Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the next 6 months
Showing 841–855
- Ends · in 160 daysExtension option · up to 6 Apr 2029Panel · 15 suppliers
TfWM Design Excellence Panel
West Midlands Combined Authority · Local authority · West Midlands
Panel: Amey OW Limited, Atkins Limited, Colas Rail Limited +12 more
Transport for West Midlands (TfWM), is committed to delivering high-quality, inclusive, and sustainable transport infrastructure that aligns with the region’s strategic objectives. Recognising the critical role of design in shaping user exp…
- Published value
- £205kinc. VAT as published
- Annual run-rate
- —panel, not one supplier
- Term
- 7 Apr 2026 → 6 Apr 2027 · 1 yr · up to 6 Apr 2029 with extensions
- Reference
ocds-h6vhtk-055b19
- Ends · in 160 daysPanel · 2 suppliers
Surveyors and Valuers
Greensquareaccord · Other public body · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Panel: COMPLETE INSPECTION SERVICES LIMITED, Complete Inspection Surveyors LTD
To provide RICS valuations for properties.
- Published value
- £36k
- Annual run-rate
- —panel, not one supplier
- Term
- 6 Apr 2026 → 6 Apr 2027 · 1 yr
- Reference
ocds-h6vhtk-06752a
- Estimated end · in 161 days
North Quay Master Developer
Great Yarmouth Borough Council · Local authority · East of England
Incumbent: Willmott Dixon Construction Limited · Last contest: 3 bids (0 SME) · awarded at the estimate
Great Yarmouth Borough Council (The Contracting Authority) intends to procure a master developer to design a scheme for the mixed-use regeneration of the North Quay Riverside area of Great Yarmouth. The Contracting Authority intends to co…
- Published value
- £1.5m
- Annual run-rate
- —start date not published
- Term
- Estimated end 7 Apr 2027 · start not published
- Reference
ocds-h6vhtk-03f801
- Estimated end · in 161 days
WEST SMITHFIELD - EXHIBITION PROJECT MANAGEMENT SERVICES (INCLUDING CONTRACT ADMINISTRATION AND PACKAGE MANAGEMENT)
Museum of London · Greater London
Incumbent: Fraser Randall Limited · Last contest: 4 bids (4 SME) · awarded at the estimate
The appointment of a Project Manager (including Contract Administrator and Specialist Works Package Manager) to manage the design and fitting-out of exhibition areas at the Museum of London's proposed new home at West Smithfield.
- Published value
- £1.4m
- Annual run-rate
- —start date not published
- Term
- Estimated end 7 Apr 2027 · start not published
- Reference
ocds-h6vhtk-0301a9
- Estimated end · in 161 daysCall-off
Next 7 Profiled Networks
NORTHERN GAS NETWORKS LIMITED · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Incumbent not published · Last contest: 21 bids (6 SME)
- Published value
- Not publishedvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 7 Apr 2027 · start not published
- Reference
ocds-h6vhtk-02874b
- Ends · in 161 days
Project 1854 New HMO Archer Avenue
Southend-on-Sea City Council · Local authority · East of England
Incumbent: VARSITY CONSULTING LTD
Prj 1854 New HMO Archer Avenue New build HMO
- Published value
- £12k
- Annual run-rate
- £8kpublished value ÷ term, exc. VAT
- Term
- 20 Oct 2025 → 7 Apr 2027 · 1.5 yrs
- Reference
ocds-h6vhtk-05e35f
- Estimated end · in 163 days
Horizons Gallery Lead Designer, Architect, Exhibition Designer
Science Museum Group · Greater London
Incumbent: Wright & Wright Architects LLP · Last contest: 5 bids (5 SME) · awarded 5% under the estimate
The Authority wishes to establish an Agreement for the provision of Lead Designer, Architect, Exhibition Designer services for the Horizons Gallery Project.
