Retender radar: UK public contracts ending soon

Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the next 3 months

Showing 1–10

  1. Ends · in 4 days

    Solar PV: desktop review, site inspection, technical report, defects register and remedial works schedule

    KENT COMMUNITY HEALTH NHS FOUNDATION TRUST · Central government · South East England

    Incumbent: BARTON KNIGHT ENERGY LIMITED

    Solar PV: desktop review, site inspection, technical report, defects register and remedial works schedule for Victoria Hospital

    Published value
    £14k
    Annual run-rate
    —term under 6 months
    Term
    29 Jun 2026 → 31 Oct 2026 · 4 months
    Reference
    ocds-h6vhtk-077d8c
  2. Estimated end · in 18 daysFramework record

    PURCH2122 PROVISION OF FRAMEWORK AGREEMENT FOR THE PROVISION OF THE SUPPLY OF PELLETS FOR BIOMASS PLANT

    University of Glasgow · Education · Scotland

    Incumbent: Balcas

    • Wood fuels
    Published value
    £285klargest agreement; total ceiling not published
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 14 Nov 2026 · start not published
    Reference
    ocds-h6vhtk-035b7e
  3. Estimated end · in 19 days

    Supply of Woodchip Biomass Fuel for Eden Campus Energy Centre

    University of St Andrews · Education · Scotland

    Incumbent: Angus Biofuels · Last contest: 5 bids (5 SME) · awarded 51% under the estimate

    Supply of Woodchip Biomass Fuel for Eden Campus Energy Centre in Guardbridge, Fife. The Buyer is Eden Estuary Energy Centre Ltd.

    • Wood fuels
    Published value
    £2.2m
    Annual run-rate
    —start date not published
    Term
    Estimated end 15 Nov 2026 · start not published
    Reference
    ocds-h6vhtk-040287
  4. Ends · in 31 days

    HVO fuel to Bardon Waste Site Oct 2026

    Leicestershire County Council · Local authority

    Incumbent: CRAGGS ENERGY LIMITED

    To supply the Bardon fuel site with HVO until October 2026 until mid-November 2026

    Published value
    £55k
    Annual run-rate
    —term under 6 months
    Term
    23 Oct 2026 → 27 Nov 2026 · 36 days
    Reference
    ocds-h6vhtk-078f19
  5. Ends · in 34 daysExtension option · up to 31 Mar 2027

    Mine Water Heating Feasibility Study

    Carmarthenshire County Council · Local authority · Wales (Cymru)

    Incumbent: Sustainable Energy Ltd

    THIS IS NOT A TENDERING OPPORTUNITY. Carmarthenshire County Council has appointed a consultant to undertake a detailed feasibility study into the development of a district heating scheme within the County.

    Published value
    £50k
    Annual run-rate
    —term under 6 months
    Term
    27 Jul 2026 → 30 Nov 2026 · 4 months · up to 31 Mar 2027 with extensions
    Reference
    ocds-h6vhtk-06dfb9
  6. Ends · in 35 days

    Supply of Heating Oil and Related Services

    Greensquareaccord · Other public body · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England

    Incumbent: FORD FUELS LIMITED

    To supply Kerosene fuel and remotely monitor 2 communal heating systems in Oxfordshire & Wiltshire

    Published value
    £80k
    Annual run-rate
    £80kpublished value ÷ term, exc. VAT
    Term
    1 Dec 2025 → 1 Dec 2026 · 1 yr
    Reference
    ocds-h6vhtk-067b44
  7. Ends · in 36 days

    Heating Oil Supply

    University of Exeter · Education · Nationwide (UK)

    Incumbent: Heltor Ltd T/A Devon Fuels

    Heating Oil Supply 2025/26

    Published value
    £144kinc. VAT as published
    Annual run-rate
    £144kpublished value ÷ term, inc. VAT
    Term
    3 Dec 2025 → 2 Dec 2026 · 1 yr
    Reference
    ocds-h6vhtk-06757d
  8. Ends · in 38 days

    Clacton Leisure Centre Oil Boiler Replacement and Installation of New Solar PV's

    Tendring District Council · Local authority · East of England

    Incumbent: Re-Gen (M&E Services) Ltd. · Last contest: awarded 9% over the estimate

    Project Objective The project aims to replace the existing end-of-life oil boiler system at Clacton Leisure Centre with a modern, low-carbon heating solution and and Installation of New Solar PV's. This is part of Tendring District Council'…

    Published value
    £1.3m
    Annual run-rate
    £1.4mpublished value ÷ term, exc. VAT
    Term
    5 Jan 2026 → 4 Dec 2026 · 11 months
    Reference
    ocds-h6vhtk-05ab24
  9. Ends · in 41 days

    SOLAR PANEL INSTALLATION ON CIVIC CENTRE ROOF AT WYCHAVON DISTRICT COUNCIL CIVIC CENTRE QUEEN ELIZABETH DRIVE PERSHORE WR10 1PT

    Wychavon District Council · Local authority · West Midlands

    Incumbent: Dynamis Associates · Last contest: awarded 25% under the estimate

    Wychavon District Council was seeking a contractor to deliver the installation of a minimum 200 kWp solar PV system at the Civic Centre, Queen Elizabeth Drive, Pershore, WR10 1PT. The works include full design, supply, installation, commiss…

    Published value
    £187k
    Annual run-rate
    —term under 6 months
    Term
    7 Sept 2026 → 7 Dec 2026 · 3 months
    Reference
    ocds-h6vhtk-0671d0
  10. Ends · in 43 daysExtension option · up to 9 Dec 2027

    Parks and Open Spaces Fuel Requirement 2025

    Southend-on-Sea City Council · Local authority · East of England

    Incumbent: Certas Energy UK Limited

    Southend-on-Sea City Council invited tenders for the supply and delivery of fuel to various operational sites, to support its delivery of Parks and Open Spaces Services. The fuel types required include the following: - White Diesel (Also kn…

    Published value
    £70k
    Annual run-rate
    £70kpublished value ÷ term, exc. VAT
    Term
    9 Dec 2025 → 9 Dec 2026 · 1 yr · up to 9 Dec 2027 with extensions
    Reference
    ocds-h6vhtk-05f4ac

When contracts end · Petroleum, coal, oil and gas
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

150 contracts and agreements end within 24 months, 253 in total · £5.3m published GBP values end in the next 3 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months16
  2. 3–6 months28
  3. 6–12 months36
  4. 12–24 months70

Top sectors, next 3 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 44 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.