Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the next 3 months
Showing 16–18
- Estimated end · in 84 daysPanel · 3 suppliers
Sourcing
CENTRE FOR PROCESS INNOVATION LIMITED · Other public body · Nationwide (UK)
Panel: Fisher Scientific UK, Merck Life Science UK Limited, North England Laboratory Supplies · Last contest: 3 bids (1 SME)
To support CPI with ongoing project work and everyday operations, we are looking to appoint a framework of suppliers to source and supply lab consumables. The items have been categorised into Lots which cover a grouping of similar products.…
- Published value
- £7.5m
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 19 Jan 2027 · start not published
- Reference
ocds-h6vhtk-034cff
- Estimated end · in 84 daysPanel · 2 suppliers
Regulatory Lab Cleaning Products
CENTRE FOR PROCESS INNOVATION LIMITED · Other public body · Nationwide (UK)
Panel: Ecolab Ltd, North England Laboratory Supplies · Last contest: 2 bids (1 SME)
To support CPI with ongoing project work and everyday operations, we are looking to appoint a framework of suppliers to source and supply lab consumables. The items have been categorised into Lots which cover a grouping of similar products.…
- Published value
- £7.5m
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 19 Jan 2027 · start not published
- Reference
ocds-h6vhtk-034cff
- Estimated end · in 88 days
CRM Liquid Nitrogen Tanks
University Of Edinburgh · Education · Scotland
Incumbent: Scientific Laboratory Supplies · Last contest: 3 bids (0 SME) · awarded 43% under the estimate
The supply, installation and technical services of 3 x vapour phase nitrogen storage tanks for the Centre for Regenerative Medicine (CRM). The current facility holds 7 x Statebourne Biosystem 36,000 vial Cryogenic nitrogen storage tanks. An…
- Published value
- £85k
- Annual run-rate
- —start date not published
- Term
- Estimated end 23 Jan 2027 · start not published
- Reference
ocds-h6vhtk-02f8fb
When contracts end · Chemical products i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
98 contracts and agreements end within 24 months, 128 in total · £53m published GBP values end in the next 3 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 3 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 44 divisions shown.
45Construction work92279Business services: law, marketing, consulting73685Health and social work services47571Architectural, construction, engineering39572IT services: consulting, software, internet39150Repair and maintenance services27939Furniture, furnishings, domestic appliances26648Software package and information systems220
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.