Retender radar: UK public contracts ending soon

Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the all future end dates

Showing 391–405

  1. Ends · in 885 daysFramework recordPanel · 5 suppliers

    Hire of Portable Accommodation & Safe Storage Container Units

    Falkirk Council · Local authority · Scotland

    Panel: GAP Group Limited, Jarvie Plant Ltd, LOC Hire Ltd +2 more

    • Cabins
    Published value
    £1.1mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 Mar 2029 · start not published
    Reference
    ocds-h6vhtk-04b6bc
  2. Ends · in 885 days

    Supply of Heating and Plumbing Materials

    CHP · East of England

    Incumbent: UK Plumbing Supplies Limited · Last contest: 8 bids (1 SME)

    Supply of Heating and Plumbing Materials

    • Plumbing and heating materials
    Published value
    £1.1m
    Annual run-rate
    —start date not published
    Term
    Ends 31 Mar 2029 · start not published
    Reference
    ocds-h6vhtk-04cc95
  3. Ends · in 885 daysExtension option · up to 31 Mar 2030

    EBCT 433 Further competition under ESPO Framework Agreement 364_22 Lot 1 Seated Stairlifts

    Erewash Borough Council · Local authority · East Midlands

    Incumbent: Premier Mobility (UK) Ltd

    Erewash Borough Council is seeking to appoint a suitably qualified and experienced Supplier for the provision, installation, servicing, maintenance, and removal of stairlifts for eligible residents under the Disabled Facilities Grant (DFG) …

    Published value
    £446k
    Annual run-rate
    £151kpublished value ÷ term, exc. VAT
    Term
    20 Apr 2026 → 31 Mar 2029 · 2.9 yrs · up to 31 Mar 2030 with extensions
    Reference
    ocds-h6vhtk-069420
  4. Ends · in 885 days

    Portakabins - Berkeley Office Accomodation

    Nuclear Restoration Services Limited · Other public body

    Incumbent: Portakabin Site Accomodation

    Hire of Portakabins for Site accommodation at Berkeley Site. Consisting of • B46 – double storey modular building (office and welfare) near Stores • B46A – toilet block beside B46 • B107 – double storey modular welfare building near Scaffol…

    Published value
    £240k
    Annual run-rate
    £62kpublished value ÷ term, exc. VAT
    Term
    5 May 2025 → 31 Mar 2029 · 3.9 yrs
    Reference
    ocds-h6vhtk-05009d
  5. Estimated end · in 894 daysLinked to a framework or DPS

    Framework for the provision of PE Pipe & Fittings

    NORTHERN GAS NETWORKS LIMITED · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England

    Incumbent not published

    Framework for the supply of Polyethylene Pipe and Fittings compliant to the relevant standards.

    • Pipeline, piping, pipes, casing, tubing and related items
    Published value
    Not publishedvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 9 Apr 2029 · start not published
    Reference
    ocds-h6vhtk-0482de
  6. Ends · in 894 daysExtension option · up to 9 Apr 2031

    Fire Pressure Regulated Valves Maintenance Elizabeth Line

    Docklands Light Railway Limited · Other public body · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands

    Incumbent: Walter Frank & Sons Limited · Last contest: awarded 48% under the estimate

    There is a requirement to establish a new contract for the maintenance of the Pressure Regulating Valves (PRVs) that form part of the Elizabeth line fire suppression system. The current contract, awarded via Single Source to the manufacture…

    Published value
    £1.1m
    Annual run-rate
    £377kpublished value ÷ term, exc. VAT
    Term
    14 Apr 2026 → 9 Apr 2029 · 3 yrs · up to 9 Apr 2031 with extensions
    Reference
    ocds-h6vhtk-050d67
  7. Estimated end · in 895 daysPanel · 6 suppliers

    Lot D - Managed Services - Branch Solution

    Adra (Tai) Cyf · Wales (Cymru)

    Panel: Huws Gray Limited, LBS Builders Merchants Group, Robert Price +3 more · Last contest: 6 bids (1 SME)

    Adra is looking to establish a new Lot under their existing Ffram24 framework. This Lot will be a multi supplier Managed Service Lot, that will allow members to direct award. Ffram24 is open for use by a wide range of public sector bodies, …

    • Building materials
    Published value
    £500m
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 10 Apr 2029 · start not published
    Reference
    ocds-h6vhtk-04e5c6
  8. Estimated end · in 895 daysPanel · 6 suppliers

