Retender radar: UK public contracts ending soon

Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the all future end dates

Showing 346–360

  1. Ends · in 764 daysFramework record

    Tender for Ironmongery

    Sandwell Metropolitan Borough Council · Local authority · West Midlands

    Incumbent: CBS Midlands

    • Ironmongery
    Published value
    £1.4mpublished ceiling for the whole framework
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Ends 30 Nov 2028 · start not published
    Reference
    ocds-h6vhtk-047dbb
  2. Ends · in 764 days

    A10 Loadbalancer

    The North Yorkshire Council · Local authority · Yorkshire and the Humber

    Incumbent: A10 Networks Ltd

    Supply of 3 hardware appliances and licenses plus support for a 3 year term

    Published value
    £125k
    Annual run-rate
    £42kpublished value ÷ term, exc. VAT
    Term
    1 Dec 2025 → 30 Nov 2028 · 3 yrs
    Reference
    ocds-h6vhtk-05e24c
  3. Ends · in 765 daysFramework recordPanel · 4 suppliers

    Southern Modular Building Framework 2024

    Hampshire County Council · Local authority · South East England, South West England, Wales (Cymru)

    Panel: MRC Modular Limited, Reds10 (UK) Ltd, Rollalong Ltd +1 more

    • Modular and portable buildings
    Published value
    £45mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 1 Dec 2028 · start not published
    Reference
    ocds-h6vhtk-0496a4
  4. Ends · in 765 days

    Building regulations principle designer for the phase 1 of the Barbican fire doors project

    The Mayor and Commonalty and Citizens of the City of London · Local authority

    Incumbent: Reform Architects

    Building regulations principle designer for the phase 1 of the Barbican fire doors project. To act as Building Regulations Principal Designer for Phase 1 of the Barbiacan Fire Door Replacement Programme

    Published value
    £54kinc. VAT as published
    Annual run-rate
    £17kpublished value ÷ term, inc. VAT
    Term
    1 Sept 2025 → 1 Dec 2028 · 3.3 yrs
    Reference
    ocds-h6vhtk-066c8f
  5. Estimated end · in 784 daysFramework recordPanel · 3 suppliers

    LUV01255 The supply of plumbing equipment, components, fixtures and sundries

    University of Leicester · Education · East Midlands

    Panel: City Plumbing Supplies Holdings Limited, Huws Gray Limited, UK Plumbing Supplies Limited

    • Plumbing and heating materials
    Published value
    £500kpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 20 Dec 2028 · start not published
    Reference
    ocds-h6vhtk-049c7b
  6. Estimated end · in 790 days

    The Supply of Ironmongery and Sundries for Loughborough University Stores

    Loughborough University · Education · East Midlands

    Incumbent: Huws Gray Limited · Last contest: 3 bids · awarded 10% over the estimate

    Supply of standard ironmongery items and sundries to be used across campus by building for general maintenance

    • Ironmongery
    Published value
    £440k
    Annual run-rate
    —start date not published
    Term
    Estimated end 26 Dec 2028 · start not published
    Reference
    ocds-h6vhtk-04a7fa
  7. Estimated end · in 795 daysLinked to a framework or DPSPanel · 2 suppliers

    Laptops/Hybrid Tablets/2 in1/ Desktop Monitors

    South Tyneside Council · Local authority · North East England

    Panel: GETECH LIMITED, Stone Technologies Ltd t/a Converge Technology Solutions · Last contest: 19 bids

    Framework for ICT Hardware and Peripherals - Lot 1 - Laptops/Hybrid Tablets/2 in1/ Desktop Monitors Lot 2 - Smartphones / Mobile Phones / Tablets Lot 3 - Peripherals (Keyboards/Mice/Cables/Headsets/Chargers/Backpacks) Lot 4 - Printer Toner …

    • Hardware
    Published value
    Not publishedvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 31 Dec 2028 · start not published
    Reference
    ocds-h6vhtk-04a6e7
  8. Estimated end · in 795 daysLinked to a framework or DPSPanel · 3 suppliers

    Smartphones / Mobile Phones / Tablets

    South Tyneside Council · Local authority · North East England

    Panel: Academia Ltd, BALLICOM LIMITED, BDR Limited · Last contest: 17 bids

    Framework for ICT Hardware and Peripherals - Lot 1 - Laptops/Hybrid Tablets/2 in1/ Desktop Monitors Lot 2 - Smartphones / Mobile Phones / Tablets Lot 3 - Peripherals (Keyboards/Mice/Cables/Headsets/Chargers/Backpacks) Lot 4 - Printer Toner …

    • Hardware
    Published value
    Not publishedvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 31 Dec 2028 · start not published
    Reference
    ocds-h6vhtk-04a6e7
  9. Estimated end · in 795 daysLinked to a framework or DPSPanel · 3 suppliers

    Peripherals (Keyboards/Mice/Cables/Headsets/Chargers/Backpacks)

