Retender radar: UK public contracts ending soon

Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the next 3 months

Showing 1–3

  1. Estimated end · in 29 daysFramework recordPanel · 7 suppliers

    Highways Construction Materials Framework 2022

    Dorset Council · Local authority · South West England

    Panel: Aggregate Industries UK Ltd, G Crook and Sons, Harold Doonan Building Materials Ltd +4 more

    • Granules, chippings, stone powder, pebbles, gravel, broken and crushed stone, stone mixtures, sand-gravel mixtures and other aggregates

    Re-procurement plannedFramework for the Supply of Highway Construction Materials · tender expected

    Published value
    £10mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 25 Nov 2026 · start not published
    Reference
    ocds-h6vhtk-036977
  2. Estimated end · in 71 daysFramework record

    The Supply of Metals

    LEIDOS SUPPLY, LIMITED · Nationwide (UK)

    Incumbent: Righton Blackburn Ltd

    • Steel
    Published value
    £2.0mpublished ceiling for the whole framework
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 6 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-03284c
  3. Estimated end · in 88 daysFramework record

    Household Waste Recycling Centres (HWRCs) Containers

    Staffordshire County Council · Local authority · West Midlands

    Incumbent: GJF Fabrications Ltd

    • Steel
    Published value
    £480kpublished ceiling for the whole framework
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 23 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-037785

When contracts end · Mining, basic metals and related products
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

25 contracts and agreements end within 24 months, 33 in total.

  1. Next 3 months3
  2. 3–6 months11
  3. 6–12 months2
  4. 12–24 months9

Top sectors, next 3 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 44 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.