Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the all future end dates
Showing 3,451–3,465
- Estimated end · in 2,810 daysFramework record
Advanced Metering Infrastructure for Non-Household Customers: AMI Smart Water Meters, Networks and Data services
Scottish Water · Scotland
Incumbent: Elster Water Metering T/A Honeywell
- Published value
- £5.0mpublished ceiling for the whole framework
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 8 Jul 2034 · start not published
- Reference
ocds-h6vhtk-04b35a
- Estimated end · in 2,918 days
Tender 90/2022 - Computing Platform
Newry Mourne & Down District Council · Local authority · Northern Ireland
Incumbent: eircom UK Ltd · Last contest: 2 bids
Newry, Mourne and Down District Council is procuring Computing Platform services on behalf of itself and 9 other Councils in Northern Ireland with similar requirements. The Council offers all interested potential tenderers to join a Webinar…
- Published value
- £1.3m
- Annual run-rate
- —start date not published
- Term
- Estimated end 24 Oct 2034 · start not published
- Reference
ocds-h6vhtk-03ae1e
- Ends · in 2,925 days
Procurement of a Single Highways Asset Management ICT System
Dorset Council · Local authority · South West England
Incumbent: Symology Ltd · Last contest: 8 bids · awarded 26% under the estimate
Dorset Council manages over 2,400 miles of roads and 2,800 miles of countryside rights of way, as well as being responsible for everything associated with them such as bridges & structures, cycleways, footways, drainage, street lighting…
- Published value
- £1.3m
- Annual run-rate
- —start date not published
- Term
- Ends 31 Oct 2034 · start not published
- Reference
ocds-h6vhtk-04c2c9
- Estimated end · in 2,984 daysCall-off
YPO - 001274 Further Competition for the Provision of End to End Commercial Management Solution (E2E CMS)
YPO · Nationwide (UK)
Incumbent: Atamis Ltd · Last contest: 27 bids (13 SME)
- Published value
- £5.0mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 29 Dec 2034 · start not published
- Reference
ocds-h6vhtk-041a17
- Estimated end · in 2,991 days
Pioneer Group Housing Management System and Support Services
The Pioneer Housing and Community Group Limited · West Midlands
Incumbent: Rubixx Solutions Limited · Last contest: 5 bids · awarded 50% under the estimate
Pioneer are seeking to replace the Housing Management System (HMS), Asset Management System (AMS) and Finance system as well as introduce improved Customer Relationship Management functionality (CRM) into Pioneer.
- Published value
- £750k
- Annual run-rate
- —start date not published
- Term
- Estimated end 5 Jan 2035 · start not published
- Reference
ocds-h6vhtk-048301
- Estimated end · in 2,999 daysFramework record
Dynamic decision and Case Management System
Police Digital Service · Police & fire · Nationwide (UK)
Incumbent: Black Rainbow Ltd.
- Published value
- £30mpublished ceiling for the whole framework
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 13 Jan 2035 · start not published
- Reference
ocds-h6vhtk-03dc39
- Ends · in 3,105 daysExtension option · up to 30 Apr 2040
Procurement Integration Platform
Yorkshire Purchasing Organisation · Other public body · Yorkshire and the Humber
Incumbent: IRIS Software Limited
The Contract covers the integration and functionality allowing customers to purchase products and use services offered through the EPI Platform.
