Expiring UK Public Contracts: Retender Radar
Explore UK public contracts by expiry date, with buyers, incumbent suppliers and extension options. Estimated end dates are labelled; expiry does not guarantee a new tender.
Contracts ending in the next 3 months
Showing 2,976–3,000
- Ends · in 44 days
CSP26852 - Relocation of Sequencer
UK Research and Innovation · Central government · Nationwide (UK)
Incumbent: Illumina Cambridge Ltd
***** THIS IS A CONTRACT DETAILS NOTICE, NOT A CALL FOR COMPETITION ***** This procurement is being concluded without competition due to an absence of competition for technical reasons, only a particular supplier can supply the goods, servi…
- Published value
- £11k
- Annual run-rate
- —term under 6 months
- Term
- 15 Sept 2026 → 14 Dec 2026 · 3 months
- Reference
ocds-h6vhtk-06fabf
- Ends · in 44 days
ITEP1086 - Creative Cloud Professional for Teams 25-26 - Updated
National Highways Limited · Central government
Incumbent: Phoenix Software Ltd
Adobe Creative Cloud Professional for Teams 25-26, part of Digital Communications 2025-26
- Published value
- £10k
- Annual run-rate
- £10kpublished value ÷ term, exc. VAT
- Term
- 15 Dec 2025 → 14 Dec 2026 · 1 yr
- Reference
ocds-h6vhtk-05f52c
- Ends · in 44 days
OCE MATLAB Licences
UK Space Agency · Central government · Nationwide (UK)
Incumbent: The MathWorks Ltd.
This direct award provides for the setup of MATLAB and associated proprietary toolboxes (including Simulink, Aerospace Toolbox, and System Composer), which are developed and owned by MathWorks. The software is essential for the Office of th…
- Published value
- £10k
- Annual run-rate
- £10kpublished value ÷ term, exc. VAT
- Term
- 15 Dec 2025 → 14 Dec 2026 · 1 yr
- Reference
ocds-h6vhtk-05f0c7
- Estimated end · in 45 daysFramework record
LSSL Street Cleansing Vehicle Hire (Framework)
Liverpool Streetscene Services Limited · North West England
Incumbent: Dawsongroup Environmental Municipal Civil Limited
- Published value
- £3.4mpublished ceiling for the whole framework
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 15 Dec 2026 · start not published
- Reference
ocds-h6vhtk-036c1d
- Estimated end · in 45 daysFramework record
Land Surveying Framework 2022 - 2026
Bournemouth, Christchurch and Poole Council · Local authority · South West England
Incumbent: Premier Surveys Limited
- Published value
- £2.0mpublished ceiling for the whole framework
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 15 Dec 2026 · start not published
- Reference
ocds-h6vhtk-035172
- Estimated end · in 45 days
Siebel Developer Support
General Medical Council (GMC) · Local authority · Nationwide (UK)
Incumbent: IdeaPort Riga · Last contest: 2 bids (0 SME) · awarded 29% over the estimate
To support the GMC in achieving their strategic goals, they would like to identify a Siebel development partner who can supply Siebel development and integration expertise to work closely with their existing team in a hybrid resourcing mode…
- Published value
- £1.5m
- Annual run-rate
- —start date not published
- Term
- Estimated end 15 Dec 2026 · start not published
- Reference
ocds-h6vhtk-04087a
- Estimated end · in 45 days
Provision of an Air Conditioning Maintenance Measured Term Contract (MTC)
University of Strathclyde · Education · Scotland
Incumbent: C&M Environmental Ltd. · Last contest: 9 bids (7 SME) · awarded at the estimate
The University has awarded a Contract for the Provision of an Air Conditioning Maintenance Measured Term Contract (MTC) (UOS-7795-2021).
