Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the all future end dates
Showing 196–210
- Ends · in 624 daysExtension option · up to 13 Jul 2030Buyer plans to re-tender 3 Apr 2030
Electrical Materials + Power Tools
Delta Housing Limited · Other public body · East of England
Incumbent: Edmundson Electrical Limited
Supply of below goods to CHP: Lot 1 - Electrical Materials Lot 2 - Power Tools Lot 3 - Hand Tools/Consumables The primary objective of the Contract is to supply CHP with the required goods under each Lot, enabling us to effectively maintain…
- Published value
- £2.5minc. VAT as published
- Annual run-rate
- £833kpublished value ÷ term, inc. VAT
- Term
- 14 Jul 2025 → 13 Jul 2028 · 3 yrs · up to 13 Jul 2030 with extensions
- Reference
ocds-h6vhtk-04fcbb
- Ends · in 624 daysExtension option · up to 13 Jul 2030Buyer plans to re-tender 3 Apr 2030
Hand Tools / Consumables
Delta Housing Limited · Other public body · East of England
Incumbent: CHANDLER MATERIAL SUPPLIES LIMITED
Supply of below goods to CHP: Lot 1 - Electrical Materials Lot 2 - Power Tools Lot 3 - Hand Tools/Consumables The primary objective of the Contract is to supply CHP with the required goods under each Lot, enabling us to effectively maintain…
- Published value
- £315kinc. VAT as published
- Annual run-rate
- £105kpublished value ÷ term, inc. VAT
- Term
- 14 Jul 2025 → 13 Jul 2028 · 3 yrs · up to 13 Jul 2030 with extensions
- Reference
ocds-h6vhtk-04fcbb
- Estimated end · in 626 daysCall-off
TPPL Newark and Sherwood District Council – Highland Council DPS Category 3 – Electric Charging Infrastructure (16617)
Newark And Sherwood District Council · Local authority · Nationwide (UK), Yorkshire and the Humber, East Midlands, East of England, South East England, South West England
Incumbent: Hanger 19 Ltd tas Park & Recharge · Last contest: 4 bids (0 SME)
- Published value
- £12kvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 15 Jul 2028 · start not published
- Reference
ocds-h6vhtk-02de73
- Ends · in 642 days
Provision of EEG Electrodes
Hull University Teaching Hospitals NHS Trust · Central government · Yorkshire and the Humber
Incumbent: Neurogen Limited
Provision of EEG Electrodes to Hull University Teaching Hospitals NHS Foundation Trust.
- Published value
- £42k
- Annual run-rate
- £21kpublished value ÷ term, exc. VAT
- Term
- 1 Aug 2026 → 31 Jul 2028 · 2 yrs
- Reference
ocds-h6vhtk-06e471
- Ends · in 642 days
SCH - Uninterruptible Power Supply (UPS)
Sheffield Children's NHS Foundation Trust · Central government · Yorkshire and the Humber
Incumbent: SECURE POWER LTD
Provision of maintenance and repair services for the Trust’s uninterruptible power supply (UPS) systems.
- Published value
- £21k
- Annual run-rate
- £11kpublished value ÷ term, exc. VAT
- Term
- 3 Aug 2026 → 31 Jul 2028 · 2 yrs
- Reference
ocds-h6vhtk-06e658
- Ends · in 652 daysExtension option · up to 10 Aug 2030Buyer plans to re-tender 1 Mar 2030
Supply of Electrical Materials
East Suffolk Council · Local authority · East of England
Incumbent: Edmundson Electrical Limited · Last contest: awarded at the estimate
East Suffolk Council is looking to appoint a supplier for the following, • Supply and Delivery of electrical products and associated accessories to the East Suffolk Council, Housing Repairs and Maintenance Team Depot Stores at Rotterdam Roa…
- Published value
- £2.5m
- Annual run-rate
- £917kpublished value ÷ term, exc. VAT
- Term
- 19 Nov 2025 → 10 Aug 2028 · 2.8 yrs · up to 10 Aug 2030 with extensions
- Reference
ocds-h6vhtk-051385
- Estimated end · in 660 daysFramework record
C397 - 33kV Package Substations
Northern Ireland Electricity Networks Limited · Northern Ireland
Incumbent: B&S Group Ltd
- Published value
- £4.0mpublished ceiling for the whole framework
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 18 Aug 2028 · start not published
- Reference
ocds-h6vhtk-034064
- Estimated end · in 661 daysFramework recordPanel · 27 suppliers
Electric Vehicle Charging Infrastructure
Welsh Government - Commercial Delivery · Wales (Cymru)
Panel: ARCADIS CONSULTING (UK) LIMITED, Atkins Limited, Blink Charging UK Limited +24 more
- Published value
- £100mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 19 Aug 2028 · start not published
- Reference
ocds-h6vhtk-042b61
- Ends · in 673 days
UKRI-4496 - Synchrotron Arbitrary Waveform Generators
UK Research and Innovation · Central government · South East England
Incumbent: Energy Technology S.R.L. · Last contest: 5 bids · awarded 20% under the estimate
Manufacture and Supply of forty (40) 210kW bipolar pulsed power supplies for the trim quadrupole and steering dipole magnets in ISIS.