- Published value
- £260k
- Annual run-rate
- —start date not published
- Term
- Estimated end 9 Apr 2027 · start not published
- Reference
ocds-h6vhtk-040e34
- Estimated end · in 163 days
Stock Conditioning Surveys undertaken at the 3 Great Thornton Street blocks on Anlaby Road in Hull, Direct award Lot 7
Kingston Upon Hull City Council · Local authority · Nationwide (UK), Yorkshire and the Humber
Incumbent: RIDGE AND PARTNERS LLP · Last contest: 18 bids (1 SME)
- Published value
- £195k
- Annual run-rate
- —start date not published
- Term
- Estimated end 9 Apr 2027 · start not published
- Reference
ocds-h6vhtk-02e22f
- Ends · in 163 days
Professional Consultants for a Feasibility Study (RIBA 0-1) of a New Leisure Centre for Skelmersdale
West Lancashire Borough Council · Local authority · North West England
Incumbent: RAPT Leisure Developments Limited
West Lancashire Borough Council (WLBC) is seeking to appoint a consultant team to deliver a multi-disciplinary feasibility study and comparative site appraisal for new leisure provision in Skelmersdale. This commission will focus on produci…
- Published value
- £50k
- Annual run-rate
- £52kpublished value ÷ term, exc. VAT
- Term
- 21 Apr 2026 → 9 Apr 2027 · 1 yr
- Reference
ocds-h6vhtk-068fc5
- Estimated end · in 164 days
Homes England - FRAEW Financial Hardship Cases and FRAEW Audit
Homes England (the name adopted by the Homes and Communities Agency) · Other public body · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Incumbent: Bailey Partnership · Last contest: 6 bids
The scope of services is split into two sections. Lot 1 outlines the scope of work required of the FRAEW Hardship Cases Supplier(s) and Lot 2 outlines the scope of work required of the FRAEW Audit Supplier(s). There will be sperate contract…
- Published value
- £1list or panel total repeated on every provider; not this contract's value
- Annual run-rate
- —list or panel total, not a run-rate
- Term
- Estimated end 10 Apr 2027 · start not published
- Reference
ocds-h6vhtk-03a34c
- Estimated end · in 164 days
Homes England - FRAEW Financial Hardship Cases and FRAEW Audit
Homes England (the name adopted by the Homes and Communities Agency) · Other public body · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Incumbent: Keegans Ltd · Last contest: 6 bids (6 SME)
The scope of services is split into two sections. Lot 1 outlines the scope of work required of the FRAEW Hardship Cases Supplier(s) and Lot 2 outlines the scope of work required of the FRAEW Audit Supplier(s). There will be sperate contract…
- Published value
- £1list or panel total repeated on every provider; not this contract's value
- Annual run-rate
- —list or panel total, not a run-rate
- Term
- Estimated end 10 Apr 2027 · start not published
- Reference
ocds-h6vhtk-03a34c
- Estimated end · in 164 days
Homes England - FRAEW Financial Hardship Cases and FRAEW Audit
Homes England (the name adopted by the Homes and Communities Agency) · Other public body · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Incumbent: PRP ARCHITECTURE LLP · Last contest: 6 bids (6 SME)
The scope of services is split into two sections. Lot 1 outlines the scope of work required of the FRAEW Hardship Cases Supplier(s) and Lot 2 outlines the scope of work required of the FRAEW Audit Supplier(s). There will be sperate contract…
- Published value
- £1list or panel total repeated on every provider; not this contract's value
- Annual run-rate
- —list or panel total, not a run-rate
- Term
- Estimated end 10 Apr 2027 · start not published
- Reference
ocds-h6vhtk-03a34c
- Ends · in 167 days
Environmental, Health & Safety Consultancy
Cell & Gene Therapy Catapult · Other public body
Incumbent: S.H.E Advises
Direct Award to S.H.E. Advises due to an urgent and business critical need for immediate Health & Safety support. Contract term 13-Apr-2026 to 13-Apr-27 at £98,370.00 (including VAT).
- Published value
- £82k
- Annual run-rate
- £82kpublished value ÷ term, exc. VAT
- Term
- 13 Apr 2026 → 13 Apr 2027 · 1 yr
- Reference
ocds-h6vhtk-06a757
- Estimated end · in 168 days
Arnish multi disciplinary Design Team
Highlands and Islands Enterprise · Scotland
Incumbent: ANDERSON BELL CHRISTIE LIMITED · Last contest: 18 bids (12 SME)
- Published value
- £642k
- Annual run-rate
- —start date not published
- Term
- Estimated end 14 Apr 2027 · start not published
- Reference
ocds-h6vhtk-0553b1
- Estimated end · in 168 daysCall-off
Dial Before You Dig
SSE SERVICES PLC · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Incumbent not published · Last contest: 21 bids (6 SME)
- Published value
- Not publishedvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 14 Apr 2027 · start not published
- Reference
ocds-h6vhtk-02874b
When contracts end · Architectural, construction, engineering i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
2,296 contracts and agreements end within 24 months, 3,304 in total · £491m published GBP values end in the next 6 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 6 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services2,00379Business services: law, marketing, consulting1,65945Construction work1,50772IT services: consulting, software, internet93771Architectural, construction, engineering89150Repair and maintenance services83480Education and training services64648Software package and information systems565
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.