Retender radar: UK public contracts ending soon

Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the next 24 months

Showing 2,101–2,115

  1. Estimated end · in 628 days

    PORTABLE APPLIANCE TESTING AND FIXED WIRE TESTING - UNIVERSITY OF ABERDEEN

    University of Aberdeen · Education · Scotland

    Incumbent: Norwood Electrical (UK) Ltd · Last contest: 11 bids (6 SME)

    AWARD NOTICE for a single contractor to provide a service for Inspection and Testing of E.I.C.R. and PAT as per previously advertised Invitation To Tender.

    • Technical testing services
    Published value
    £268k
    Annual run-rate
    —start date not published
    Term
    Estimated end 17 Jul 2028 · start not published
    Reference
    ocds-h6vhtk-06909d
  2. Ends · in 628 daysExtension option · up to 17 Jul 2029

    DIO Brunei Electrical Works Services MTC

    Defence Infrastructure Organisation - Ministry of Defence · Central government

    Incumbent: Massutera Engineering Sdn. Bhd.

    The purpose of the EWS MTC is to carry out reactive and planned electrical works within the BFB estate. The Electrical MTC ensures the estate remains compliant while reducing risk, and health and safety related issues.

    Published value
    BND 367,963
    Annual run-rate
    —not a GBP value
    Term
    18 Jul 2025 → 17 Jul 2028 · 3 yrs · up to 17 Jul 2029 with extensions
    Reference
    ocds-h6vhtk-050fae
  3. Ends · in 630 days

    Railway Museum Great Hall Road Repairs QS Service

    Science Museum Group · Central government

    Incumbent: APPLEYARD & TREW LLP · Last contest: awarded 6% under the estimate

    Within Great Hall at the National Railway Museum (York) there are 24 roads surrounding a turntable. We are in the process of moving a number of our rail vehicles into new locations and have discovered roads that are failing structurally, ca…

    Published value
    £56k
    Annual run-rate
    £28kpublished value ÷ term, exc. VAT
    Term
    20 Jul 2026 → 19 Jul 2028 · 2 yrs
    Reference
    ocds-h6vhtk-068579
  4. Estimated end · in 632 daysCall-off

    The scope of work is to deliver a Secure Service Edge (SSE) solution to enable Zero Trust Network Access (ZTNA).

    Scotland Gas Networks (SGN) · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands

    Incumbent not published · Last contest: 21 bids (6 SME)

    • Environmental monitoring for construction
    Published value
    Not publishedvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 21 Jul 2028 · start not published
    Reference
    ocds-h6vhtk-02874b
  5. Estimated end · in 633 daysFramework recordPanel · 4 suppliers

    Compliance Auditing & Quality Assurance Services Framework

    Central and Cecil Housing Trust · Housing · Nationwide (UK)

    Panel: David Miles and Partners Ltd, GCS Compliance Ltd, Gas Advisory Services Ltd T/A Phoenix Compliancy Management +1 more

    • Technical testing, analysis and consultancy services
    Published value
    £50mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 22 Jul 2028 · start not published
    Reference
    ocds-h6vhtk-044785
  6. Estimated end · in 633 daysFramework recordPanel · 7 suppliers

    Building Safety Consultancy & Training Services Framework

    Central and Cecil Housing Trust · Housing · Nationwide (UK)

    Panel: Buro Happold Ltd, Delco Safety Compliance, FIRNTEC LTD +4 more

    • Health and safety services
    Published value
    £50mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 22 Jul 2028 · start not published
    Reference
    ocds-h6vhtk-04478a
  7. Estimated end · in 633 daysFramework recordPanel · 5 suppliers

    Meters, Billing, District Heating Framework

    ProcurePublic Limited · Nationwide (UK)

    Panel: Insite Energy, Nottingham City Council, Switch2 Energy Limited +2 more

    • Technical testing, analysis and consultancy services
    Published value
    £50mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 22 Jul 2028 · start not published
    Reference
    ocds-h6vhtk-0458ec
  8. Ends · in 633 days

    Provision of architectural and professional services related to Blackbird Leys Community Centre

    Oxford City Council · Local authority · South East England

    Incumbent: Gotch, Saunders & Surridge LLP t/a GSSArchitecture Ltd

    Contract to provide architectural and other professional services relating to a fit-out works project at Blackbird Leys Community Centre

