Retender radar: UK public contracts ending soon

Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the next 6 months

Showing 841–855

  1. Ends · in 160 daysExtension option · up to 6 Apr 2029Panel · 15 suppliers

    TfWM Design Excellence Panel

    West Midlands Combined Authority · Local authority · West Midlands

    Panel: Amey OW Limited, Atkins Limited, Colas Rail Limited +12 more

    Transport for West Midlands (TfWM), is committed to delivering high-quality, inclusive, and sustainable transport infrastructure that aligns with the region’s strategic objectives. Recognising the critical role of design in shaping user exp…

    Published value
    £205kinc. VAT as published
    Annual run-rate
    —panel, not one supplier
    Term
    7 Apr 2026 → 6 Apr 2027 · 1 yr · up to 6 Apr 2029 with extensions
    Reference
    ocds-h6vhtk-055b19
  2. Ends · in 160 daysPanel · 2 suppliers

    Surveyors and Valuers

    Greensquareaccord · Other public body · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England

    Panel: COMPLETE INSPECTION SERVICES LIMITED, Complete Inspection Surveyors LTD

    To provide RICS valuations for properties.

    Published value
    £36k
    Annual run-rate
    —panel, not one supplier
    Term
    6 Apr 2026 → 6 Apr 2027 · 1 yr
    Reference
    ocds-h6vhtk-06752a
  3. Estimated end · in 161 days

    North Quay Master Developer

    Great Yarmouth Borough Council · Local authority · East of England

    Incumbent: Willmott Dixon Construction Limited · Last contest: 3 bids (0 SME) · awarded at the estimate

    Great Yarmouth Borough Council (The Contracting Authority) intends to procure a master developer to design a scheme for the mixed-use regeneration of the North Quay Riverside area of Great Yarmouth. The Contracting Authority intends to co…

    • Architectural, construction, engineering and inspection services
    Published value
    £1.5m
    Annual run-rate
    —start date not published
    Term
    Estimated end 7 Apr 2027 · start not published
    Reference
    ocds-h6vhtk-03f801
  4. Estimated end · in 161 days

    WEST SMITHFIELD - EXHIBITION PROJECT MANAGEMENT SERVICES (INCLUDING CONTRACT ADMINISTRATION AND PACKAGE MANAGEMENT)

    Museum of London · Greater London

    Incumbent: Fraser Randall Limited · Last contest: 4 bids (4 SME) · awarded at the estimate

    The appointment of a Project Manager (including Contract Administrator and Specialist Works Package Manager) to manage the design and fitting-out of exhibition areas at the Museum of London's proposed new home at West Smithfield.

    • Construction project management services
    Published value
    £1.4m
    Annual run-rate
    —start date not published
    Term
    Estimated end 7 Apr 2027 · start not published
    Reference
    ocds-h6vhtk-0301a9
  5. Estimated end · in 161 daysCall-off

    Next 7 Profiled Networks

    NORTHERN GAS NETWORKS LIMITED · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands

    Incumbent not published · Last contest: 21 bids (6 SME)

    • Environmental monitoring for construction
    Published value
    Not publishedvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 7 Apr 2027 · start not published
    Reference
    ocds-h6vhtk-02874b
  6. Ends · in 161 days

    Project 1854 New HMO Archer Avenue

    Southend-on-Sea City Council · Local authority · East of England

    Incumbent: VARSITY CONSULTING LTD

    Prj 1854 New HMO Archer Avenue New build HMO

    Published value
    £12k
    Annual run-rate
    £8kpublished value ÷ term, exc. VAT
    Term
    20 Oct 2025 → 7 Apr 2027 · 1.5 yrs
    Reference
    ocds-h6vhtk-05e35f
  7. Estimated end · in 163 days

    Horizons Gallery ​Lead Designer, Architect, Exhibition Designer​

    Science Museum Group · Greater London

    Incumbent: Wright & Wright Architects LLP · Last contest: 5 bids (5 SME) · awarded 5% under the estimate

    The Authority wishes to establish an Agreement for the provision of Lead Designer, Architect, Exhibition Designer services for the Horizons Gallery Project.

    • Architectural and related services
    Published value
    £260k
    Annual run-rate
    —start date not published
    Term
    Estimated end 9 Apr 2027 · start not published
    Reference
    ocds-h6vhtk-040e34
  8. Estimated end · in 163 days

    Stock Conditioning Surveys undertaken at the 3 Great Thornton Street blocks on Anlaby Road in Hull, Direct award Lot 7

    Kingston Upon Hull City Council · Local authority · Nationwide (UK), Yorkshire and the Humber

    Incumbent: RIDGE AND PARTNERS LLP · Last contest: 18 bids (1 SME)

    • Bridge-inspection services
    Published value
    £195k
    Annual run-rate
    —start date not published
    Term
    Estimated end 9 Apr 2027 · start not published
    Reference
    ocds-h6vhtk-02e22f
  9. Ends · in 163 days

