Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the all future end dates
Showing 241–255
- Ends · in 976 daysExtension option · up to 30 Jun 2031
Maintenance Contract for Starkstrom Theatre Pendants, IPS (Isolated Power Supply) and UPS (Uninterruptible Power Supply), TCP (Theatre Control Panels) and Operating Lights under HTM 06-01 PA23 for a hospital environment
North Cumbria Integrated Care NHS Foundation Trust · Central government · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: Starkstrom Limited
Maintenance Contract for Starkstrom Theatre Pendants, IPS (Isolated Power Supply) and UPS (Uninterruptible Power Supply), TCP (Theatre Control Panels) and Operating Lights under HTM 06-01 PA23 for a hospital environment. This is a goods con…
- Published value
- £662k
- Annual run-rate
- £221kpublished value ÷ term, exc. VAT
- Term
- 1 Jul 2026 → 30 Jun 2029 · 3 yrs · up to 30 Jun 2031 with extensions
- Reference
ocds-h6vhtk-064df8
- Ends · in 989 days
COMPUTER - NETWORKS COMMUNICATIONS CABLING
Derbyshire Community Health Services NHS Foundation Trust · Central government · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: PROBRAND LIMITED
Cisco DNA Essentials License - 3yr Cisco Catalyst 9120AXI access point APC Replacement UPS battery
- Published value
- £10k
- Annual run-rate
- £3kpublished value ÷ term, exc. VAT
- Term
- 14 Jul 2026 → 13 Jul 2029 · 3 yrs
- Reference
ocds-h6vhtk-06c9bd
- Ends · in 992 daysExtension option · up to 15 Jul 2030
1972 Bakerloo line Tube stock Supply of Electrical Parts for Rail Vehicle Accessibility Regulations Project
Docklands Light Railway Limited · Other public body · Greater London
Incumbent: P.K. ENGINEERING (WEST BROMWICH) LIMITED · Last contest: awarded 8% under the estimate
Supply of Electrical Parts for RVAR Project for 1972 Bakerloo Line for London Underground Limited, built to an approved design. Goods required to facilitate compliance to the Rail Vehicle Accessibility Regulations Project for 1972 Tube Stoc…
- Published value
- £458k
- Annual run-rate
- £153kpublished value ÷ term, exc. VAT
- Term
- 17 Jul 2026 → 16 Jul 2029 · 3 yrs · up to 15 Jul 2030 with extensions
- Reference
ocds-h6vhtk-0558ed
- Ends · in 1,007 daysExtension option · up to 31 Jul 2031
Academic Campus
Cardiff University · Education · Wales (Cymru)
Incumbent: INNOVATIVE FIRE & SECURITY LIMITED
Maintenance of fire alarm systems across the Cardiff University campus, covering both residential and academic/professional services buildings. It aims to provide an operation and maintenance service to ensure that all fire alarms function …
- Published value
- £3.2m
- Annual run-rate
- £1.1mpublished value ÷ term, exc. VAT
- Term
- 1 Aug 2026 → 31 Jul 2029 · 3 yrs · up to 31 Jul 2031 with extensions
- Reference
ocds-h6vhtk-0602a1
- Ends · in 1,007 days
Provision of Installation and Maintenance of Christmas Lights in Barnsley Town Centre locations
Barnsley Metropolitan Borough Council · Local authority · Nationwide (UK)
Incumbent: City of Bradford MDC Festival Lights Department · Last contest: awarded 1% under the estimate
The Council is looking to establish a contract with a Provider for the install and storage of Christmas lights owned by Barnsley Council for the Town Centre. The contract is also to provide commercial grade outdoor/indoor festive illuminati…
- Published value
- £356kinc. VAT as published
- Annual run-rate
- £119kpublished value ÷ term, inc. VAT
- Term
- 1 Aug 2026 → 31 Jul 2029 · 3 yrs
- Reference
ocds-h6vhtk-067bf5
- Ends · in 1,007 daysExtension option · up to 31 Jul 2031
Residences Campus
Cardiff University · Education · Wales (Cymru)
Incumbent: PROTECTORCOMMS LIMITED
Maintenance of fire alarm systems across the Cardiff University campus, covering both residential and academic/professional services buildings. It aims to provide an operation and maintenance service to ensure that all fire alarms function …
- Published value
- £297k
- Annual run-rate
- £99kpublished value ÷ term, exc. VAT
- Term
- 1 Aug 2026 → 31 Jul 2029 · 3 yrs · up to 31 Jul 2031 with extensions
- Reference
ocds-h6vhtk-0602a1
- Ends · in 1,007 daysExtension option · up to 31 Jul 2030Panel · 2 suppliers
TOOLS AND EQUIPMENT
The City of Liverpool College · Education · North West England
Panel: CAE ENGINEERING & ARCHITECTURE LTD, Powred Heating Components Limited t/a PHC Parts
- Published value
- £225k
- Annual run-rate
- —panel, not one supplier
- Term
- 8 May 2026 → 31 Jul 2029 · 3.3 yrs · up to 31 Jul 2030 with extensions
- Reference
ocds-h6vhtk-060d4b
- Ends · in 1,007 daysExtension option · up to 31 Jul 2030Panel · 3 suppliers
Plumbing
The City of Liverpool College · Education · North West England
Panel: Huws Gray Limited, Powred Heating Components Limited t/a PHC Parts, UK Plumbing Supplies Limited
- Published value
- £181k
- Annual run-rate
- —panel, not one supplier
- Term
- 8 May 2026 → 31 Jul 2029 · 3.3 yrs · up to 31 Jul 2030 with extensions
- Reference
ocds-h6vhtk-060d4b
- Ends · in 1,007 daysExtension option · up to 31 Jul 2030Panel · 4 suppliers
Electrical Materials
The City of Liverpool College · Education · North West England
Panel: City Electrical Factors Limited, Edmundson Electrical Limited, Powred Heating Components Limited t/a PHC Parts +1 more
New lot 8 (not lot 7 as per error on UK6 notice) which relates to the electrical materials requirements for the College.