    South Tyneside Council · Local authority · North East England

    Panel: Academia Ltd, BALLICOM LIMITED, Dynamic Technologies Europe Ltd · Last contest: 17 bids

    Framework for ICT Hardware and Peripherals - Lot 1 - Laptops/Hybrid Tablets/2 in1/ Desktop Monitors Lot 2 - Smartphones / Mobile Phones / Tablets Lot 3 - Peripherals (Keyboards/Mice/Cables/Headsets/Chargers/Backpacks) Lot 4 - Printer Toner …

    • Hardware
    Published value
    Not publishedvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 31 Dec 2028 · start not published
    Reference
    ocds-h6vhtk-04a6e7
  10. Estimated end · in 795 daysLinked to a framework or DPSPanel · 3 suppliers

    Printer Toner Cartridges/Desktop Printers

    South Tyneside Council · Local authority · North East England

    Panel: Academia Ltd, BALLICOM LIMITED, Thomas Stoner Supplies · Last contest: 14 bids

    Framework for ICT Hardware and Peripherals - Lot 1 - Laptops/Hybrid Tablets/2 in1/ Desktop Monitors Lot 2 - Smartphones / Mobile Phones / Tablets Lot 3 - Peripherals (Keyboards/Mice/Cables/Headsets/Chargers/Backpacks) Lot 4 - Printer Toner …

    • Hardware
    Published value
    Not publishedvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 31 Dec 2028 · start not published
    Reference
    ocds-h6vhtk-04a6e7
  11. Ends · in 795 days

    ES2478 - Food Waste Caddies

    Wiltshire Council · Local authority · South West England

    Incumbent: Straight Ltd/IPL Plastics UK Ltd

    The manufacturing and delivery of food waste caddies to every household in wiltshire. 7L and 23L caddies.

    Published value
    £1.7m
    Annual run-rate
    £692kpublished value ÷ term, exc. VAT
    Term
    9 Jul 2026 → 31 Dec 2028 · 2.5 yrs
    Reference
    ocds-h6vhtk-06c602
  12. Ends · in 799 days

    Fire Door Inspections, Repair and Replacement (Supply and Install) (Brunelcare)

    Brunelcare · Other public body · South West England

    Incumbent: BELL GROUP LTD · Last contest: awarded at the estimate

    Brunelcare wishes to appoint a Supplier for the supply and install of a planned programme of repairs and replacement to Fire Doors across the Bunelcare estate to ensure all properties remain compliant, whilst residents remain safe within th…

    Published value
    £1.4minc. VAT as published
    Annual run-rate
    £472kpublished value ÷ term, inc. VAT
    Term
    5 Jan 2026 → 4 Jan 2029 · 3 yrs
    Reference
    ocds-h6vhtk-059610
  13. Ends · in 806 daysExtension option · up to 11 Jan 2031

    Lot 1. Hand Tools

    Derbyshire Dales District Council · Local authority · East Midlands

    Incumbent: Electrical World Limited

    Following a competitive tender using the below threshold open tender procedure, Derbyshire Dales District Council (the Council) has concluded a contract to supply light plant and hand tools. The contract is being let as two lots: Lot 1 Hand…

    Published value
    £75k
    Annual run-rate
    £25kpublished value ÷ term, exc. VAT
    Term
    12 Jan 2026 → 11 Jan 2029 · 3 yrs · up to 11 Jan 2031 with extensions
    Reference
    ocds-h6vhtk-05665e
  14. Ends · in 806 daysExtension option · up to 11 Jan 2031

    Light Plant

    Derbyshire Dales District Council · Local authority · East Midlands

    Incumbent: Electrical World Limited

    Following a competitive tender using the below threshold open tender procedure, Derbyshire Dales District Council (the Council) has concluded a contract to supply light plant and hand tools. The contract is being let as two lots: Lot 1 Hand…

    Published value
    £75k
    Annual run-rate
    £25kpublished value ÷ term, exc. VAT
    Term
    12 Jan 2026 → 11 Jan 2029 · 3 yrs · up to 11 Jan 2031 with extensions
    Reference
    ocds-h6vhtk-05665e
  15. Ends · in 807 days

    UKRI-4811 Bi-Phase Line Assembly

    UK Research and Innovation · Central government

    Incumbent: Hyde Details Fabrications and Welding Ltd

    UKRI STFC has appointed a supplier to supply three Bi-Phase Line Assemblies as part of a complex system at CERN for UK's contribution to the LHC upgrade.

    Published value
    £109k
    Annual run-rate
    £34kpublished value ÷ term, exc. VAT
    Term
    21 Oct 2025 → 12 Jan 2029 · 3.3 yrs
    Reference
    ocds-h6vhtk-05d13e

When contracts end · Construction structures and materials
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

340 contracts and agreements end within 24 months, 505 in total · £2.6bn published GBP values end in the all future end dates, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months72
  2. 3–6 months67
  3. 6–12 months80
  4. 12–24 months121

Top sectors, all future end dates
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.