    Professional Consultants for a Feasibility Study (RIBA 0-1) of a New Leisure Centre for Skelmersdale

    West Lancashire Borough Council · Local authority · North West England

    Incumbent: RAPT Leisure Developments Limited

    West Lancashire Borough Council (WLBC) is seeking to appoint a consultant team to deliver a multi-disciplinary feasibility study and comparative site appraisal for new leisure provision in Skelmersdale. This commission will focus on produci…

    Published value
    £50k
    Annual run-rate
    £52kpublished value ÷ term, exc. VAT
    Term
    21 Apr 2026 → 9 Apr 2027 · 1 yr
    Reference
    ocds-h6vhtk-068fc5
  10. Estimated end · in 164 days

    Homes England - FRAEW Financial Hardship Cases and FRAEW Audit

    Homes England (the name adopted by the Homes and Communities Agency) · Other public body · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands

    Incumbent: Bailey Partnership · Last contest: 6 bids

    The scope of services is split into two sections. Lot 1 outlines the scope of work required of the FRAEW Hardship Cases Supplier(s) and Lot 2 outlines the scope of work required of the FRAEW Audit Supplier(s). There will be sperate contract…

    • Architectural, construction, engineering and inspection services
    Published value
    £1list or panel total repeated on every provider; not this contract's value
    Annual run-rate
    —list or panel total, not a run-rate
    Term
    Estimated end 10 Apr 2027 · start not published
    Reference
    ocds-h6vhtk-03a34c
  11. Estimated end · in 164 days

    Homes England - FRAEW Financial Hardship Cases and FRAEW Audit

    Homes England (the name adopted by the Homes and Communities Agency) · Other public body · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands

    Incumbent: Keegans Ltd · Last contest: 6 bids (6 SME)

    The scope of services is split into two sections. Lot 1 outlines the scope of work required of the FRAEW Hardship Cases Supplier(s) and Lot 2 outlines the scope of work required of the FRAEW Audit Supplier(s). There will be sperate contract…

    • Architectural, construction, engineering and inspection services
    Published value
    £1list or panel total repeated on every provider; not this contract's value
    Annual run-rate
    —list or panel total, not a run-rate
    Term
    Estimated end 10 Apr 2027 · start not published
    Reference
    ocds-h6vhtk-03a34c
  12. Estimated end · in 164 days

    Homes England - FRAEW Financial Hardship Cases and FRAEW Audit

    Homes England (the name adopted by the Homes and Communities Agency) · Other public body · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands

    Incumbent: PRP ARCHITECTURE LLP · Last contest: 6 bids (6 SME)

    The scope of services is split into two sections. Lot 1 outlines the scope of work required of the FRAEW Hardship Cases Supplier(s) and Lot 2 outlines the scope of work required of the FRAEW Audit Supplier(s). There will be sperate contract…

    • Architectural, construction, engineering and inspection services
    Published value
    £1list or panel total repeated on every provider; not this contract's value
    Annual run-rate
    —list or panel total, not a run-rate
    Term
    Estimated end 10 Apr 2027 · start not published
    Reference
    ocds-h6vhtk-03a34c
  13. Ends · in 167 days

    Environmental, Health & Safety Consultancy

    Cell & Gene Therapy Catapult · Other public body

    Incumbent: S.H.E Advises

    Direct Award to S.H.E. Advises due to an urgent and business critical need for immediate Health & Safety support. Contract term 13-Apr-2026 to 13-Apr-27 at £98,370.00 (including VAT).

    Published value
    £82k
    Annual run-rate
    £82kpublished value ÷ term, exc. VAT
    Term
    13 Apr 2026 → 13 Apr 2027 · 1 yr
    Reference
    ocds-h6vhtk-06a757
  14. Estimated end · in 168 days

    Arnish multi disciplinary Design Team

    Highlands and Islands Enterprise · Scotland

    Incumbent: ANDERSON BELL CHRISTIE LIMITED · Last contest: 18 bids (12 SME)

    • Civil engineering consultancy services
    Published value
    £642k
    Annual run-rate
    —start date not published
    Term
    Estimated end 14 Apr 2027 · start not published
    Reference
    ocds-h6vhtk-0553b1
  15. Estimated end · in 168 daysCall-off

    Dial Before You Dig

    SSE SERVICES PLC · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands

    Incumbent not published · Last contest: 21 bids (6 SME)

    • Environmental monitoring for construction
    Published value
    Not publishedvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 14 Apr 2027 · start not published
    Reference
    ocds-h6vhtk-02874b

When contracts end · Architectural, construction, engineering
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

2,296 contracts and agreements end within 24 months, 3,304 in total · £491m published GBP values end in the next 6 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months396
  2. 3–6 months495
  3. 6–12 months530
  4. 12–24 months875

Top sectors, next 6 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.