- Published value
- £300k
- Annual run-rate
- —start date not published
- Term
- Estimated end 15 Dec 2026 · start not published
- Reference
ocds-h6vhtk-02b07c
- Estimated end · in 45 daysCall-off
Fast Track (End of Life) - Nursing (General)
NHS Cambridgeshire and Peterborough Integrated Care Board · NHS & health · West Midlands, East of England, Northern Ireland
Incumbent: BARCHESTER HEALTHCARE HOMES LIMITED · Last contest: 11 bids (1 SME)
- Published value
- £6kvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 15 Dec 2026 · start not published
- Reference
ocds-h6vhtk-0292a9
- Estimated end · in 45 days
Without Escort
City of Doncaster Council · Local authority · Yorkshire and the Humber, West Midlands
Incumbent: Ky's Karz · Last contest: 23 bids
- Published value
- £200list or panel total repeated on every provider; not this contract's value
- Annual run-rate
- —list or panel total, not a run-rate
- Term
- Estimated end 15 Dec 2026 · start not published
- Reference
ocds-h6vhtk-035ea9
- Estimated end · in 45 days
Online Programme Management Solution
Abertay University · Education · Scotland
Incumbent: Higher Ed Partners Ltd. · Last contest: 3 bids (0 SME)
Abertay University is strategically committed to the delivery of its programmes beyond our campus, including online, and has been exploring opportunities for alternative delivery partnerships across a range of delivery models and markets. W…
- Published value
- £1
- Annual run-rate
- —start date not published
- Term
- Estimated end 15 Dec 2026 · start not published
- Reference
ocds-h6vhtk-02a8b3
- Estimated end · in 45 days
Provision of Standard and Bespoke Signage
SEVERN TRENT WATER LIMITED · Other public body · West Midlands
Incumbent: Direct Signs (UK) Limited · Last contest: 6 bids
standard and bespoke signage
- Published value
- Not published
- Annual run-rate
- —value not published
- Term
- Estimated end 15 Dec 2026 · start not published
- Reference
ocds-h6vhtk-03e3f8
- Estimated end · in 45 days
QEHKL CDC
NHS Norfolk and Waveney Integrated Care Board · NHS & health · East of England
Incumbent: The Queen Elizabeth Hospital King's Lynn NHS Foundation Trust
- Published value
- £6.2m
- Annual run-rate
- —start date not published
- Term
- Estimated end 15 Dec 2026 · start not published
- Reference
ocds-h6vhtk-05db0f
- Estimated end · in 45 days
Mental Health Crisis Breathing Space Services
MONEY AND PENSIONS SERVICE · East of England, South East England
Incumbent: We are Digital · Last contest: 3 bids (3 SME) · awarded 2% under the estimate
- Published value
- £4.3m
- Annual run-rate
- —start date not published
- Term
- Estimated end 15 Dec 2026 · start not published
- Reference
ocds-h6vhtk-0438c2
- Ends · in 45 daysFramework record
YPO 001142 - Digital Marketplace
YPO · Nationwide (UK)
Incumbent: Amazon Business EU SARL
- Published value
- £500mpublished ceiling for the whole framework
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Ends 15 Dec 2026 · start not published
- Reference
ocds-h6vhtk-037406
- Ends · in 45 days
2364 Spalding Active Travel
Lincolnshire County Council · Local authority · East Midlands
Incumbent: C R Reynolds Ltd
The project consists of improving the cycling and walking infrastructure along Pinchbeck Road between Kings Road and Enterprise Way in Spalding. The project also contains resurfacing along the full length of the works. There will be a signa…
- Published value
- £3.7minc. VAT as published
- Annual run-rate
- £7.3mpublished value ÷ term, inc. VAT
- Term
- 15 Jun 2026 → 15 Dec 2026 · 6 months
- Reference
ocds-h6vhtk-06cb89
- Ends · in 45 days
ENHT - Renal Home Therapies Refurbishment - Ventilation
East and North Hertfordshire Teaching NHS Trust · Central government
Incumbent: PARIAS CONSTRUCTIOPARIAS CONSTRUCTION & INTERIORS LIMITED
ENHT - Renal Home Therapies Refurbishment - Ventilation. procured via Tender.
- Published value
- £1.9m
- Annual run-rate
- —term under 6 months
- Term
- 16 Sept 2026 → 15 Dec 2026 · 3 months
- Reference
ocds-h6vhtk-07744c
- Ends · in 45 days
Kilburn Library Re-Imagined Main Works
London Borough of Camden · Local authority · Greater London
Incumbent: Quinn (London) Limited
Works contract to undertake a full retrofit of the building across all floors, basement, ground and mezzanine level at Kilburn Library
- Published value
- £1.4m
- Annual run-rate
- —term under 6 months
- Term
- 6 Jul 2026 → 15 Dec 2026 · 5 months
- Reference
ocds-h6vhtk-06b4f2
- Ends · in 45 days
East Locality - Berwick Hills Library - Conversion Works
Middlesbrough Council · Local authority · North East England
Incumbent: Tom Willoughby Ltd
Strip and full refurbishment of an existing unit previously used as a local library, adapting to provide new "Locality HUB for joint Council services" including all new finishes, new M & E installation and associated external works.
