Retender radar: UK public contracts ending soon

Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the all future end dates

Showing 316–325

  1. Estimated end · in 2,469 daysFramework record

    PRO004839 Goods Framework The Supply and Delivery of MCC Panels

    United Utilities Water Limited · North West England

    Incumbent not published

    • Electrical apparatus for switching or protecting electrical circuits
    Published value
    £32mpublished ceiling for the whole framework
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 1 Aug 2033 · start not published
    Reference
    ocds-h6vhtk-04c2e6
  2. Ends · in 2,711 days

    Replacement Instrumentation - Hydrocarbons

    ENVIRONMENT AGENCY · Other public body · Nationwide (UK)

    Incumbent: We Care 4 Air · Last contest: 3 bids

    Replacement Instrumentation for use on the UK Automatic Hydrocarbons Network. Purchase, Testing and Equipment Support of new Instrumentation

    • Instrumentation and control equipment
    Published value
    £1.6m
    Annual run-rate
    —start date not published
    Term
    Ends 31 Mar 2034 · start not published
    Reference
    ocds-h6vhtk-032116
  3. Estimated end · in 2,774 daysFramework recordPanel · 2 suppliers

    Supply, Installation and Maintenance of Fixed Standby Generators

    Scottish Water · Scotland

    Panel: Dieselec Thistle Generators Ltd, Ross-Shire Engineering

    • Generators
    Published value
    £25mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 2 Jun 2034 · start not published
    Reference
    ocds-h6vhtk-05a24d
  4. Estimated end · in 2,786 daysFramework record

    The Provision of Jetting Units, Hoses and Consumables

    Scottish Water · Scotland

    Incumbent: Scotjet Limited

    • Electrical machinery, apparatus, equipment and consumables; lighting
    Published value
    £8.0mpublished ceiling for the whole framework
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 14 Jun 2034 · start not published
    Reference
    ocds-h6vhtk-066a4f
  5. Estimated end · in 3,007 days

    Procurement of Countdown3 (CD3) Services

    Transport for London · Other public body · Nationwide (UK), Greater London

    Incumbent: Vix Technology UK Ltd · Last contest: 2 bids

    The CD3 contract includes the supply, installation and maintenance of the Countdown Smart Signs (CDSSs) and their integration with Real Time Passenger Information (RTPI) APIs, as well as the provision of a Remote Management Tool (RMT) and i…

    • Graphic display panels
    Published value
    Not published
    Annual run-rate
    —value not published
    Term
    Estimated end 21 Jan 2035 · start not published
    Reference
    ocds-h6vhtk-03beed
  6. Ends · in 3,329 daysExtension option · up to 9 Dec 2037

    Electric Vehicle Column Chargers

    Liverpool City Council · Local authority · North West England

    Incumbent: OTASKI ENERGY SOLUTIONS LTD

    Published value
    £12m
    Annual run-rate
    £1.2mpublished value ÷ term, exc. VAT
    Term
    10 Dec 2025 → 9 Dec 2035 · 10 yrs · up to 9 Dec 2037 with extensions
    Reference
    ocds-h6vhtk-058ec1
  7. Ends · in 3,329 daysExtension option · up to 9 Dec 2037

    Electric Vehicle Column Chargers

    Liverpool City Council · Local authority · North West England

    Incumbent: OTASKI ENERGY SOLUTIONS LTD

    Liverpool City Council is looking to engage an Electric Vehicle (EV) Charge Point Operator to supply, install, maintain and operate 300 EV chargers for up to 12 years. This will include procurement of electricity and charging users for it a…

    Published value
    £12m
    Annual run-rate
    £1.2mpublished value ÷ term, exc. VAT
    Term
    10 Dec 2025 → 9 Dec 2035 · 10 yrs · up to 9 Dec 2037 with extensions
    Reference
    ocds-h6vhtk-058ec1
  8. Estimated end · in 3,599 days

    Supply of Battery Energy Storage System.

    Public Power Solutions Ltd (PPS) · Nationwide (UK)

    Incumbent: Fluence Energy GmbH · Last contest: 7 bids (0 SME) · awarded 36% over the estimate

    Supply of Battery Energy Storage System at Waterside Innovation Hub, Located at Brindley Close, Cheney Manor, Swindon, SN2 2YW.Zenobe Energy and Public Power Solutions are working as project partners to deliver the Waterside Innovation Hub …

    • Electrical equipment and apparatus
    Published value
    £6.1m
    Annual run-rate
    —start date not published
    Term
    Estimated end 4 Sept 2036 · start not published
    Reference
    ocds-h6vhtk-02cdd4
  9. Estimated end · in 5,643 daysLinked to a framework or DPS

    COV - Residential electric vehicle charging points

    Coventry City Council · Local authority · West Midlands

    Incumbent: Connected Kerb Limited

    • Chargers
    Published value
    £9.3mvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 10 Apr 2042 · start not published
    Reference
    ocds-h6vhtk-03931c
  10. Estimated end · in 6,823 days

    North of Scotland Electric Vehicle Charging Infrastructure Partnership

    The Highland Council · Local authority · Scotland

    Incumbent: EasyGo · Last contest: 2 bids (0 SME) · awarded 40% under the estimate

    North of Scotland Electric Vehicle Infrastructure Delivery Partnership incorporating current chargers, new chargers, public and fleet provision with investment opportunity into key underdeveloped sites

    • Electrical equipment and apparatus
    Published value
    £300m
    Annual run-rate
    —start date not published
    Term
    Estimated end 3 Jul 2045 · start not published
    Reference
    ocds-h6vhtk-046cb9

When contracts end · Electrical machinery
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

215 contracts and agreements end within 24 months, 325 in total · £644m published GBP values end in the all future end dates, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months47
  2. 3–6 months67
  3. 6–12 months41
  4. 12–24 months60

Top sectors, all future end dates
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.