- Published value
- £123k
- Annual run-rate
- —panel, not one supplier
- Term
- 1 Sept 2026 → 31 Jul 2029 · 2.9 yrs · up to 31 Jul 2030 with extensions
- Reference
ocds-h6vhtk-060d4b
- Ends · in 1,007 daysExtension option · up to 31 Jul 2031
Electrical Materials
New College Swindon · Education · Nationwide (UK)
Incumbent: Rexel UK Limited
For the supply for electrical materials for both facilities and curriculum requirements
- Published value
- £115k
- Annual run-rate
- £38kpublished value ÷ term, exc. VAT
- Term
- 1 Aug 2026 → 31 Jul 2029 · 3 yrs · up to 31 Jul 2031 with extensions
- Reference
ocds-h6vhtk-0685a3
- Ends · in 1,007 daysExtension option · up to 31 Jul 2030
Refrigeration
The City of Liverpool College · Education · North West England
Incumbent: Powred Heating Components Limited t/a PHC Parts
- Published value
- £100k
- Annual run-rate
- £32kpublished value ÷ term, exc. VAT
- Term
- 8 Jun 2026 → 31 Jul 2029 · 3.2 yrs · up to 31 Jul 2030 with extensions
- Reference
ocds-h6vhtk-060d4b
- Ends · in 1,007 daysExtension option · up to 31 Jul 2030Panel · 2 suppliers
Building and Construction Materials
The City of Liverpool College · Education · North West England
Panel: CAE ENGINEERING & ARCHITECTURE LTD, Huws Gray Limited
- Published value
- £39k
- Annual run-rate
- —panel, not one supplier
- Term
- 8 May 2026 → 31 Jul 2029 · 3.3 yrs · up to 31 Jul 2030 with extensions
- Reference
ocds-h6vhtk-060d4b
- Ends · in 1,007 days
Christmas Lights in Ross-on-Wye Town Centre
Ross-on-Wye Town Council · Local authority · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: OAKEY & SON LIMITED · Last contest: awarded at the estimate
18 THE SCHEME IN BRIEF 18.1 Christmas lights decorate the town centre for the Christmas period extending from the switch on event to 6th January each year. The existing scheme comprises LED icicle cross street lights and hedgehog motif fram…
- Published value
- £30k
- Annual run-rate
- £10kpublished value ÷ term, exc. VAT
- Term
- 5 Aug 2026 → 31 Jul 2029 · 3 yrs
- Reference
ocds-h6vhtk-06901b
- Ends · in 1,007 daysExtension option · up to 31 Jul 2030Panel · 2 suppliers
WOOD
The City of Liverpool College · Education · North West England
Panel: CAE ENGINEERING & ARCHITECTURE LTD, Huws Gray Limited
- Published value
- £23k
- Annual run-rate
- —panel, not one supplier
- Term
- 8 May 2026 → 31 Jul 2029 · 3.3 yrs · up to 31 Jul 2030 with extensions
- Reference
ocds-h6vhtk-060d4b
- Ends · in 1,007 daysExtension option · up to 31 Jul 2030Panel · 4 suppliers
PAINTING AND DECORATING
The City of Liverpool College · Education · North West England
Panel: A & B TRADE PAINT SUPPLIES LIMITED, CAE ENGINEERING & ARCHITECTURE LTD, Huws Gray Limited +1 more
- Published value
- £20k
- Annual run-rate
- —panel, not one supplier
- Term
- 8 May 2026 → 31 Jul 2029 · 3.3 yrs · up to 31 Jul 2030 with extensions
- Reference
ocds-h6vhtk-060d4b
When contracts end · Electrical machinery i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
215 contracts and agreements end within 24 months, 325 in total · £644m published GBP values end in the all future end dates, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, all future end dates i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services9,87279Business services: law, marketing, consulting5,54760Transport services (except waste transport)4,94245Construction work4,73450Repair and maintenance services3,69972IT services: consulting, software, internet3,48771Architectural, construction, engineering3,30480Education and training services2,867
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.