Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the next 24 months
Showing 46–60
- Ends · tomorrow
G-Cloud 14 Lot 4
The Minister for the Cabinet Office acting through Crown Commercial Service · Central government · Nationwide (UK)
Incumbent: The Minister for the Cabinet Office acting through Crown Commercial Service · Last contest: 130 bids (64 SME)
Support for Microsoft Products and Services
- Published value
- £1.0bn
- Annual run-rate
- £2.0bnpublished value ÷ term, exc. VAT
- Term
- 28 Apr 2026 → 28 Oct 2026 · 6 months
- Reference
ocds-h6vhtk-043b07
- Ends · tomorrow
R070 - Cemetery Extension Works at Thorntree Cemetery
Middlesbrough Council · Local authority · North East England
Incumbent: White Horse Contractors Limited
We are under additional pressure to deliver the extension works as we have fallen behind deadline. Any further delay could be significantly detrimental to the Council and the Crematorium service.
- Published value
- £1.8m
- Annual run-rate
- —term under 6 months
- Term
- 21 May 2026 → 28 Oct 2026 · 5 months
- Reference
ocds-h6vhtk-06b073
- Ends · tomorrow
Hayman and Lanyon Phase Two Structural Works & Fire Remedials
NHS Property Services Limited · NHS & health
Incumbent: R M Developments Limited
Hayman and Lanyon Phase Two Structural Works & Fire Remedials
- Published value
- £1.5m
- Annual run-rate
- £2.7mpublished value ÷ term, exc. VAT
- Term
- 6 Apr 2026 → 28 Oct 2026 · 7 months
- Reference
ocds-h6vhtk-067660
- Ends · tomorrow
Lithium Battery Storage Containers
National Oceanography Centre · Other public body · South East England
Incumbent: S JONES CONTAINERS LIMITED
The National Oceanography Centre has awarded a contract to S Jones Containers Ltd for the supply and installation of custom-designed lithium-ion battery storage containers. The contract includes the design, manufacture, delivery, installati…
- Published value
- £160kinc. VAT as published
- Annual run-rate
- —term under 6 months
- Term
- 28 Jul 2026 → 28 Oct 2026 · 3 months
- Reference
ocds-h6vhtk-06d526
- Ends · tomorrow
WHTHT - Netcall - Switchboard, Contact centre and IVR
West Hertfordshire Teaching Hospitals NHS Trust · Central government
Incumbent: Netcall Technology Limited
West Hertfordshire Teaching Hospital NHS Trust award for Netcall Switchboard, Contact Centre and Interactive Voice Response.
- Published value
- £86k
- Annual run-rate
- £171kpublished value ÷ term, exc. VAT
- Term
- 29 Apr 2026 → 28 Oct 2026 · 6 months
- Reference
ocds-h6vhtk-06c504
- Ends · tomorrow
C4648 Disability Adaptation Works SR2007824
Cheshire East Council · Local authority · North West England
Incumbent: Brenden Fern Limited
Cheshire East Council has been appointed as the agent for the householders at the address. In our role as agent, we (the council) are designing and specifying the work, appointing a Contractor to carry out the work, and making payments for …
- Published value
- £83k
- Annual run-rate
- £84kpublished value ÷ term, exc. VAT
- Term
- 3 Nov 2025 → 28 Oct 2026 · 1 yr
- Reference
ocds-h6vhtk-05e14a
- Ends · tomorrow
Highgate Wood Fire Alarm And Detection System
London Borough of Haringey · Local authority · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: I MONITOR FS LTD
The Contractor is to Design, Supply, Install, Test and Commission a new Fire Alarm and Detection system for the Admin Block (Block A) school building at Highgate Wood School.
