Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the next 6 months
Showing 781–795
- Ends · in 154 days
Clerk of Works Wolverton and Snelshall HWRC’s
Milton Keynes Council · Local authority · South East England
Incumbent: SILVER DCC LIMITED · Last contest: awarded 57% under the estimate
Milton Keynes City Council are currently out to tender for the provision of Clerk of Works to deliver two construction projects to create Reuse and Recycling Centres. Suppliers that would like to take part in this tender process are invited…
- Published value
- £26k
- Annual run-rate
- £26kpublished value ÷ term, exc. VAT
- Term
- 8 Apr 2026 → 31 Mar 2027 · 1 yr
- Reference
ocds-h6vhtk-06101a
- Ends · in 154 days
Pathology X-Lab Digital Platform
Mersey and West Lancashire Teaching Hospital NHS Trust · Central government · North West England
Incumbent: X-Lab Limited
X-Lab provides a secure digital platform enabling electronic exchange of test requests and results between NHS Trusts. This contract covers the service and maintenance of the platform for a 12-month period (01/04/2026-31/03/2027).
- Published value
- £25k
- Annual run-rate
- £25kpublished value ÷ term, exc. VAT
- Term
- 1 Apr 2026 → 31 Mar 2027 · 1 yr
- Reference
ocds-h6vhtk-067b85
- Ends · in 154 days
CSP26782 - Engineering Services
UK Research and Innovation · Central government · Nationwide (UK)
Incumbent: Hoare Lea LLP
***** THIS IS A CONTRACT DETAILS NOTICE, NOT A CALL FOR COMPETITION ***** This procurement is being concluded without competition due to an absence of competition for technical reasons, only a particular supplier can supply the services req…
- Published value
- £25k
- Annual run-rate
- £40kpublished value ÷ term, exc. VAT
- Term
- 19 Aug 2026 → 31 Mar 2027 · 7 months
- Reference
ocds-h6vhtk-06e720
- Ends · in 154 days
6.302 Chappell Drive Bridge
City of Doncaster Council · Local authority
Incumbent: CRL SURVEYS LIMITED
Provision of a detailed Principal Inspection of the bridge structure.
- Published value
- £24k
- Annual run-rate
- £31kpublished value ÷ term, exc. VAT
- Term
- 19 Jun 2026 → 31 Mar 2027 · 9 months
- Reference
ocds-h6vhtk-06c59f
- Ends · in 154 days
Trawsfynydd Footbridge Demolition Consultancy
Nuclear Restoration Services Limited · Other public body
Incumbent: RVA Engineering Solutions Limited
Trawsfynydd Footbridge Demolition Consultancy Support
- Published value
- £24k
- Annual run-rate
- —term under 6 months
- Term
- 19 Oct 2026 → 31 Mar 2027 · 5 months
- Reference
ocds-h6vhtk-078a82
- Ends · in 154 days
Analysis of Water Samples
Mersey and West Lancashire Teaching Hospital NHS Trust · Central government
Incumbent: PRECISION ANALYSIS (NORTH WEST) LIMITED
Analysis of water samples to include supply of sample containers and collection of samples from 01/04/26 - 31/03/27.
