Retender radar: UK public contracts ending soon

Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the next 24 months

Showing 2,116–2,130

  1. Estimated end · in 638 daysCall-off

    CO Construction - Initial Works (Part A) ASTI Onshore 400kV OHL - LT359 Blackhillock to Peterhead - 1225

    SSE PLC · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands

    Incumbent not published · Last contest: 6 bids (2 SME)

    • Engineering design services
    Published value
    Not publishedvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 27 Jul 2028 · start not published
    Reference
    ocds-h6vhtk-02874c
  2. Ends · in 639 days

    Torre Abbey New Beginnings Chapter 1 Project Management Consultancy Services

    Torbay Council · Local authority · South West England

    Incumbent: Peninsula Project Consulting Ltd

    Torbay Council requires a suitably qualified and experienced Heritage Project Manager & Contract Administrator to work on Torre Abbey New Beginnings Chapter 1.

    Published value
    £70k
    Annual run-rate
    £23kpublished value ÷ term, exc. VAT
    Term
    30 Jul 2025 → 28 Jul 2028 · 3 yrs
    Reference
    ocds-h6vhtk-055808
  3. Estimated end · in 640 days

    Contract

    Woven Housing Association Ltd · Housing · Northern Ireland

    Incumbent: C T S PROJECTS LTD · Last contest: 4 bids (1 SME) · awarded 21% under the estimate

    The project is for the provision of Compliance Certification and Remedial Works in respect of, but not limited to: • Domestic Gas Fired heating appliances and central heating and water heating installations. • Communal/Commercial Gas Fired …

    • Technical inspection and testing services
    Published value
    £5.9m
    Annual run-rate
    —start date not published
    Term
    Estimated end 29 Jul 2028 · start not published
    Reference
    ocds-h6vhtk-04de9d
  4. Estimated end · in 640 days

    FW Services - Offshore Mechanical Engineering - Multi Site 0427

    SSE PLC · Nationwide (UK)

    Incumbent: Cowi UK LTD · Last contest: 11 bids

    FW Services - Offshore Mechanical Engineering - Multi Site 0427

    • Engineering design services
    Published value
    £246k
    Annual run-rate
    —start date not published
    Term
    Estimated end 29 Jul 2028 · start not published
    Reference
    ocds-h6vhtk-042549
  5. Estimated end · in 641 daysCall-off

    FW Services - Supply & Deliver - Low Voltage Shrouding - Multi Site 1030

    SSE PLC · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands

    Incumbent not published · Last contest: 6 bids (2 SME)

    • Engineering design services
    Published value
    Not publishedvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 30 Jul 2028 · start not published
    Reference
    ocds-h6vhtk-02874c
  6. Estimated end · in 641 daysCall-off

    FW Services - Supply & Deliver - Low Voltage Shrouding - Multi Site 1030

    SSE PLC · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands

    Incumbent not published · Last contest: 6 bids (2 SME)

    • Engineering design services
    Published value
    Not publishedvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 30 Jul 2028 · start not published
    Reference
    ocds-h6vhtk-02874c
  7. Estimated end · in 642 daysCall-off

    Renewable Energy Generation

    NETWORK RAIL INFRASTRUCTURE LIMITED · Other public body · Nationwide (UK), Greater London

    Incumbent: JOHNSON CONTROLS BUILDING EFFICIENCY UK LIMITED · Last contest: 1 bid

    Network Rail (NR) owns, operates, and develops Britain’s railway infrastructure. That is 20,000 miles of track, 30,000 bridges, tunnels and viaducts and the thousands of signals, level crossings and stations. We manage 20 of the UK's larges…

    • Energy and related services
    Published value
    £14mvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 31 Jul 2028 · start not published
    Reference
    ocds-h6vhtk-030d1a
  8. Estimated end · in 642 daysCall-off

    Lighting and Controls Upgrade

    NETWORK RAIL INFRASTRUCTURE LIMITED · Other public body · Nationwide (UK), Greater London

    Incumbent: JOHNSON CONTROLS BUILDING EFFICIENCY UK LIMITED · Last contest: 2 bids

    Network Rail (NR) owns, operates, and develops Britain’s railway infrastructure. That is 20,000 miles of track, 30,000 bridges, tunnels and viaducts and the thousands of signals, level crossings and stations. We manage 20 of the UK's larges…

    • Energy and related services
    Published value
    £7.0mvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 31 Jul 2028 · start not published
    Reference
    ocds-h6vhtk-030d1a
  9. Estimated end · in 642 daysCall-off