- Published value
- £79k
- Annual run-rate
- £66kpublished value ÷ term, exc. VAT
- Term
- 18 Aug 2025 → 28 Oct 2026 · 1.2 yrs
- Reference
ocds-h6vhtk-06ca3b
- Ends · tomorrowExtension option · up to 28 Apr 2027
TVCA-PROC-0785 - Redcar Central Station Early Contractor Involvement (ECI)
Tees Valley Combined Authority · Local authority · North East England
Incumbent: Morgan Sindall Construction and Infrastructure Ltd
Tees Valley Combined Authority (TVCA) (the ‘Contacting Authority’), part of the Tees Valley Combined Authority Group, has awarded a contract for Redcar Central Station Early Contractor Involvement (ECI), to undertake gap analysis / review o…
- Published value
- £72k
- Annual run-rate
- —term under 6 months
- Term
- 22 Jul 2026 → 28 Oct 2026 · 3 months · up to 28 Apr 2027 with extensions
- Reference
ocds-h6vhtk-06e4e7
- Ends · tomorrow
MEPFS4023 - C2443 Richmond House Retaining Wall/Intrusive Surveys
Corporate Officer of the House of Commons · Central government
Incumbent: Saltash Enterprises Ltd
Intrusive surveys within the moat lightwell of Richmond House. This will be in support of a later project to undertake stabilisation works to the retaining wall and stepped entrance to the moat, enabling new railings to be installed on top …
- Published value
- £65k
- Annual run-rate
- —term under 6 months
- Term
- 29 Jul 2026 → 28 Oct 2026 · 3 months
- Reference
ocds-h6vhtk-06d7a4
- Ends · tomorrow
Fire Alarms Stag Lane School
London Borough of Harrow · Local authority · Greater London
Incumbent: FIRETEC SERVICES LIMITED
Installation of a new fire alarm system. The authority has awarded the contract to the supplier offering the most advantageous tender based on quality, reliability, and ability to meet required delivery timescales. The selected supplier has…
- Published value
- £54k
- Annual run-rate
- £108kpublished value ÷ term, exc. VAT
- Term
- 28 Apr 2026 → 28 Oct 2026 · 6 months
- Reference
ocds-h6vhtk-069839
- Ends · tomorrow
UKRI-5101 MRC LMB Renewal of Nikon iSim TIRF microscopes
UK Research and Innovation · Central government · East of England
Incumbent: Nikon UK, Branch of Nikon Europe BV
UKRI requires a services contract for two Nikon TIRF microscopes
- Published value
- £51k
- Annual run-rate
- £51kpublished value ÷ term, exc. VAT
- Term
- 29 Oct 2025 → 28 Oct 2026 · 1 yr
- Reference
ocds-h6vhtk-0563e6
- Ends · tomorrow
Flooring Works
North East London NHS Foundation Trust · Central government · Nationwide (UK)
Incumbent: Ladon Flooring Limited
Install 6mm WEP plywood sub floor and tile carpet Supply and lay 3mm latex smoothing compound to sub-floor. Supply and install Polyflor Forest FX (colourtbc) 2mm sheet vinyl flat lay in Corridors, WCs.
- Published value
- £51k
- Annual run-rate
- £51kpublished value ÷ term, exc. VAT
- Term
- 27 Oct 2025 → 28 Oct 2026 · 1 yr
- Reference
ocds-h6vhtk-05d972
- Ends · tomorrow
Online training platform
University of Exeter · Central government
Incumbent: Skills For Heal
eLearning - Online training platform
- Published value
- £42kinc. VAT as published
- Annual run-rate
- £42kpublished value ÷ term, inc. VAT
- Term
- 29 Oct 2025 → 28 Oct 2026 · 1 yr
- Reference
ocds-h6vhtk-064cec
- Ends · tomorrow
Strategic Communications Support
MONEY AND PENSIONS SERVICE · Central government · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: Headland Consultancy Limited
Strategic communications support for dashboard services, including development of: - Narrative - Strategy - Framework
- Published value
- £38k
- Annual run-rate
- —term under 6 months
- Term
- 11 Sept 2026 → 28 Oct 2026 · 2 months
- Reference
ocds-h6vhtk-06f6d4
- Ends · tomorrow
DDaT25456 - Cloud monitoring
UK Research and Innovation · Central government · Nationwide (UK)
Incumbent: Softcat Plc
***** THIS IS A CONTRACT DETAILS NOTICE, NOT A CALL FOR COMPETITION ***** This procurement is being concluded following a limited competition procurement exercise. UK Research and Innovation had a requirement for the provision of Cloud moni…
- Published value
- £37k
- Annual run-rate
- £37kpublished value ÷ term, exc. VAT
- Term
- 29 Oct 2025 → 28 Oct 2026 · 1 yr
- Reference
ocds-h6vhtk-05d9b9
When contracts end i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
38,194 contracts and agreements end within 24 months, 60,736 in total · £71bn published GBP values end in the next 24 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 24 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown; 37,710 of 38,194 contracts ending in this window carry a sector classification.
85Health and social work services5,33979Business services: law, marketing, consulting3,93160Transport services (except waste transport)3,68945Construction work2,81672IT services: consulting, software, internet2,34671Architectural, construction, engineering2,28550Repair and maintenance services2,23080Education and training services1,909
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.