    Published value
    £189kinc. VAT as published
    Annual run-rate
    £63kpublished value ÷ term, inc. VAT
    Term
    22 Jul 2025 → 22 Jul 2028 · 3 yrs
    Reference
    ocds-h6vhtk-0603d6
  9. Ends · in 633 daysExtension option · up to 22 Jul 2029

    Quantity Surveying Services for Externally Funded Property Improvement Grants

    Rhondda Cynon Taf CBC · Other public body · Wales (Cymru)

    Incumbent: ChandlerKBS

    Appointment of Quantitiy Surveying Services for Externally Funded Property Improvement Grants in RCT

    Published value
    £121k
    Annual run-rate
    £60kpublished value ÷ term, exc. VAT
    Term
    23 Jul 2026 → 22 Jul 2028 · 2 yrs · up to 22 Jul 2029 with extensions
    Reference
    ocds-h6vhtk-06ce3b
  10. Estimated end · in 634 days

    Contract

    the Education Authority · Education · Nationwide (UK), Northern Ireland

    Incumbent: GM Design Associates Limited · Last contest: 13 bids (1 SME) · awarded 23% under the estimate

    Appointment of Integrated Consultant Team New SEN Accommodation and associated external site works and traffic management provision to a new site adjacent to Rathore School, 23 Martins Lane, Newry, BT35 8PJ. Approximate services value £250,…

    • Architectural, construction, engineering and inspection services
    Published value
    £192k
    Annual run-rate
    —start date not published
    Term
    Estimated end 23 Jul 2028 · start not published
    Reference
    ocds-h6vhtk-040d76
  11. Estimated end · in 634 days

    Support Services for Sculcoates Bridge Refurbishment Scheme, Kingston Upon Hull, Lot 1a, Direct Award

    Kingston Upon Hull City Council · Local authority · Nationwide (UK), Yorkshire and the Humber

    Incumbent: Mason Clark Associates · Last contest: 18 bids (1 SME)

    • Bridge-inspection services
    Published value
    £500k
    Annual run-rate
    —start date not published
    Term
    Estimated end 23 Jul 2028 · start not published
    Reference
    ocds-h6vhtk-02e22f
  12. Estimated end · in 636 daysFramework record

    Property Design, Safety Consultancy and Works Project Management Services

    B3Living · East of England

    Incumbent: Frankham Consultancy Group Ltd

    • Construction project management services
    Published value
    £600kpublished ceiling for the whole framework
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 25 Jul 2028 · start not published
    Reference
    ocds-h6vhtk-04474b
  13. Estimated end · in 637 days

    Provision of Architect for the Charles Huang Advanced Technology & Innovation Centre (CH-ATIC) (RIBA Stages 0-7)

    University of Strathclyde · Education · Scotland

    Incumbent: HLMAD Limited t/a HLM Architects · Last contest: 5 bids (4 SME)

    The University of Strathclyde has awarded a Contract for the Provision of Architect for the Charles Huang Advanced Technology & Innovation Centre (CH-ATIC) (RIBA Stages 0-7) (UOS-30807-2023).

    • Architectural, construction, engineering and inspection services
    Published value
    £685k
    Annual run-rate
    —start date not published
    Term
    Estimated end 26 Jul 2028 · start not published
    Reference
    ocds-h6vhtk-04294b
  14. Estimated end · in 638 daysCall-off

    CO Construction - Part A ASTI Onshore 400kV Substation - LT379 New Deer 2

    SSE PLC · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands

    Incumbent not published · Last contest: 6 bids (2 SME)

    • Engineering design services
    Published value
    Not publishedvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 27 Jul 2028 · start not published
    Reference
    ocds-h6vhtk-02874c
  15. Estimated end · in 638 daysCall-off

    CO Construction - Initial Works (Part A) ASTI Onshore 400kV OHL - LT037 Beauly to Blackhillock - 1225

    SSE PLC · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands

    Incumbent not published · Last contest: 6 bids (2 SME)

    • Engineering design services
    Published value
    Not publishedvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 27 Jul 2028 · start not published
    Reference
    ocds-h6vhtk-02874c

When contracts end · Architectural, construction, engineering
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

2,296 contracts and agreements end within 24 months, 3,304 in total · £1.2bn published GBP values end in the next 24 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months396
  2. 3–6 months495
  3. 6–12 months530
  4. 12–24 months875

Top sectors, next 24 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.