- Published value
- £23k
- Annual run-rate
- £24kpublished value ÷ term, exc. VAT
- Term
- 17 Apr 2026 → 31 Mar 2027 · 11 months
- Reference
ocds-h6vhtk-068b6d
- Ends · in 154 days
Engineer Services for Lifts
Mid Cheshire Hospitals NHS Foundation Trust · Central government · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: Vertica Consulting
Engineer Services for Lifts - New Leighton Hospital - Authorised Engineers
- Published value
- £22k
- Annual run-rate
- £18kpublished value ÷ term, exc. VAT
- Term
- 1 Jan 2026 → 31 Mar 2027 · 1.3 yrs
- Reference
ocds-h6vhtk-050f8a
- Ends · in 154 days
3.247 Pastures Canal Bridge
City of Doncaster Council · Local authority
Incumbent: CRL SURVEYS LIMITED
Provision of a detailed Principal Inspection of the bridge structure
- Published value
- £22k
- Annual run-rate
- £28kpublished value ÷ term, exc. VAT
- Term
- 19 Jun 2026 → 31 Mar 2027 · 9 months
- Reference
ocds-h6vhtk-06c5a1
- Ends · in 154 days
UKCEH Flood Outlook for FFC 2026/27
Met Office · Central government · South West England
Incumbent: UK CENTRE FOR ECOLOGY & HYDROLOGY
Delivery of river flow forecasts to support flood forecast centre flood outlook. Oct 2026 - Mar 2027
- Published value
- £22k
- Annual run-rate
- —not computed
- Term
- 8 Oct 2026 → 31 Mar 2027 · 6 months
- Reference
ocds-h6vhtk-07841c
- Ends · in 154 daysExtension option · up to 30 Mar 2028
RBGKEW1460 Wakehurst Ecosystem Observatory Met Grade Weather Station
Royal Botanic Gardens, Kew · Central government · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: Campbell Scientific Limited
Wakehurst Ecosystem Observatory is Kew Wakehurst's Living Laboratory. Currently the facility consists of a network of 23 plots within the Wakehurst 210 ha site in West Sussex. An aim of WEO is to provide a baseline of long-term climate data…
- Published value
- £21k
- Annual run-rate
- £21kpublished value ÷ term, exc. VAT
- Term
- 31 Mar 2026 → 31 Mar 2027 · 1 yr · up to 30 Mar 2028 with extensions
- Reference
ocds-h6vhtk-05dae1
- Ends · in 154 days
Architect Professional Fees
Wilton Park · Central government
Incumbent: PENWARDEN HALE LTD
Professional fee - Accessible bedrooms - construction phase
- Published value
- £21k
- Annual run-rate
- £24kpublished value ÷ term, exc. VAT
- Term
- 14 May 2026 → 31 Mar 2027 · 11 months
- Reference
ocds-h6vhtk-06cd16
- Ends · in 154 days
Principle bridge inspection STR_6975 Ratcliffe on Soar
National Highways Limited · Central government
Incumbent: Network Rail Infrastructure
Provision of an independent Principal Inspection and condition assessment of the A453 bridge over Network Rail land, including reporting and maintenance recommendations.
- Published value
- £21k
- Annual run-rate
- —not computed
- Term
- 6 Oct 2026 → 31 Mar 2027 · 6 months
- Reference
ocds-h6vhtk-0781b4
- Ends · in 154 days
Porlock Ridge and Saltmarsh SSSI - Geomorphological and ecological survey
NATURAL ENGLAND (Defra Network eTendering Portal) · Central government · South West England
Incumbent: Jeremy Benn Associates Ltd · Last contest: awarded 21% over the estimate
Geomorphological and ecological assessment of Porlock Ridge and Saltmarsh SSSI.
- Published value
- £20k
- Annual run-rate
- £38kpublished value ÷ term, exc. VAT
- Term
- 17 Sept 2026 → 31 Mar 2027 · 6 months
- Reference
ocds-h6vhtk-06ed3e
- Ends · in 154 days
UK7 - Contract Details Notice
National Highways Limited · Central government
Incumbent: Manufacturing Technology Centre
A 1-year subscription is required for Manufacturing Technology Centre Annual membership The projects delivered via the MTC (Manufacturing Technology Centre) membership constitute an integrated plan for addressing both short and long-term ch…
- Published value
- £20k
- Annual run-rate
- —not computed
- Term
- 6 Oct 2026 → 31 Mar 2027 · 6 months
- Reference
ocds-h6vhtk-078276
- Ends · in 154 days
Portable Appliance & Microwave Emissions Testing
Mersey and West Lancashire Teaching Hospital NHS Trust · Central government
Incumbent: D.E.S Facilities Management Group
To attend various sites and carry out PAT testing and microwave emissions tests.
- Published value
- £18k
- Annual run-rate
- £18kpublished value ÷ term, exc. VAT
- Term
- 1 Apr 2026 → 31 Mar 2027 · 1 yr
- Reference
ocds-h6vhtk-0673c2
When contracts end · Architectural, construction, engineering i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
2,296 contracts and agreements end within 24 months, 3,304 in total · £491m published GBP values end in the next 6 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 6 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services2,00379Business services: law, marketing, consulting1,65945Construction work1,50772IT services: consulting, software, internet93771Architectural, construction, engineering89150Repair and maintenance services83480Education and training services64648Software package and information systems565
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.