Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the all future end dates
Showing 3,301–3,304
- Estimated end · in 7,265 days
Provision of ESCo Services at Preston Barracks (Makerfield) Scheme, Brighton
Optivo · South East England
Incumbent: Switch2 Energy Limited · Last contest: 3 bids (1 SME)
Optivo is looking to appoint a Energy Service Company (ESCo) for the provision of ESCo Services to our Preston Barracks (Makerfield) Scheme in Brighton, which is currently under development. Optivo’s residential parcel at Preston Barracks i…
- Published value
- £2.5m
- Annual run-rate
- —start date not published
- Term
- Estimated end 18 Sept 2046 · start not published
- Reference
ocds-h6vhtk-03201f
- Estimated end · in 7,858 days
COV - Strategic Energy Partner
Coventry City Council · Local authority · West Midlands
Incumbent: E.ON UK · Last contest: 3 bids (0 SME) · awarded at the estimate
The overall objective of this Project is to enable the city of Coventry to reach net zero carbon emissions (Net Zero) in the long term, in a sustainable and economically viable way. In doing so, the Project is expected to achieve the follow…
- Published value
- £2.0bn
- Annual run-rate
- —start date not published
- Term
- Estimated end 3 May 2048 · start not published
- Reference
ocds-h6vhtk-0366a9
- Estimated end · in 13,631 days
Heat Network Opportunity at Granton Waterfront, Edinburgh
The City of Edinburgh Council · Local authority · Scotland
Incumbent: Vattenfall Heat UK · Last contest: 4 bids (4 SME)
The City of Edinburgh Council (the Council) is seeking to procure the delivery of a low carbon heat network to serve the Granton Waterfront development and existing buildings in the surrounding area under a concession model. The Council wis…
- Published value
- £885k
- Annual run-rate
- —start date not published
- Term
- Estimated end 22 Feb 2064 · start not published
- Reference
ocds-h6vhtk-03985a
- Ends · in 25,477 daysExtension optionPanel · 2 suppliers
HEAT NETWORK DEVELOPMENT PARTNER
Plymouth City Council · Local authority · South West England
Panel: HEAT NETWORKS DEVELOPMENT COMPANY NO.1 LIMITED, Vital Energi Utilities Limited
Plymouth City Council (PCC) was seeking a Development Partner (DP) to develop and deliver a heat network(s) in the Plymouth's South Coast and Derriford areas. Initially, the DP will be responsible for design and commercialisation of the pro…
- Published value
- £3.5bn
- Annual run-rate
- —panel, not one supplier
- Term
- 29 Jul 2026 → 29 Jul 2096 · 70 yrs
- Reference
ocds-h6vhtk-04ebb1
When contracts end · Architectural, construction, engineering i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
2,296 contracts and agreements end within 24 months, 3,304 in total · £5.5bn published GBP values end in the all future end dates, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, all future end dates i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services9,87279Business services: law, marketing, consulting5,54760Transport services (except waste transport)4,94245Construction work4,73450Repair and maintenance services3,69972IT services: consulting, software, internet3,48771Architectural, construction, engineering3,30480Education and training services2,867
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.