Retender radar: UK public contracts ending soon

Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the all future end dates

Showing 196–198

  1. Ends · in 5,269 daysBuyer plans to re-tender 18 Jan 2039

    Residential Electric Vehicle Charging Infrastructure - Lot 4 - Yellow Lot

    Milton Keynes Council · Local authority · South East England

    Incumbent: Qwello Uk Ltd

    The Milton Keynes City Council (the "Council") has been allocated £1.442M OZEV LEVI (Local Electric Vehicle Infrastructure) Capital funding to expand our network of low power, on-street charging infrastructure. We are fairly advanced in our…

    Published value
    £38m
    Annual run-rate
    £2.5mpublished value ÷ term, exc. VAT
    Term
    1 Apr 2026 → 1 Apr 2041 · 15 yrs
    Reference
    ocds-h6vhtk-0508a8
  2. Ends · in 5,303 daysExtension option · up to 5 May 2042

    Concession Contract for the Provision of Electric Vehicle Charging Points 2026 - 2041

    Hampshire County Council · Local authority · South East England

    Incumbent: Liberty Charge Limited · Last contest: awarded at the estimate

    Hampshire County Council (The Authority) is procuring a Concession Contract for the provision of Electric Vehicle Charging Points along with the associated infrastructure and software to help deliver local, on-street Electric Vehicle (EV) c…

    Published value
    £4.0bn
    Annual run-rate
    £267mpublished value ÷ term, exc. VAT
    Term
    5 May 2026 → 5 May 2041 · 15 yrs · up to 5 May 2042 with extensions
    Reference
    ocds-h6vhtk-056bfe
  3. Estimated end · in 6,941 days

    Local Electric Vehicle Infrastructure (LEVI)

    Kent County Council · Local authority · South East England

    Incumbent: Urban Fox Networks (Kent) Limited · Last contest: 3 bids

    The Kent County Council (KCC) has awarded a contract for Local Electric Vehicle Infrastructure (LEVI). In line with Government plans to decarbonise transport and end the sale of petrol and diesel cars, Kent County Council is preparing the n…

    • Installation services of electrical and mechanical equipment
    Published value
    Not published
    Annual run-rate
    —value not published
    Term
    Estimated end 29 Oct 2045 · start not published
    Reference
    ocds-h6vhtk-04be5c

When contracts end · Installation services (except software)
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

127 contracts and agreements end within 24 months, 198 in total · £540m published GBP values end in the all future end dates, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months49
  2. 3–6 months21
  3. 6–12 months22
  4. 12–24 months35

Top sectors, all future end dates
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.