Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the next 24 months
Showing 211–215
- Estimated end · in 709 days
C347 (2020) 275/110/22kV Transformers
Northern Ireland Electricity Networks Limited · Northern Ireland
Incumbent: Kolektor Etra
- Published value
- £21m
- Annual run-rate
- —start date not published
- Term
- Estimated end 6 Oct 2028 · start not published
- Reference
ocds-h6vhtk-0595d8
- Estimated end · in 710 daysLinked to a framework or DPS
Ships Protective Systems (SPS) Degaussing Control Equipment (DCE) In-Service Support (ISS)
Ministry of Defence · Central government · Nationwide (UK)
Incumbent: Devonport Royal Dockyard Ltd · Last contest: 1 bid
The Defence Equipment & Support (DE&S) Maritime Combat Systems (MCS) Underwater and Electronic Warfare (UEW) team is responsible for providing in-service support (ISS) to Ships Protective Systems (SPS) equipment across the Royal Navy (RN) F…
- Published value
- £42mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 7 Oct 2028 · start not published
- Reference
ocds-h6vhtk-0397c3
- Estimated end · in 710 daysLinked to a framework or DPS
Ships Protective Systems (SPS) Cathodic Protection and Active Shaft Grounding (ISS)
Ministry of Defence · Central government · Nationwide (UK)
Incumbent: Devonport Royal Dockyard Ltd · Last contest: 2 bids
The Defence Equipment & Support (DE&S) Maritime Combat Systems (MCS) Underwater and Electronic Warfare (UEW) team is responsible for providing in-service support (ISS) to Ships Protective Systems (SPS) equipment across the Royal Navy (RN) F…
- Published value
- £42mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 7 Oct 2028 · start not published
- Reference
ocds-h6vhtk-0397c5
- Estimated end · in 727 daysCall-off
TPPL Broadacres Housing Association Highland Council DPS Category 3 – 40-50 x 7kw Home Chargers (18283)
Broadacres Housing Association · Housing · Nationwide (UK), Yorkshire and the Humber, East Midlands, East of England, South East England, South West England
Incumbent: Virtus Energy Ltd · Last contest: 4 bids (0 SME)
- Published value
- £55kvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 24 Oct 2028 · start not published
- Reference
ocds-h6vhtk-02de73
- Estimated end · in 727 daysCall-off
TPPL Broxtowe Borough Council Highland Council DPS Category 3 – Supply and Installation of 2 x Dual 7.4kW Electrical Vehicle Charging Points (16227)
Broxtowe Borough Council · Local authority · Nationwide (UK), Yorkshire and the Humber, East Midlands, East of England, South East England, South West England
Incumbent: Virtus Energy Ltd · Last contest: 4 bids (0 SME)
- Published value
- £14kvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 24 Oct 2028 · start not published
- Reference
ocds-h6vhtk-02de73
When contracts end · Electrical machinery i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
215 contracts and agreements end within 24 months, 325 in total · £150m published GBP values end in the next 24 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 24 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services5,33779Business services: law, marketing, consulting3,94960Transport services (except waste transport)3,69945Construction work2,83672IT services: consulting, software, internet2,35871Architectural, construction, engineering2,29650Repair and maintenance services2,23380Education and training services1,934
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.