. VAT
- Term
- 3 Mar 2026 → 15 Mar 2027 · 1 yr
- Reference
ocds-h6vhtk-05ea49
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.