Contracts ending in the next 3 months

Showing 1–5

  1. Ends · in 18 days

    Small Sites Gas Supply

    South Cambridgeshire District Council · Local authority · East of England

    Incumbent: BRITISH GAS TRADING LIMITED

    Gas supply at small sites across South Cambs

    Published value
    £31k
    Annual run-rate
    £31kpublished value ÷ term, exc. VAT
    Term
    15 Nov 2025 → 14 Nov 2026 · 1 yr
    Reference
    ocds-h6vhtk-05e395
  2. Estimated end · in 36 daysFramework record

    Land Entry Framework

    Southern Water Services Limited · South East England

    Incumbent not published

    • Water distribution and related services
    Published value
    Not publishedlargest agreement; total ceiling not published
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 2 Dec 2026 · start not published
    Reference
    ocds-h6vhtk-034ecb
  3. Estimated end · in 49 days

    Provision of Standard and Bespoke Signage

    SEVERN TRENT WATER LIMITED · Other public body · West Midlands

    Incumbent: Direct Signs (UK) Limited · Last contest: 6 bids

    standard and bespoke signage

    • Public utilities
    Published value
    Not published
    Annual run-rate
    —value not published
    Term
    Estimated end 15 Dec 2026 · start not published
    Reference
    ocds-h6vhtk-03e3f8
  4. Ends · in 65 days

    UKRI-5252

    UK Research and Innovation · Central government

    Incumbent: UK Power Networks

    BAS Cambridge requires a critical electrical infrastructure upgrade, following a technical report that assessed rising energy demands on the BAS Cambridge site. The upgrade is essential to future-proof the site. The required works are non-c…

    Published value
    £86k
    Annual run-rate
    £86kpublished value ÷ term, exc. VAT
    Term
    1 Jan 2026 → 31 Dec 2026 · 1 yr
    Reference
    ocds-h6vhtk-05a014
  5. Estimated end · in 83 daysFramework record

    P-0127 Provision of Water Services

    Manchester City Council · Local authority · North West England

    Incumbent: Anglian Water Business (National) Limited (trading as Wave Utilities)

    • Water distribution and related services
    Published value
    £5.0mpublished ceiling for the whole framework
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 18 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-049c77

When contracts end · Public utilities
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

59 contracts and agreements end within 24 months, 136 in total · £117k published GBP values end in the next 3 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months5
  2. 3–6 months14
  3. 6–12 months14
  4. 12–24 months26

Top sectors, next 3 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 44 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.