Retender radar: UK public contracts ending soon

Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the all future end dates

Showing 391–405

  1. Estimated end · in 2,551 days

    NSS10325 Container Unloader

    The Common Services Agency (more commonly known as NHS National Services Scotland) (NSS) · NHS & health · Scotland

    Incumbent: PIAB UK Ltd t/a TAWI UK · Last contest: 3 bids (3 SME)

    The requirement is for a container unloader that must meet the following criteria: Mobile battery powered device Fit inside 40/20ft containers Powered lifting/lowering platform for 1-2 people Powered conveyor attached to platform to lift/lo…

    • Container-handling equipment
    Published value
    £114k
    Annual run-rate
    —start date not published
    Term
    Estimated end 22 Oct 2033 · start not published
    Reference
    ocds-h6vhtk-05cca3
  2. Estimated end · in 2,584 days

    High Pressure Vitreous Freezer

    University Of Edinburgh · Education · Scotland

    Incumbent: SciQuip Ltd · Last contest: 3 bids (2 SME) · awarded 26% under the estimate

    The School of Physics and Astronomy has a requirement for a ‘High Pressure Vitreous Freezer’ (HPVF); this is a device that freezes samples to extreme low temperature at an exceptionally high rate to essentially ‘freeze a sample in time’. If…

    • Freezing equipment
    Published value
    £267k
    Annual run-rate
    —start date not published
    Term
    Estimated end 24 Nov 2033 · start not published
    Reference
    ocds-h6vhtk-054368
  3. Estimated end · in 2,613 days

    Food Waste Disposal Solution for University Hospital Wishaw and University Hospital Monklands

    NHS Lanarkshire · NHS & health · Scotland

    Incumbent: Bergmann Direct Ltd · Last contest: 3 bids (3 SME) · awarded 2% over the estimate

    A Food Waste Disposal technology solution is required to ensure that NHS Lanarkshire can meet the obligations set out in The Waste (Scotland) Regulations 2012.

    • Waste incinerators
    Published value
    £152k
    Annual run-rate
    —start date not published
    Term
    Estimated end 23 Dec 2033 · start not published
    Reference
    ocds-h6vhtk-0408c0
  4. Ends · in 2,652 daysExtension option · up to 31 Jan 2041

    MHE - Warehouse

    Yorkshire Purchasing Organisation · Other public body · Yorkshire and the Humber

    Incumbent: Toyota Material Handling UK Limited

    The contract is for the provision of a managed Material Handling Equipment (MHE) fleet and associated support services for YPO's warehouse and distribution operations. The requirement includes the long-term and short-term hire, management, …

    Published value
    £5.7m
    Annual run-rate
    £814kpublished value ÷ term, exc. VAT
    Term
    1 Feb 2027 → 31 Jan 2034 · 7 yrs · up to 31 Jan 2041 with extensions
    Reference
    ocds-h6vhtk-05e8c7
  5. Estimated end · in 2,669 daysCall-off

    Escalator Step Chains

    Transport for London · Other public body · Greater London

    Incumbent: Kettenwulf GMBH · Last contest: 3 bids (1 SME)

    This contract is a framework with three lots. Lot One - Escalator Step Chains; Lot Two - Escalator Wheels; and Lot Three - Escalator Auxiliary Chains. The framework agreements will have an initial term of five years with extension options u…

    • Parts of escalators
    Published value
    £10mvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 17 Feb 2034 · start not published
    Reference
    ocds-h6vhtk-04e3aa
  6. Estimated end · in 2,669 daysCall-off

    Escalator Auxiliary Chains

    Transport for London · Other public body · Greater London

    Incumbent: Precision Chains Limited · Last contest: 4 bids (1 SME)

    This contract is a framework with three lots. Lot One - Escalator Step Chains; Lot Two - Escalator Wheels; and Lot Three - Escalator Auxiliary Chains. The framework agreements will have an initial term of five years with extension options u…

    • Parts of escalators
    Published value
    £1.1mvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 17 Feb 2034 · start not published
    Reference
    ocds-h6vhtk-04e3aa
  7. Estimated end · in 2,694 days

    Fully Managed Vending Service

    NHS Wales Shared Services Partnership-Procurement Services (hosted by Velindre University NHS Trust) · NHS & health · Wales (Cymru)

    Incumbent: J.D.J. VENDING SERVICES LTD. · Last contest: 6 bids (6 SME)

    • Vending machines
    Published value
    £3.3m
    Annual run-rate
    —start date not published
    Term
    Estimated end 14 Mar 2034 · start not published
    Reference
    ocds-h6vhtk-04c7a1
  8. Estimated end · in 2,694 days

    Fully Managed Vending Service

    Aneurin Bevan University Health Board · Education · Wales (Cymru)

    Incumbent: J.D.J. VENDING SERVICES LTD. · Last contest: 6 bids (6 SME)

    ABUHB is seeking the services of an experienced vending service provider with proven capacity, capability, and commitment to provide a vending service for confectionary, snacks, cold drinks and hot drinks available 24 hours per day, 7 days …

    • Vending machines
    Published value
    £3.3m
    Annual run-rate
    —start date not published
    Term
    Estimated end 14 Mar 2034 · start not published
    Reference
    ocds-h6vhtk-04c7a1
  9. Estimated end · in 2,699 daysFramework record

    Odour Treatment & Control

    Scottish Water · Scotland

    Incumbent: ERG (Air Pollution Control) Ltd.

