Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the next 3 months
Showing 1–15
- Estimated end · tomorrow
Supply and Installation of Composite Fire Door Sets for Low Rise Buildings
Newport City Homes · Wales (Cymru)
Incumbent: SOLAR WINDOWS LIMITED · Last contest: 10 bids (7 SME)
Supply and Installation of Composite Fire Door Sets for Low Rise Buildings
- Published value
- £1.2m
- Annual run-rate
- —start date not published
- Term
- Estimated end 28 Oct 2026 · start not published
- Reference
ocds-h6vhtk-0485c5
- Ends · tomorrow
Lithium Battery Storage Containers
National Oceanography Centre · Other public body · South East England
Incumbent: S JONES CONTAINERS LIMITED
The National Oceanography Centre has awarded a contract to S Jones Containers Ltd for the supply and installation of custom-designed lithium-ion battery storage containers. The contract includes the design, manufacture, delivery, installati…
- Published value
- £160kinc. VAT as published
- Annual run-rate
- —term under 6 months
- Term
- 28 Jul 2026 → 28 Oct 2026 · 3 months
- Reference
ocds-h6vhtk-06d526
- Ends · in 3 days
Supply of 20' ISO Containers
Nuclear Restoration Services Limited · Other public body
Incumbent: Charles Angus Engineers
Supply of 6x 20' ISO Containers with Front and Side Opening Doors.
- Published value
- £37k
- Annual run-rate
- —term under 6 months
- Term
- 16 Sept 2026 → 30 Oct 2026 · 1 month
- Reference
ocds-h6vhtk-0782b3
- Ends · in 3 days
CSP26255
UK Research and Innovation · Central government · Nationwide (UK)
Incumbent: Westermans International Ltd
***** THIS IS A CONTRACT DETAILS NOTICE, NOT A CALL FOR COMPETITION ***** This procurement is being concluded following a limited competition procurement exercise. Contract details notice for the supply of Machine welder to UKRI
- Published value
- £28k
- Annual run-rate
- £42kpublished value ÷ term, exc. VAT
- Term
- 3 Mar 2026 → 30 Oct 2026 · 8 months
- Reference
ocds-h6vhtk-066299
- Estimated end · in 4 days
C280 (2018) Supply of LV and HV Resins and Compounds
Northern Ireland Electricity Networks Limited · Northern Ireland
Incumbent: Prysmian Cables & Systems Ltd
- Published value
- £3.5m
- Annual run-rate
- —start date not published
- Term
- Estimated end 31 Oct 2026 · start not published
- Reference
ocds-h6vhtk-05a20f
- Ends · in 4 daysFramework record
Supply of Internal Doors 2023 - 2026
Sandwell Metropolitan Borough Council · Local authority · West Midlands
Incumbent: Joinery Stockists Limited
- Published value
- £450kpublished ceiling for the whole framework
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Ends 31 Oct 2026 · start not published
- Reference
ocds-h6vhtk-03f919
- Ends · in 4 days
Lakeside - supply of materials for rooftop
Portsmouth City Council · Local authority · South East England
Incumbent: RYNO LTD
Replacement of rooftop walkways and hand rail systems building 2000 final exit escape, Lakeside North Harbour, Portsmouth, Hampshire, PO6 3EN
- Published value
- £139kinc. VAT as published
- Annual run-rate
- —term under 6 months
- Term
- 6 Jul 2026 → 31 Oct 2026 · 4 months
- Reference
ocds-h6vhtk-06f08f
- Estimated end · in 7 daysFramework recordPanel · 8 suppliers
Framework Agreement For The Supply & Delivery of Door Furniture
Legal, Democratic and Business Intelligence, Swansea Council, · Local authority · Wales (Cymru)
Panel: Grafton Merchanting GB Ltd, Jewson Ltd, LBS Builders Merchants Group +5 more
This framework aims to facilitate the procurement of high-quality door furniture to support the maintenance and enhancement of Swansea Council's infrastructure, ensuring safety, security, and aesthetic value across its properties. The frame…
- Published value
- £0published ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 3 Nov 2026 · start not published
- Reference
ocds-h6vhtk-046f3e
- Ends · in 8 days
Our Cultural Heart Programme: Supply and Install of Wayfinding Signs
Kirklees Council · Local authority · Yorkshire and the Humber
Incumbent: ETESIAN TECHNOLOGIES LIMITED
