Retender radar: UK public contracts ending soon

Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the next 3 months

Showing 391–396

  1. Estimated end · in 85 days

    Consultants - Dunanney Pavilion & 3G Pitch

    Antrim and Newtownabbey Borough Council · Local authority · Northern Ireland

    Incumbent: Rolston Architects · Last contest: 5 bids (5 SME)

    The Service is for the provision of a consultant team in conjunction with the separately appointed PM/QS to manage the delivery of the Dunanney Pavilion and 3G pitch Project. New build Pavilion and link building (circa 939m² inc. multipurpo…

    • Architectural design services
    Published value
    £244k
    Annual run-rate
    —start date not published
    Term
    Estimated end 21 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-036664
  2. Ends · in 86 days

    North Somerset Future Bus Network Study

    North Somerset Council · Local authority · South West England

    Incumbent: Jacobs UK Ltd

    Contract for consultancy services to conduct a study into the future of North Somerset's bus network, taking into account new infrastructure and changing patterns of development in the district. This will provide deliverable outputs which w…

    Published value
    £132k
    Annual run-rate
    —term under 6 months
    Term
    8 Oct 2026 → 22 Jan 2027 · 4 months
    Reference
    ocds-h6vhtk-079145
  3. Estimated end · in 87 days

    Consolidated water treatment

    BWPC · South West England

    Incumbent: Churchill Contract Services Limited · Last contest: 11 bids · awarded 29% over the estimate

    Tender for the provision of a consolidated water inspection, treatment & maintenance service, some of which may need to be conducted within short timescales. Term = 3 years, with an option to extend for +1+1 years if required/if performance…

    • Technical inspection and testing services
    Published value
    £775k
    Annual run-rate
    —start date not published
    Term
    Estimated end 23 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-02e1ad
  4. Ends · in 89 days

    CEFAS26-60 ISO 17025 Reassessment Visit Lowestoft

    Cefas · Central government · Nationwide (UK)

    Incumbent: U K ACCREDITATION SERVICE

    Reassessment visit of our ISO 17025 accreditation for the Lowestoft Laboratory in July 2026

    Published value
    £11k
    Annual run-rate
    £11kpublished value ÷ term, exc. VAT
    Term
    26 Jan 2026 → 25 Jan 2027 · 1 yr
    Reference
    ocds-h6vhtk-067690
  5. Ends · in 90 daysFramework recordPanel · 4 suppliers

    COV - Quantity Surveyor and Employers Agent Framework 2025

    Coventry City Council · Local authority · West Midlands

    Panel: Armson and Partners, CURRIE and BROWN UK LIMITED, PMP Consultants +1 more

    • Quantity surveying services
    Published value
    £2.0mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 26 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-04b39d
  6. Estimated end · in 91 daysCall-off

    Provision of Annual Flexible Hose Assemblies Surveys and Examinations

    Ministry of Defence · Central government · Nationwide (UK), South East England

    Incumbent: BAE Systems Surface Ships Ltd · Last contest: 3 bids

    This notice is for the purposes of announcing the contract award to BAE SYSTEMS SURFACE SHIPS LIMITED for The Provision of Annual Flexible Hose Assemblies Surveys and Examinations for transparency purposes. Expressions of interest are not r…

    • Technical inspection services
    Published value
    £47kvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 27 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-0371f8

When contracts end · Architectural, construction, engineering
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

2,296 contracts and agreements end within 24 months, 3,304 in total · £161m published GBP values end in the next 3 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months396
  2. 3–6 months495
  3. 6–12 months530
  4. 12–24 months875

Top sectors, next 3 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 44 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.