Retender radar: UK public contracts ending soon

Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the next 24 months

Showing 196–210

  1. Ends · in 624 daysExtension option · up to 13 Jul 2030Buyer plans to re-tender 3 Apr 2030

    Electrical Materials + Power Tools

    Delta Housing Limited · Other public body · East of England

    Incumbent: Edmundson Electrical Limited

    Supply of below goods to CHP: Lot 1 - Electrical Materials Lot 2 - Power Tools Lot 3 - Hand Tools/Consumables The primary objective of the Contract is to supply CHP with the required goods under each Lot, enabling us to effectively maintain…

    Published value
    £2.5minc. VAT as published
    Annual run-rate
    £833kpublished value ÷ term, inc. VAT
    Term
    14 Jul 2025 → 13 Jul 2028 · 3 yrs · up to 13 Jul 2030 with extensions
    Reference
    ocds-h6vhtk-04fcbb
  2. Ends · in 624 daysExtension option · up to 13 Jul 2030Buyer plans to re-tender 3 Apr 2030

    Hand Tools / Consumables

    Delta Housing Limited · Other public body · East of England

    Incumbent: CHANDLER MATERIAL SUPPLIES LIMITED

    Supply of below goods to CHP: Lot 1 - Electrical Materials Lot 2 - Power Tools Lot 3 - Hand Tools/Consumables The primary objective of the Contract is to supply CHP with the required goods under each Lot, enabling us to effectively maintain…

    Published value
    £315kinc. VAT as published
    Annual run-rate
    £105kpublished value ÷ term, inc. VAT
    Term
    14 Jul 2025 → 13 Jul 2028 · 3 yrs · up to 13 Jul 2030 with extensions
    Reference
    ocds-h6vhtk-04fcbb
  3. Estimated end · in 626 daysCall-off

    TPPL Newark and Sherwood District Council – Highland Council DPS Category 3 – Electric Charging Infrastructure (16617)

    Newark And Sherwood District Council · Local authority · Nationwide (UK), Yorkshire and the Humber, East Midlands, East of England, South East England, South West England

    Incumbent: Hanger 19 Ltd tas Park & Recharge · Last contest: 4 bids (0 SME)

    • Battery chargers
    Published value
    £12kvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 15 Jul 2028 · start not published
    Reference
    ocds-h6vhtk-02de73
  4. Ends · in 642 days

    Provision of EEG Electrodes

    Hull University Teaching Hospitals NHS Trust · Central government · Yorkshire and the Humber

    Incumbent: Neurogen Limited

    Provision of EEG Electrodes to Hull University Teaching Hospitals NHS Foundation Trust.

    Published value
    £42k
    Annual run-rate
    £21kpublished value ÷ term, exc. VAT
    Term
    1 Aug 2026 → 31 Jul 2028 · 2 yrs
    Reference
    ocds-h6vhtk-06e471
  5. Ends · in 642 days

    SCH - Uninterruptible Power Supply (UPS)

    Sheffield Children's NHS Foundation Trust · Central government · Yorkshire and the Humber

    Incumbent: SECURE POWER LTD

    Provision of maintenance and repair services for the Trust’s uninterruptible power supply (UPS) systems.

    Published value
    £21k
    Annual run-rate
    £11kpublished value ÷ term, exc. VAT
    Term
    3 Aug 2026 → 31 Jul 2028 · 2 yrs
    Reference
    ocds-h6vhtk-06e658
  6. Ends · in 652 daysExtension option · up to 10 Aug 2030Buyer plans to re-tender 1 Mar 2030

    Supply of Electrical Materials

    East Suffolk Council · Local authority · East of England

    Incumbent: Edmundson Electrical Limited · Last contest: awarded at the estimate

    East Suffolk Council is looking to appoint a supplier for the following, • Supply and Delivery of electrical products and associated accessories to the East Suffolk Council, Housing Repairs and Maintenance Team Depot Stores at Rotterdam Roa…

    Published value
    £2.5m
    Annual run-rate
    £917kpublished value ÷ term, exc. VAT
    Term
    19 Nov 2025 → 10 Aug 2028 · 2.8 yrs · up to 10 Aug 2030 with extensions
    Reference
    ocds-h6vhtk-051385
  7. Estimated end · in 660 daysFramework record

    C397 - 33kV Package Substations

    Northern Ireland Electricity Networks Limited · Northern Ireland

    Incumbent: B&S Group Ltd

    • Substation equipment
    Published value
    £4.0mpublished ceiling for the whole framework
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 18 Aug 2028 · start not published
    Reference
    ocds-h6vhtk-034064
  8. Estimated end · in 661 daysFramework recordPanel · 27 suppliers

