Retender radar: UK public contracts ending soon

Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts matching “highways maintenance”

Showing 31–36

  1. Ends · in 154 days

    Provision of Highways and Lighting Term Contract in the London Borough of Waltham Forest

    London Borough of Waltham Forest · Local authority · Greater London

    Incumbent: JB Riney & Co Ltd · Last contest: 3 bids

    Highways and Lighting Term Contract in the London Borough of Waltham Forest…

    • Construction, foundation and surface works for highways, roads

    Re-procurement plannedHighways and Lighting Term Contract (extension to pre-existing term contract) · tender expected

    Published value
    Not published
    Annual run-rate
    —value not published
    Term
    Ends 31 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-028767
  2. Ends · in 154 daysCall-off

    Buckinghamshire Highways Framework Two – Highways Major Works

    Buckinghamshire Council · Local authority · South East England

    Incumbent: Balfour Beatty Living Places Limited · Last contest: 4 bids (0 SME)

    March 2023. The new service delivery model includes a Term Maintenance Contract, a Tern Consultancy Contract, and two separate multi-supplier frameworks: Buckinghamshire Highways Framework One - Minor Works; and Buckinghamshire Highways Framework Two - Major Works This…

    • Construction, foundation and surface works for highways, roads
    Published value
    Not publishedvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Ends 31 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-034280
  3. Ends · in 154 daysCall-off

    Buckinghamshire Highways Framework Two – Highways Major Works

    Buckinghamshire Council · Local authority · South East England

    Incumbent: Tilbury Douglas Construction Limited · Last contest: 4 bids (0 SME)

    March 2023. The new service delivery model includes a Term Maintenance Contract, a Tern Consultancy Contract, and two separate multi-supplier frameworks: Buckinghamshire Highways Framework One - Minor Works; and Buckinghamshire Highways Framework Two - Major Works This…

    • Construction, foundation and surface works for highways, roads
    Published value
    Not publishedvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Ends 31 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-034280
  4. Ends · in 154 daysCall-off

    Buckinghamshire Highways Framework Two – Highways Major Works

    Buckinghamshire Council · Local authority · South East England

    Incumbent: Keltbray Highways Limited · Last contest: 4 bids (0 SME)

    March 2023. The new service delivery model includes a Term Maintenance Contract, a Tern Consultancy Contract, and two separate multi-supplier frameworks: Buckinghamshire Highways Framework One - Minor Works; and Buckinghamshire Highways Framework Two - Major Works This…

    • Construction, foundation and surface works for highways, roads
    Published value
    Not publishedvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Ends 31 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-034280
  5. Ends · in 155 daysExtension option · up to 1 Apr 2031

    Surface Treatment Term Maintenance Contract

    Warrington Borough Council · Local authority · North West England

    Incumbent: Road Maintenance Services Limited

    year extensions by mutual agreement. Contractor's Core Maintenance Activities It is envisaged that the following highway maintenance services will be required on an annual basis: • Cold Applied Ultra-Thin Surfacing Utilising surface dressing techniques less…

    Published value
    £1.1m
    Annual run-rate
    £1.1mpublished value ÷ term, exc. VAT
    Term
    1 Apr 2026 → 1 Apr 2027 · 1 yr · up to 1 Apr 2031 with extensions
    Reference
    ocds-h6vhtk-069c4f
  6. Estimated end · in 164 days

    GMCA 577 Mini Comp under RISE for Measured Term Contractor

    Greater Manchester Combined Authority · Local authority · Nationwide (UK), North West England, Yorkshire and the Humber, Wales (Cymru)

    Incumbent: Krol Corlett Construction Limited · Last contest: 108 bids (100 SME)

    Fire stations refurb within Greater Manchester area…

    • Construction work
    Published value
    Not published
    Annual run-rate
    —value not published
    Term
    Estimated end 10 Apr 2027 · start not published
    Reference
    ocds-h6vhtk-02f658
How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.