    • Mixer units
    Published value
    £6.0mpublished ceiling for the whole framework
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 19 Mar 2034 · start not published
    Reference
    ocds-h6vhtk-05aa54
  10. Estimated end · in 2,740 daysFramework record

    Rental of Lime Treatment Equipment for Sewage Cake at Allanfearn WWTW

    Scottish Water · Scotland

    Incumbent: SLUDGE TEK LIMITED

    • Sludge-processing equipment
    Published value
    £2.8mpublished ceiling for the whole framework
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 29 Apr 2034 · start not published
    Reference
    ocds-h6vhtk-05ce5e
  11. Ends · in 2,894 daysExtension option · up to 30 Sept 2038

    Term Service Contract for the Inspection, Testing, Repair and Maintenance of Cremators and Associated Ancillary Equipment at Lelley Fields Crematorium – Retender

    East Riding of Yorkshire Council · Local authority · Nationwide (UK), Yorkshire and the Humber

    Incumbent: Facultatieve Technologies Ltd · Last contest: awarded at the estimate

    Cremator repair and maintenance works are required under the Secretary of States Process Guidance Note PG5/2 (25) to ensure the continued running of the Lelley Fields Crematorium.

    Published value
    £3.6m
    Annual run-rate
    £450kpublished value ÷ term, exc. VAT
    Term
    1 Oct 2026 → 30 Sept 2034 · 8 yrs · up to 30 Sept 2038 with extensions
    Reference
    ocds-h6vhtk-06584f
  12. Ends · in 3,349 days

    Decontamination tent

    Bradford Teaching Hospitals NHS Foundation Trust · Central government

    Incumbent: NATIONWIDE SERVICE COMPANY LTD

    Decontamination shelter system

    Published value
    £39k
    Annual run-rate
    £4kpublished value ÷ term, exc. VAT
    Term
    30 Dec 2025 → 29 Dec 2035 · 10 yrs
    Reference
    ocds-h6vhtk-05fde2
  13. Ends · in 3,473 days

    HGV Lift

    Carmarthenshire County Council · Local authority · Wales (Cymru)

    Incumbent: STERTIL UK LTD

    Award of HGV Platform lift

    Published value
    £68k
    Annual run-rate
    £7kpublished value ÷ term, exc. VAT
    Term
    21 Jan 2026 → 1 May 2036 · 10.3 yrs
    Reference
    ocds-h6vhtk-05ac44
  14. Ends · in 3,560 days

    How Industrial Jet Wash System for City-Wide Cleansing Operations

    Worcester City Council · Local authority · West Midlands

    Incumbent: Pressure Washer Sales & Service

    Supply of a specialist commercial jet-washing system and associated attachments to support cleansing operations across Worcester city centre, car parks and other public realm locations. The equipment comprises: Deep cleaning system 200-bar …

    Published value
    £28k
    Annual run-rate
    £3kpublished value ÷ term, exc. VAT
    Term
    27 Jul 2026 → 27 Jul 2036 · 10 yrs
    Reference
    ocds-h6vhtk-06d83b
  15. Estimated end · in 3,561 days

    Supply of Commercial Laundry Equipment- Replacement Continuous Batch Washer

    NHS Lanarkshire · NHS & health · Scotland

    Incumbent: JENSEN UK LIMITED · Last contest: 3 bids (0 SME) · awarded 55% under the estimate

    1.1 NHS Lanarkshire Health Board, a statutory body constituted pursuant to the National Health Service (Scotland) Act 1978 (“the Board”), wishes to procure the replacement of the current 16 stage Continuous Batch Washer (CBW 16), situated i…

    • Laundry washing, dry-cleaning and drying machines
    Published value
    £467k
    Annual run-rate
    —start date not published
    Term
    Estimated end 28 Jul 2036 · start not published
    Reference
    ocds-h6vhtk-02cbcf

When contracts end · Industrial machinery
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

255 contracts and agreements end within 24 months, 407 in total · £532m published GBP values end in the all future end dates, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months70
  2. 3–6 months57
  3. 6–12 months46
  4. 12–24 months82

Top sectors, all future end dates
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.