    Electric Vehicle Charging Infrastructure

    Welsh Government - Commercial Delivery · Wales (Cymru)

    Panel: ARCADIS CONSULTING (UK) LIMITED, Atkins Limited, Blink Charging UK Limited +24 more

    • Chargers
    Published value
    £100mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 19 Aug 2028 · start not published
    Reference
    ocds-h6vhtk-042b61
  9. Ends · in 673 days

    UKRI-4496 - Synchrotron Arbitrary Waveform Generators

    UK Research and Innovation · Central government · South East England

    Incumbent: Energy Technology S.R.L. · Last contest: 5 bids · awarded 20% under the estimate

    Manufacture and Supply of forty (40) 210kW bipolar pulsed power supplies for the trim quadrupole and steering dipole magnets in ISIS.

    • Power supply transformers
    Published value
    £2.0m
    Annual run-rate
    —start date not published
    Term
    Ends 31 Aug 2028 · start not published
    Reference
    ocds-h6vhtk-05163a
  10. Ends · in 673 daysExtension option

    Renewal of service contract for the power back-up generator control systems for Plowright and the Energy Centre (EC1)

    THE PIRBRIGHT INSTITUTE · Other public body · South East England

    Incumbent: Total Energy Controls Limited

    Maintenance of generator control systems equipment including an exact mock-up of the control systems so that install upgrades and new parts can be tested these before added to our live system here on site. The site mock-up is an invaluable …

    Published value
    £30k
    Annual run-rate
    £10kpublished value ÷ term, exc. VAT
    Term
    1 Sept 2025 → 31 Aug 2028 · 3 yrs
    Reference
    ocds-h6vhtk-058f0f
  11. Ends · in 674 daysFramework recordPanel · 17 suppliers

    YPO - 001206 Vending Machine and Water Cooler Solutions

    YPO · Nationwide (UK)

    Panel: Alpine Vending Co. Ltd, BWT UK Ltd, Culligan (UK) Limited +14 more

    • Water coolers
    Published value
    £100mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 1 Sept 2028 · start not published
    Reference
    ocds-h6vhtk-047347
  12. Ends · in 680 daysExtension option · up to 7 Sept 2030

    ESC044/2025 - Purchase of steel wire armoured 27 multi-core traffic signal cables and other associated cables

    Middlesbrough Council · Local authority · North East England

    Incumbent: Edmundson Electrical Limited

    A contract for the purchase and supply of steel wire armoured 27 multi-core traffic signal cables and other associated cables.

    Published value
    £250k
    Annual run-rate
    £97kpublished value ÷ term, exc. VAT
    Term
    7 Feb 2026 → 7 Sept 2028 · 2.6 yrs · up to 7 Sept 2030 with extensions
    Reference
    ocds-h6vhtk-050b61
  13. Estimated end · in 693 daysCall-off

    Supply of 33 & 11kV Distribution Capacitor Banks

    Northern Ireland Electricity Networks Limited · Nationwide (UK), Northern Ireland

    Incumbent: SPLHV Consultancy Limited

    NIE Networks Limited seeks to appoint a suitably qualified and experienced organisation on framework for the supply of 11kV & 33kV Distribution Capacitor Banks.

    • Capacitor banks
    Published value
    £2.0mvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 20 Sept 2028 · start not published
    Reference
    ocds-h6vhtk-031eef
  14. Estimated end · in 694 days

    Cryomodule Thermal Shield

    UK Research and Innovation · Central government · North West England

    Incumbent: INOX India Limited · Last contest: 3 bids · awarded 37% under the estimate

    Production and supply of HB650 Cryomodule Thermal Shield

    • Particle accelerators
    Published value
    £118k
    Annual run-rate
    —start date not published
    Term
    Estimated end 21 Sept 2028 · start not published
    Reference
    ocds-h6vhtk-04a305
  15. Estimated end · in 701 daysCall-off

    TPPL South Derbyshire District Council– Highland Council DPS Category 3 – 2 x 7kw Dual Charging Points & 1 x 40kw Dual Charging Point (16736)

    South Derbyshire District Council · Local authority · Nationwide (UK), Yorkshire and the Humber, East Midlands, East of England, South East England, South West England

    Incumbent: Hanger 19 Ltd tas Park & Recharge · Last contest: 4 bids (0 SME)

    • Battery chargers
    Published value
    £32kvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 28 Sept 2028 · start not published
    Reference
    ocds-h6vhtk-02de73

When contracts end · Electrical machinery
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

215 contracts and agreements end within 24 months, 325 in total · £150m published GBP values end in the next 24 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months47
  2. 3–6 months67
  3. 6–12 months41
  4. 12–24 months60

Top sectors, next 24 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.