Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the next 3 months
Showing 1–5
- Ends · in 18 days
Small Sites Gas Supply
South Cambridgeshire District Council · Local authority · East of England
Incumbent: BRITISH GAS TRADING LIMITED
Gas supply at small sites across South Cambs
- Published value
- £31k
- Annual run-rate
- £31kpublished value ÷ term, exc. VAT
- Term
- 15 Nov 2025 → 14 Nov 2026 · 1 yr
- Reference
ocds-h6vhtk-05e395
- Estimated end · in 36 daysFramework record
Land Entry Framework
Southern Water Services Limited · South East England
Incumbent not published
- Published value
- Not publishedlargest agreement; total ceiling not published
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 2 Dec 2026 · start not published
- Reference
ocds-h6vhtk-034ecb
- Estimated end · in 49 days
Provision of Standard and Bespoke Signage
SEVERN TRENT WATER LIMITED · Other public body · West Midlands
Incumbent: Direct Signs (UK) Limited · Last contest: 6 bids
standard and bespoke signage
- Published value
- Not published
- Annual run-rate
- —value not published
- Term
- Estimated end 15 Dec 2026 · start not published
- Reference
ocds-h6vhtk-03e3f8
- Ends · in 65 days
UKRI-5252
UK Research and Innovation · Central government
Incumbent: UK Power Networks
BAS Cambridge requires a critical electrical infrastructure upgrade, following a technical report that assessed rising energy demands on the BAS Cambridge site. The upgrade is essential to future-proof the site. The required works are non-c…
- Published value
- £86k
- Annual run-rate
- £86kpublished value ÷ term, exc. VAT
- Term
- 1 Jan 2026 → 31 Dec 2026 · 1 yr
- Reference
ocds-h6vhtk-05a014
- Estimated end · in 83 daysFramework record
P-0127 Provision of Water Services
Manchester City Council · Local authority · North West England
Incumbent: Anglian Water Business (National) Limited (trading as Wave Utilities)
- Published value
- £5.0mpublished ceiling for the whole framework
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 18 Jan 2027 · start not published
- Reference
ocds-h6vhtk-049c77
When contracts end · Public utilities i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
59 contracts and agreements end within 24 months, 136 in total · £117k published GBP values end in the next 3 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 3 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 44 divisions shown.
45Construction work92279Business services: law, marketing, consulting73685Health and social work services47571Architectural, construction, engineering39572IT services: consulting, software, internet39150Repair and maintenance services27939Furniture, furnishings, domestic appliances26648Software package and information systems220
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.