- Ends · todayExtension option · up to 27 Oct 2028
Provision of Domestic EPCs, phase 1
Oxford City Council · Local authority · South East England
Incumbent: GREENSTORM LIMITED
Contract for Domestic Energy Performance Certificates (EPCs), Retrofit Assessments and Measures plans for HRA properties.
- Published value
- £185kinc. VAT as published
- Annual run-rate
- £185kpublished value ÷ term, inc. VAT
- Term
- 27 Oct 2025 → 27 Oct 2026 · 1 yr · up to 27 Oct 2028 with extensions
- Reference
ocds-h6vhtk-06049a
- Ends · today
Specialist Consultancy Services to support the Future Highways Programme
Essex County Council · Local authority · East of England
Incumbent: FRIMLEY ASSOCIATES LIMITED
The provision of specialist consultancy services to support the current phase of the Future Highways Programme. The commission will provide additional analysis, assurance and advisory support to inform programme development, governance requ…
- Published value
- £80kinc. VAT as published
- Annual run-rate
- —term under 6 months
- Term
- 28 Sept 2026 → 27 Oct 2026 · 30 days
- Reference
ocds-h6vhtk-0788f8
- Ends · today
PD Steam Pipe Design
The Christie NHS Foundation Trust · Central government
Incumbent: Vital Energi Solutions Ltd
Steam main modification NPD Steam Pipe Design
- Published value
- £29k
- Annual run-rate
- —term under 6 months
- Term
- 27 Aug 2026 → 27 Oct 2026 · 2 months
- Reference
ocds-h6vhtk-07855f
- Ends · tomorrowExtension option · up to 28 Apr 2027
TVCA-PROC-0785 - Redcar Central Station Early Contractor Involvement (ECI)
Tees Valley Combined Authority · Local authority · North East England
Incumbent: Morgan Sindall Construction and Infrastructure Ltd
Tees Valley Combined Authority (TVCA) (the ‘Contacting Authority’), part of the Tees Valley Combined Authority Group, has awarded a contract for Redcar Central Station Early Contractor Involvement (ECI), to undertake gap analysis / review o…
- Published value
- £72k
- Annual run-rate
- —term under 6 months
- Term
- 22 Jul 2026 → 28 Oct 2026 · 3 months · up to 28 Apr 2027 with extensions
- Reference
ocds-h6vhtk-06e4e7
- Ends · tomorrow
Summerstown Road - BIM Consultants
Wandle Housing Association Limited · Charity · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: EVOLVE TECHCON LIMITED
To provide BIM consultancy on our land led scheme
- Published value
- £30k
- Annual run-rate
- £28kpublished value ÷ term, exc. VAT
- Term
- 29 Sept 2025 → 28 Oct 2026 · 1.1 yrs
- Reference
ocds-h6vhtk-06a057
- Ends · in 3 days
Humber Bridge Barrier Safety Improvement Scheme
Hull City Council · Local authority · Yorkshire and the Humber
Incumbent: Pell Frischmann Consultants Ltd · Last contest: 3 bids · awarded 20% under the estimate
Hull City Council (The Authority) on behalf of the Humber Bridge Board (HBB) has appointed Pell Frischmann Consultants Ltd to produce a detailed design of the safety barrier improvement scheme for the enhancement the parapets and oversee it…
- Published value
- £160k
- Annual run-rate
- —start date not published
- Term
- Ends 30 Oct 2026 · start not published
- Reference
ocds-h6vhtk-047b8b
- Ends · in 3 days
Ingleton Wood
Delta Housing Limited · Other public body · East of England
Incumbent: Ingleton Wood LLP
To provide for multi disciplinary consultant services in relation to the structural remedial repairs at Roman Way, Burnham on Crouch for Myriad Homes and Myriad Housing. This is in response to the Structural Engineering recommendation that …
- Published value
- £140k
- Annual run-rate
- £112kpublished value ÷ term, exc. VAT
- Term
- 1 Aug 2025 → 30 Oct 2026 · 1.3 yrs
- Reference
ocds-h6vhtk-05aee2
- Ends · in 3 days
Consultancy Support - Electric Vehicle Charging Point Programme
South Gloucestershire Council · Local authority · South West England
Incumbent: Waterman Aspen
Consultancy Support for South Gloucestershire Councils Electric Vehicle Charging Point Programme
- Published value
- £113k
- Annual run-rate
- £92kpublished value ÷ term, exc. VAT
- Term
- 12 Aug 2025 → 30 Oct 2026 · 1.3 yrs
- Reference
ocds-h6vhtk-0596ce
- Ends · in 3 daysExtension option · up to 30 Apr 2027
Fire Risk Assessments and Fire Door Inspections
Northamptonshire Partnership Homes · Central government · East Midlands
Incumbent: FCS-live Limited
To carry out Fire Risk Assessments and Fire Door Inspections on blocks of flats to ensure compliance with Fire Regulations.