    Upgrade to BEMS

    NETWORK RAIL INFRASTRUCTURE LIMITED · Other public body · Nationwide (UK), Greater London

    Incumbent: JOHNSON CONTROLS BUILDING EFFICIENCY UK LIMITED · Last contest: 3 bids

    Network Rail (NR) owns, operates, and develops Britain’s railway infrastructure. That is 20,000 miles of track, 30,000 bridges, tunnels and viaducts and the thousands of signals, level crossings and stations. We manage 20 of the UK's larges…

    • Energy and related services
    Published value
    £6.0mvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 31 Jul 2028 · start not published
    Reference
    ocds-h6vhtk-030d1a
  10. Estimated end · in 642 daysCall-off

    Upgrade to Heating and Cooling Systems

    NETWORK RAIL INFRASTRUCTURE LIMITED · Other public body · Nationwide (UK), Greater London

    Incumbent: Vital Energi Utilities Limited

    Network Rail (NR) owns, operates, and develops Britain’s railway infrastructure. That is 20,000 miles of track, 30,000 bridges, tunnels and viaducts and the thousands of signals, level crossings and stations. We manage 20 of the UK's larges…

    • Energy and related services
    Published value
    £4.8mvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 31 Jul 2028 · start not published
    Reference
    ocds-h6vhtk-030d1a
  11. Estimated end · in 642 daysCall-off

    Upgrade to Heating and Cooling Systems

    NETWORK RAIL INFRASTRUCTURE LIMITED · Other public body · Nationwide (UK), Greater London

    Incumbent: B&M McHugh Limited

    Network Rail (NR) owns, operates, and develops Britain’s railway infrastructure. That is 20,000 miles of track, 30,000 bridges, tunnels and viaducts and the thousands of signals, level crossings and stations. We manage 20 of the UK's larges…

    • Energy and related services
    Published value
    £3.2mvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 31 Jul 2028 · start not published
    Reference
    ocds-h6vhtk-030d1a
  12. Estimated end · in 642 daysCall-off

    Upgrade Air Handling Units

    NETWORK RAIL INFRASTRUCTURE LIMITED · Other public body · Nationwide (UK), Greater London

    Incumbent: JOHNSON CONTROLS BUILDING EFFICIENCY UK LIMITED · Last contest: 2 bids

    Network Rail (NR) owns, operates, and develops Britain’s railway infrastructure. That is 20,000 miles of track, 30,000 bridges, tunnels and viaducts and the thousands of signals, level crossings and stations. We manage 20 of the UK's larges…

    • Energy and related services
    Published value
    £2.0mvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 31 Jul 2028 · start not published
    Reference
    ocds-h6vhtk-030d1a
  13. Estimated end · in 642 daysCall-off

    Upgrade Building Fabric

    NETWORK RAIL INFRASTRUCTURE LIMITED · Other public body · Nationwide (UK), Greater London

    Incumbent: Taziker Industrial

    Network Rail (NR) owns, operates, and develops Britain’s railway infrastructure. That is 20,000 miles of track, 30,000 bridges, tunnels and viaducts and the thousands of signals, level crossings and stations. We manage 20 of the UK's larges…

    • Energy and related services
    Published value
    £1.5mvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 31 Jul 2028 · start not published
    Reference
    ocds-h6vhtk-030d1a
  14. Estimated end · in 642 daysCall-off

    Upgrade Building Fabric

    NETWORK RAIL INFRASTRUCTURE LIMITED · Other public body · Nationwide (UK), Greater London

    Incumbent: B&M McHugh Limited

    Network Rail (NR) owns, operates, and develops Britain’s railway infrastructure. That is 20,000 miles of track, 30,000 bridges, tunnels and viaducts and the thousands of signals, level crossings and stations. We manage 20 of the UK's larges…

    • Energy and related services
    Published value
    £1.0mvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 31 Jul 2028 · start not published
    Reference
    ocds-h6vhtk-030d1a
  15. Ends · in 642 daysFramework record

    National Professional Services Framework

    Alder Hey Children's NHS Foundation Trust · NHS & health · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England

    Incumbent not published

    • Architectural, construction, engineering and inspection services
    Published value
    £800mpublished ceiling for the whole framework
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Ends 31 Jul 2028 · start not published
    Reference
    ocds-h6vhtk-04577a

When contracts end · Architectural, construction, engineering
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

2,296 contracts and agreements end within 24 months, 3,304 in total · £1.2bn published GBP values end in the next 24 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months396
  2. 3–6 months495
  3. 6–12 months530
  4. 12–24 months875

Top sectors, next 24 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.