- Published value
- £2.0m
- Annual run-rate
- —start date not published
- Term
- Ends 31 Aug 2028 · start not published
- Reference
ocds-h6vhtk-05163a
- Ends · in 673 daysExtension option
Renewal of service contract for the power back-up generator control systems for Plowright and the Energy Centre (EC1)
THE PIRBRIGHT INSTITUTE · Other public body · South East England
Incumbent: Total Energy Controls Limited
Maintenance of generator control systems equipment including an exact mock-up of the control systems so that install upgrades and new parts can be tested these before added to our live system here on site. The site mock-up is an invaluable …
- Published value
- £30k
- Annual run-rate
- £10kpublished value ÷ term, exc. VAT
- Term
- 1 Sept 2025 → 31 Aug 2028 · 3 yrs
- Reference
ocds-h6vhtk-058f0f
- Ends · in 674 daysFramework recordPanel · 17 suppliers
YPO - 001206 Vending Machine and Water Cooler Solutions
YPO · Nationwide (UK)
Panel: Alpine Vending Co. Ltd, BWT UK Ltd, Culligan (UK) Limited +14 more
- Published value
- £100mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Ends 1 Sept 2028 · start not published
- Reference
ocds-h6vhtk-047347
- Ends · in 680 daysExtension option · up to 7 Sept 2030
ESC044/2025 - Purchase of steel wire armoured 27 multi-core traffic signal cables and other associated cables
Middlesbrough Council · Local authority · North East England
Incumbent: Edmundson Electrical Limited
A contract for the purchase and supply of steel wire armoured 27 multi-core traffic signal cables and other associated cables.
- Published value
- £250k
- Annual run-rate
- £97kpublished value ÷ term, exc. VAT
- Term
- 7 Feb 2026 → 7 Sept 2028 · 2.6 yrs · up to 7 Sept 2030 with extensions
- Reference
ocds-h6vhtk-050b61
- Estimated end · in 693 daysCall-off
Supply of 33 & 11kV Distribution Capacitor Banks
Northern Ireland Electricity Networks Limited · Nationwide (UK), Northern Ireland
Incumbent: SPLHV Consultancy Limited
NIE Networks Limited seeks to appoint a suitably qualified and experienced organisation on framework for the supply of 11kV & 33kV Distribution Capacitor Banks.
- Published value
- £2.0mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 20 Sept 2028 · start not published
- Reference
ocds-h6vhtk-031eef
- Estimated end · in 694 days
Cryomodule Thermal Shield
UK Research and Innovation · Central government · North West England
Incumbent: INOX India Limited · Last contest: 3 bids · awarded 37% under the estimate
Production and supply of HB650 Cryomodule Thermal Shield
- Published value
- £118k
- Annual run-rate
- —start date not published
- Term
- Estimated end 21 Sept 2028 · start not published
- Reference
ocds-h6vhtk-04a305
- Estimated end · in 701 daysCall-off
TPPL South Derbyshire District Council– Highland Council DPS Category 3 – 2 x 7kw Dual Charging Points & 1 x 40kw Dual Charging Point (16736)
South Derbyshire District Council · Local authority · Nationwide (UK), Yorkshire and the Humber, East Midlands, East of England, South East England, South West England
Incumbent: Hanger 19 Ltd tas Park & Recharge · Last contest: 4 bids (0 SME)
- Published value
- £32kvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 28 Sept 2028 · start not published
- Reference
ocds-h6vhtk-02de73
When contracts end · Electrical machinery i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
215 contracts and agreements end within 24 months, 325 in total · £644m published GBP values end in the all future end dates, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, all future end dates i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services9,87279Business services: law, marketing, consulting5,54760Transport services (except waste transport)4,94245Construction work4,73450Repair and maintenance services3,69972IT services: consulting, software, internet3,48771Architectural, construction, engineering3,30480Education and training services2,867
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.