- Published value
- £986k
- Annual run-rate
- —term under 6 months
- Term
- 3 Aug 2026 → 15 Dec 2026 · 4 months
- Reference
ocds-h6vhtk-06eea4
- Ends · in 45 days
9002998 - Supply of Standard PEBPM Bellows Assembly
DIAMOND LIGHT SOURCE LIMITED · Central government · South East England
Incumbent: CECOM Srl
Located on the Harwell Science and Innovation Campus in Oxfordshire, Diamond Light Source (DLS) is a leading-edge facility for science, engineering and innovation. Diamond allows researchers from academia and industry to investigate the str…
- Published value
- €620,000
- Annual run-rate
- —not a GBP value
- Term
- 5 Dec 2025 → 15 Dec 2026 · 1 yr
- Reference
ocds-h6vhtk-05a9a8
- Ends · in 45 daysExtension option · up to 15 Jun 2027
TVCA-PROC-0595a - Development of South Bank Rail Station - ECI & Design
Tees Valley Combined Authority · Local authority · North East England
Incumbent: Network Rail Infrastructure
Tees Valley Combined Authority (TVCA)(the 'Contracting Authority'), part of the Tees Valley Combined Authority Group, have awarded a contract to Network Rail Infrastructure Limited for Development of South Bank Rail Station - ECI & Design. …
- Published value
- £325k
- Annual run-rate
- £327kpublished value ÷ term, exc. VAT
- Term
- 17 Dec 2025 → 15 Dec 2026 · 1 yr · up to 15 Jun 2027 with extensions
- Reference
ocds-h6vhtk-05edd9
- Ends · in 45 days
Engineering Services
BANK OF ENGLAND · Central government · Nationwide (UK)
Incumbent: OVE ARUP & PARTNERS LIMITED
Engineering Services for the Bank.
- Published value
- £136k
- Annual run-rate
- £272kpublished value ÷ term, exc. VAT
- Term
- 16 Jun 2026 → 15 Dec 2026 · 6 months
- Reference
ocds-h6vhtk-06c7a6
- Ends · in 45 days
Provison of a Micro CAT-ODO Sensors
National Oceanography Centre · Other public body · Nationwide (UK)
Incumbent: Planet Ocean Ltd
The NOC required the provision of six SBE 37-SMP-ODO MicroCAT sensors, each with titanium housing, integrated optical dissolved oxygen measurement, and optional pressure capability, for use in the Ellett Array and RAPID Array. These sensors…
- Published value
- US$127,884
- Annual run-rate
- —not a GBP value
- Term
- 26 Nov 2025 → 15 Dec 2026 · 1.1 yrs
- Reference
ocds-h6vhtk-05f62d
- Ends · in 45 days
Digital Tree Surveys
Transport for London · Other public body · Greater London
Incumbent: greeHill Deutschland GmbH
This digital survey will capture extensive data sets on each tree across the TfL Road Network and will create a digital twin. It will capture details including tree location, species, health, stem size, total height, pollution & rainwater i…
- Published value
- £99k
- Annual run-rate
- £197kpublished value ÷ term, exc. VAT
- Term
- 15 Jun 2026 → 15 Dec 2026 · 6 months
- Reference
ocds-h6vhtk-052278
- Ends · in 45 days
Defects Manager
London Borough of Enfield · Local authority · Greater London
Incumbent: Red Loft
to provide Interim Defects Coordinator/Manager services in relation to the Reardon Court development
- Published value
- £82kinc. VAT as published
- Annual run-rate
- £162kpublished value ÷ term, inc. VAT
- Term
- 15 Jun 2026 → 15 Dec 2026 · 6 months
- Reference
ocds-h6vhtk-06f46b
- Ends · in 45 days
Provision of Sim Cards and Mobile Data Services to British Embassy Beirut
Foreign, Commonwealth and Development Office · Central government
Incumbent: Mobile Interim Company 1 S.A.L. (MIC1)
This contract is for the provision of sim cards and mobile data services to British Embassy Beirut
- Published value
- £77k
- Annual run-rate
- £77kpublished value ÷ term, exc. VAT
- Term
- 16 Dec 2025 → 15 Dec 2026 · 1 yr
- Reference
ocds-h6vhtk-065ca3
When contracts end i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
38,533 contracts and agreements end within 24 months, 61,170 in total · £7.8bn published GBP values end in the next 3 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 3 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 44 divisions shown; 5,691 of 5,711 contracts ending in this window carry a sector classification.
45Construction work86679Business services: law, marketing, consulting73685Health and social work services47672IT services: consulting, software, internet40371Architectural, construction, engineering39250Repair and maintenance services27939Furniture, furnishings, domestic appliances26448Software package and information systems227
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.