Retender radar: UK public contracts ending soon

Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the next 3 months

Showing 256–270

  1. Estimated end · in 62 daysLinked to a framework or DPS

    Infrastructure Consultancy

    Scape Procure Limited (trading as SCAPE) · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England

    Incumbent: Perfect Circle JV Ltd · Last contest: 2 bids (0 SME)

    • Architectural, construction, engineering and inspection services
    Published value
    £250mvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 29 Dec 2026 · start not published
    Reference
    ocds-h6vhtk-0290e8
  2. Estimated end · in 62 daysLinked to a framework or DPSPanel · 2 suppliers

    Place Shaping

    Scape Procure Limited (trading as SCAPE) · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England

    Panel: MACE LTD, Perfect Circle JV Ltd · Last contest: 3 bids (0 SME)

    Scape Procure Limited (Scape) wishes to establish a framework agreement for a four-year duration with an option to extend for a further two years. Experienced suppliers are invited to apply for three Lots covering built environment, infrast…

    • Architectural, construction, engineering and inspection services
    Published value
    £100mvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 29 Dec 2026 · start not published
    Reference
    ocds-h6vhtk-0290e8
  3. Estimated end · in 62 daysFramework record

    Asset and Property Management Consultancy Framework

    The Guinness Partnership · Nationwide (UK)

    Incumbent: 8x8 UK Limited

    • Contact management software package
    Published value
    £8.0mpublished ceiling for the whole framework
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 29 Dec 2026 · start not published
    Reference
    ocds-h6vhtk-033529
  4. Ends · in 62 daysCall-off

    ocds-h6vhtk-037591

    SUPPLY CHAIN COORDINATION LIMITED · Nationwide (UK), Greater London

    Incumbent: MEDITRADE UK LTD · Last contest: 4 bids

    • Disposable gloves
    Published value
    £34mvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Ends 29 Dec 2026 · start not published
    Reference
    ocds-h6vhtk-037591
  5. Ends · in 62 daysCall-off

    ocds-h6vhtk-037591

    SUPPLY CHAIN COORDINATION LIMITED · Nationwide (UK), Greater London

    Incumbent: GLOBUS (SHETLAND) LIMITED · Last contest: 4 bids

    • Disposable gloves
    Published value
    £34mvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Ends 29 Dec 2026 · start not published
    Reference
    ocds-h6vhtk-037591
  6. Ends · in 62 daysCall-off

    ocds-h6vhtk-037591

    SUPPLY CHAIN COORDINATION LIMITED · Nationwide (UK), Greater London

    Incumbent: MEDIQ HEALTHCARE UK LIMITED · Last contest: 4 bids

    This Mini-comp is to set up a Framework Agreement for the Supply of Medical Examination Gloves under reference Project_1101 (the “Framework Agreement”) - OJEU reference 2023/S 000-016807 is running a Mini Competition under the Framework Agr…

    • Disposable gloves
    Published value
    £34mvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Ends 29 Dec 2026 · start not published
    Reference
    ocds-h6vhtk-037591
  7. Estimated end · in 63 daysFramework recordPanel · 4 suppliers

    Provision of General Patrol and Firearms Body Armour

    BLUELIGHT COMMERCIAL LIMITED · Nationwide (UK)

    Panel: Cooneen Protection Ltd, Mehler Vario Systems GmbH, SAFARILAND UK LTD +1 more

    • Security equipment
    Published value
    £44mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 30 Dec 2026 · start not published
    Reference
    ocds-h6vhtk-03503c
  8. Estimated end · in 63 daysFramework record

    FMPG-2024-007 Provision of Scaffolding Labour and Supervision

    Ferguson Marine (Port Glasgow) Ltd · Scotland

    Incumbent: Wescott Industrial Services

    • Scaffolding work
    Published value
    £2.0mlargest agreement; total ceiling not published
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 30 Dec 2026 · start not published
    Reference
    ocds-h6vhtk-04b0ac
  9. Estimated end · in 63 daysCall-off

    Oil Testing and Analysis

    UK POWER NETWORKS (OPERATIONS) LIMITED · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands

    Incumbent not published · Last contest: 21 bids (6 SME)

    • Environmental monitoring for construction
    Published value
    Not publishedvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 30 Dec 2026 · start not published
    Reference
    ocds-h6vhtk-02874b
  10. Ends · in 64 daysFramework recordExtension option · up to 31 Dec 2028Panel · 8 suppliers

    NHS National Framework for Denosumab Injection commencing 1st January 2026

    NHS England · Central government · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England

    Panel: ACCORD-UK LTD, Amgen Ltd, Biosimilar Collaborations Ireland Limited +5 more

    Re-procurement plannedNHS National Framework for Vedolizumab Injection · tender expected

    Published value
    £120mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    1 Jan 2026 → 31 Dec 2026 · 1 yr · up to 31 Dec 2028 with extensions
    Reference
    ocds-h6vhtk-05506a
  11. Ends · in 64 daysFramework recordPanel · 49 suppliers

    263_25 Total Cleaning Service Solutions

    ESPO · Nationwide (UK)

    Panel: ABM Facility Services UK Limited, AEFM Ltd, AGILE WITHOUT BORDERS LTD +46 more

    • Cleaning services
    Published value
    £88mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 Dec 2026 · start not published
    Reference
    ocds-h6vhtk-0495b2
  12. Ends · in 64 daysFramework recordPanel · 25 suppliers

    London Boroughs’ Legal Alliance (LBLA) Barrister Framework

    Perceval House · Nationwide (UK), East of England, Greater London, South East England

    Panel: 1 Crown Office Row, 11 KBW LIMITED, 39 Essex Chambers (Services) Ltd +22 more

    • Legal advisory and representation services
    Published value
    £72mlargest agreement; total ceiling not published
    Annual run-rate
    —panel, not one supplier
    Term
    1 Jan 2024 → 31 Dec 2026 · 3 yrs
    Reference
    ocds-h6vhtk-03cd5f
  13. Ends · in 64 daysFramework recordPanel · 6 suppliers

    263B_25 Cleaning Decontamination Systems and Services

    ESPO · Nationwide (UK)

    Panel: CK FACILITIES MANAGEMENT LTD, Ecolab Ltd, FINSEN TECHNOLOGIES LIMITED +3 more

    • Decontamination equipment
    Published value
    £20mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 Dec 2026 · start not published
    Reference
    ocds-h6vhtk-04e27a
  14. Ends · in 64 daysFramework recordPanel · 21 suppliers

    SUPPLY AND DELIVERY OF HOUSING TECHNICAL, HOUSING REPAIR OPERATIONS LOT 1 GENERAL BUILDING ONLY

    Caerphilly County Borough Council · Local authority · Wales (Cymru)

    Panel: A P WATERS BUILDING CONTRACTORS LTD, ARC CONTRACTING LTD, County Home Improvements +18 more

    • Building installation work
    Published value
    £17mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 Dec 2026 · start not published
    Reference
    ocds-h6vhtk-0449e6
  15. Ends · in 64 daysFramework recordPanel · 20 suppliers

    245_25 Grounds Maintenance Services

    ESPO · Nationwide (UK), East Midlands

    Panel: Alben Landscapes Ltd, Beacons Tree Services, COUNTRYWIDE GROUNDS MAINTENANCE LIMITED +17 more

    • Grounds maintenance services
    Published value
    £16mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 Dec 2026 · start not published
    Reference
    ocds-h6vhtk-04ac44
How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.