- Published value
- £40k
- Annual run-rate
- £4kpublished value ÷ term, exc. VAT
- Term
- 30 Apr 2025 → 29 Apr 2035 · 10 yrs · up to 30 Apr 2040 with extensions
- Reference
ocds-h6vhtk-052bdb
- Estimated end · in 3,111 days
EPoS solution implementation and software support partner
English Heritage · Nationwide (UK)
Incumbent: Dynavics Limited · Last contest: 13 bids (11 SME)
English Heritage are replacing their existing EPoS solution that is used by our circa 100 pay to enter sites to support retail and food and beverage sales for visitors. A desired solution will utilise existing EPoS hardware (circa 350 tills…
- Published value
- £3.2m
- Annual run-rate
- —start date not published
- Term
- Estimated end 5 May 2035 · start not published
- Reference
ocds-h6vhtk-0426a9
- Estimated end · in 3,111 days
Ticketing - System Implementation and Support Partner
English Heritage · Nationwide (UK)
Incumbent: Ventrata · Last contest: 20 bids (16 SME)
English Heritage are replacing our existing Ticketing solution that is used by our circa 100 pay to enter sites to support ticketing sales and admissions for our visitors. Our expectation is that the solution will utilise our existing EPoS …
- Published value
- £2.3m
- Annual run-rate
- —start date not published
- Term
- Estimated end 5 May 2035 · start not published
- Reference
ocds-h6vhtk-041d23
- Estimated end · in 3,111 days
NAV2013 Upgrade to Business Central - System Implementation and Support Partner
English Heritage · Nationwide (UK)
Incumbent: Dynavics Limited · Last contest: 5 bids (5 SME) · awarded 6% under the estimate
English Heritage are upgrading our existing Microsoft Dynamics NAV 2013 solution to Microsoft Business Central. The NAV 2013 solution supports our circa 100 pay to enter sites which provide retail, food, beverage and ticketing sales for our…
- Published value
- £2.1m
- Annual run-rate
- —start date not published
- Term
- Estimated end 5 May 2035 · start not published
- Reference
ocds-h6vhtk-0415dc
- Estimated end · in 3,111 days
EPoS hardware purchase
English Heritage · Nationwide (UK)
Incumbent: Dynavics Limited · Last contest: 11 bids (9 SME)
English Heritage are replacing their existing EPoS solution that is used by our circa 100 pay to enter sites to support retail and food and beverage sales for visitors. A desired solution will utilise existing EPoS hardware (circa 350 tills…
- Published value
- £524k
- Annual run-rate
- —start date not published
- Term
- Estimated end 5 May 2035 · start not published
- Reference
ocds-h6vhtk-0426a9
- Estimated end · in 3,111 days
Terminal image management, installation plus EPoS hardware and associated peripherals support
English Heritage · Nationwide (UK)
Incumbent: Dynavics Limited · Last contest: 9 bids (7 SME)
English Heritage are replacing their existing EPoS solution that is used by our circa 100 pay to enter sites to support retail and food and beverage sales for visitors. A desired solution will utilise existing EPoS hardware (circa 350 tills…
- Published value
- £414k
- Annual run-rate
- —start date not published
- Term
- Estimated end 5 May 2035 · start not published
- Reference
ocds-h6vhtk-0426a9
- Estimated end · in 3,140 days
Contract
the Education Authority · Education · Northern Ireland
Incumbent: SOFTLINK EUROPE LTD · Last contest: 5 bids (1 SME) · awarded at the estimate
The Education Authority (EA) invites tenders for the Provision of a Library Management System. The initial contract period is for 5 years with the option to extend the contract by further periods of 2 years + 2 years + 1 year. The administe…
- Published value
- £4.4m
- Annual run-rate
- —start date not published
- Term
- Estimated end 3 Jun 2035 · start not published
- Reference
ocds-h6vhtk-04b5bd
- Estimated end · in 3,144 days
CO0371 - Social Care Platform Programme (SCPP)
Essex County Council · Local authority · East of England
Incumbent: Access UK Ltd · Last contest: 3 bids
Essex County Council is submitting to tender the requirements for the provision of a fully integrated Social Care Case management Solution, to include Adults, Children and Families Social Care as well as an integrated financial solution. We…
- Published value
- Not published
- Annual run-rate
- —value not published
- Term
- Estimated end 7 Jun 2035 · start not published
- Reference
ocds-h6vhtk-0386c3
- Estimated end · in 3,151 days
UK Land Carbon Registry
Scottish Forestry · Scotland
Incumbent: S&P Global Limited · Last contest: 9 bids (7 SME) · awarded at the estimate
AWARD NOTICE: The UK Land Carbon Registry enables the accurate, safe and transparent recording of carbon credits under the Woodland Carbon Code and Peatland Code and has been in operation since 2013.
- Published value
- £600k
- Annual run-rate
- —start date not published
- Term
- Estimated end 14 Jun 2035 · start not published
- Reference
ocds-h6vhtk-04b338
When contracts end · IT services: consulting, software, internet i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
2,358 contracts and agreements end within 24 months, 3,487 in total · £12bn published GBP values end in the all future end dates, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, all future end dates i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services9,87279Business services: law, marketing, consulting5,54760Transport services (except waste transport)4,94245Construction work4,73450Repair and maintenance services3,69972IT services: consulting, software, internet3,48771Architectural, construction, engineering3,30480Education and training services2,867
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.