- Published value
- £100k
- Annual run-rate
- —not computed
- Term
- 7 May 2026 → 30 Oct 2026 · 6 months · up to 30 Apr 2027 with extensions
- Reference
ocds-h6vhtk-067391
- Ends · in 3 daysExtension option · up to 30 Jun 2029
Transport Assessment
Eastleigh Borough Council · Local authority
Incumbent: HaskoningDHV UK Limited
To undertake a transport assessment of different development options for the Eastleigh Local Plan review
- Published value
- £80k
- Annual run-rate
- £64kpublished value ÷ term, exc. VAT
- Term
- 1 Aug 2025 → 30 Oct 2026 · 1.3 yrs · up to 30 Jun 2029 with extensions
- Reference
ocds-h6vhtk-058681
- Ends · in 3 daysExtension option · up to 30 Oct 2027
Harrogate Junction Improvement Options and Detailed Design
The North Yorkshire Council · Local authority · Yorkshire and the Humber
Incumbent: WSP UK Limited
Harrogate Junction Improvement Options & Detailed Design. Feasibility and design for further Harrogate TCF work
- Published value
- £77k
- Annual run-rate
- —term under 6 months
- Term
- 30 Jun 2026 → 30 Oct 2026 · 4 months · up to 30 Oct 2027 with extensions
- Reference
ocds-h6vhtk-06f4e7
- Ends · in 3 days
Measured surveys - Low Rise FRA Actions - Area V Somerstown
Portsmouth City Council · Local authority · South East England
Incumbent: THE RUXTON GROUP LTD
Measured surveys to produce floor plans and construction drawings for 53Nr low rise blocks of flats within Somerstown, Portsmouth.
- Published value
- £69kinc. VAT as published
- Annual run-rate
- —term under 6 months
- Term
- 30 Jul 2026 → 30 Oct 2026 · 3 months
- Reference
ocds-h6vhtk-06dc93
- Ends · in 3 days
Plymouth Heat Network Delivery Partner - Technical Consultancy
Plymouth City Council · Local authority · South West England
Incumbent: Buro Happold Ltd
Technical consultancy support in relation to the Plymouth Heat Network project including: - continued technical support for the current Heat Network Development Partner procurement and commercialisation (including completion of evaluations)…
- Published value
- £60k
- Annual run-rate
- £93kpublished value ÷ term, exc. VAT
- Term
- 9 Mar 2026 → 30 Oct 2026 · 8 months
- Reference
ocds-h6vhtk-06646c
- Ends · in 3 days
RIBA Stage 3 for Transforming Fleet Street Project
The Mayor and Commonalty and Citizens of the City of London · Local authority · Greater London
Incumbent: Bradley-Hole Schoenaich Landscape Architects Limited
The Provision of RIBA Stage 3 Services for Transforming Fleet Street Project.
- Published value
- £58k
- Annual run-rate
- £80kpublished value ÷ term, exc. VAT
- Term
- 9 Feb 2026 → 30 Oct 2026 · 9 months
- Reference
ocds-h6vhtk-067a06
- Ends · in 3 days
Monsal Trail - Scaling to Rock Cuttings PM03511/25/05
Peak District National Park Authority · Other public body · East Midlands
Incumbent: High Peak Access Ltd · Last contest: awarded 15% over the estimate
The Monsal Trail has a number of structures, embankments and cuttings along its 8 mile length. Following inspections of the cuttings, the Peak District National Park Authority as owners of the trail has decided to undertake regular rock sca…
- Published value
- £58k
- Annual run-rate
- £71kpublished value ÷ term, exc. VAT
- Term
- 6 Jan 2026 → 30 Oct 2026 · 10 months
- Reference
ocds-h6vhtk-05abd7
When contracts end · Architectural, construction, engineering i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
2,285 contracts and agreements end within 24 months, 3,292 in total · £490m published GBP values end in the next 6 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 6 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services1,99479Business services: law, marketing, consulting1,64245Construction work1,49672IT services: consulting, software, internet93271Architectural, construction, engineering88450Repair and maintenance services83180Education and training services64348Software package and information systems565
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.