The purpose of the procurement was to appoint a suitable supplier that can manufacture, supply and fit twelve (12) wayfinding signs that will vary in material and illumination (using LEDs with a minimum rating of IP65). The signs that will …
- Published value
- £91k
- Annual run-rate
- —term under 6 months
- Term
- 4 Aug 2026 → 4 Nov 2026 · 3 months
- Reference
ocds-h6vhtk-06e5c7
- Estimated end · in 12 days
9000890 - Supply of Diamond-II Group D Girder Vacuum Vessels
DIAMOND LIGHT SOURCE LIMITED · South East England
Incumbent: SAEA Rial Vacuum S.r.l. · Last contest: 3 bids (2 SME)
Located on the Harwell Science and Innovation Campus in Oxfordshire, Diamond Light Source (DLS) is a leading-edge facility for science, engineering and innovation. Diamond allows researchers from academia and industry to investigate the str…
- Published value
- €1,728,830
- Annual run-rate
- —not a GBP value
- Term
- Estimated end 8 Nov 2026 · start not published
- Reference
ocds-h6vhtk-047e5a
- Ends · in 17 days
CSP26799 - Shelter Replacement Equipment
UK Research and Innovation · Central government · Nationwide (UK)
Incumbent: Weatherhaven Global Solutions Ltd
***** THIS IS A CONTRACT DETAILS NOTICE, NOT A CALL FOR COMPETITION ***** This procurement is being concluded without competition due to an absence of competition for technical reasons, only a particular supplier can supply the goods requir…
- Published value
- £22k
- Annual run-rate
- —term under 6 months
- Term
- 25 Aug 2026 → 13 Nov 2026 · 3 months
- Reference
ocds-h6vhtk-06ec71
- Ends · in 24 days
Removal and Replacement of the Roof at the Firearms Range
The Police, Fire and Crime Commissioner for Northamptonshire · Police & fire · East Midlands
Incumbent: Higham Roofing and Construction
Removal & Replacement of The Roof at The Firearms Range (including preliminary works of the demolition of the modular buildings present on site) with Supplier Higham Flat Roofing Ltd. t/a Higham Roofing & Construction. This is a direct awar…
- Published value
- £330k
- Annual run-rate
- £330kpublished value ÷ term, exc. VAT
- Term
- 21 Nov 2025 → 20 Nov 2026 · 1 yr
- Reference
ocds-h6vhtk-064911
- Estimated end · in 26 daysFramework recordPanel · 19 suppliers
Supply of Fire Safety Products and Associated Services - Y23025
Kent County Council · Local authority · Nationwide (UK)
Panel: Allsaved Ltd, Amalgamated Ltd, AmalgamatedLtd +16 more
- Published value
- £10mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 22 Nov 2026 · start not published
- Reference
ocds-h6vhtk-036581
- Estimated end · in 27 daysFramework recordPanel · 3 suppliers
Site Accommodation and Storage Containers 23 - 27
North Tyneside Council · Local authority · North East England
Panel: John Nixon Ltd, Sunbelt Rentals Ltd, Wernick Hire
- Published value
- £1.0mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 23 Nov 2026 · start not published
- Reference
ocds-h6vhtk-03620b
- Ends · in 30 daysFramework record
901_24 Supply of Binder, Storage Tanks and Spray Tankers
ESPO on behalf of Leicestershire County Council · Local authority · East Midlands
Incumbent: Bituchem Building Products Ltd
- Published value
- £6.0mpublished ceiling for the whole framework
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Ends 26 Nov 2026 · start not published
- Reference
ocds-h6vhtk-04860d
When contracts end · Construction structures and materials i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
340 contracts and agreements end within 24 months, 506 in total · £23m published GBP values end in the next 3 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 3 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 44 divisions shown.
45Construction work92279Business services: law, marketing, consulting73685Health and social work services47571Architectural, construction, engineering39572IT services: consulting, software, internet39150Repair and maintenance services27939Furniture, furnishings, domestic appliances26648Software package and information systems220
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.