    Lot A - Managed Services - Return on Sales

    Adra (Tai) Cyf · Wales (Cymru)

    Panel: Huws Gray Limited, LBS Builders Merchants Group, Robert Price +3 more · Last contest: 6 bids (1 SME)

    Adra is looking to establish a new Lot under their existing Ffram24 framework. This Lot will be a multi supplier Managed Service Lot, that will allow members to direct award. Ffram24 is open for use by a wide range of public sector bodies, …

    • Building materials
    Published value
    £500m
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 10 Apr 2029 · start not published
    Reference
    ocds-h6vhtk-04e5c6
  9. Estimated end · in 895 daysPanel · 6 suppliers

    Lot B - Managed Services - Committed Spend

    Adra (Tai) Cyf · Wales (Cymru)

    Panel: Huws Gray Limited, LBS Builders Merchants Group, Robert Price +3 more · Last contest: 6 bids (1 SME)

    Adra is looking to establish a new Lot under their existing Ffram24 framework. This Lot will be a multi supplier Managed Service Lot, that will allow members to direct award. Ffram24 is open for use by a wide range of public sector bodies, …

    • Building materials
    Published value
    £500m
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 10 Apr 2029 · start not published
    Reference
    ocds-h6vhtk-04e5c6
  10. Estimated end · in 895 daysPanel · 6 suppliers

    Lot C - Managed Services - Management fee

    Adra (Tai) Cyf · Wales (Cymru)

    Panel: Huws Gray Limited, LBS Builders Merchants Group, Robert Price +3 more · Last contest: 6 bids (1 SME)

    Adra is looking to establish a new Lot under their existing Ffram24 framework. This Lot will be a multi supplier Managed Service Lot, that will allow members to direct award. Ffram24 is open for use by a wide range of public sector bodies, …

    • Building materials
    Published value
    £500m
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 10 Apr 2029 · start not published
    Reference
    ocds-h6vhtk-04e5c6
  11. Estimated end · in 902 daysFramework recordPanel · 4 suppliers

    Civils Materials and Hand Tools Framework_25

    Leicestershire County Council · Local authority · East Midlands

    Panel: Cromwell Group Holdings, Denham Procurement & Sourcing Solutions Ltd, Huws Gray Limited +1 more

    • Construction materials and associated items
    Published value
    £3.0mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 17 Apr 2029 · start not published
    Reference
    ocds-h6vhtk-0456c0
  12. Estimated end · in 902 days

    PLACE701H Supply of Castings

    Derbyshire County Council · Local authority · East Midlands

    Incumbent: M Markovitz Ltd · Last contest: 5 bids (2 SME) · awarded at the estimate

    Contract for the supply of castings including inspection/drain covers and frames as well as gully grates and frames, for a maximum period of four years commencing June 2025.

    • Manhole frames
    Published value
    £320k
    Annual run-rate
    —start date not published
    Term
    Estimated end 17 Apr 2029 · start not published
    Reference
    ocds-h6vhtk-04e324
  13. Estimated end · in 905 days

    Supply of Double-Glazed Sealed Units

    Tai Tarian Ltd · Wales (Cymru)

    Incumbent: Glamorgan Glazing · Last contest: 1 bid (1 SME) · awarded 39% under the estimate

    We are seeking to issue a Contract for the Supply of Double Glazed Sealed Units to our PVCu Production Factory. Tai Tarian is one of the largest social landlords in Wales and have responsibility for over 9,000 homes across the Neath Port Ta…

    • Double-glazed units
    Published value
    £367k
    Annual run-rate
    —start date not published
    Term
    Estimated end 20 Apr 2029 · start not published
    Reference
    ocds-h6vhtk-044e66
  14. Ends · in 906 daysFramework record

    Framework for the Manufacture, Supply and Installation of Bespoke Lock Gates for Basingstoke Canal

    Hampshire County Council · Local authority · South East England

    Incumbent: The Green Oak Carpentry Co. Limited

    • Lock gates
    Published value
    £336kpublished ceiling for the whole framework
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Ends 21 Apr 2029 · start not published
    Reference
    ocds-h6vhtk-0482cb
  15. Ends · in 911 daysExtension option · up to 26 Apr 2031Buyer plans to re-tender 1 Sept 2031

    STH Building Fire Alarm Systems, Servicing and Maintenance

    Sheffield Teaching Hospitals NHS Foundation Trust · Central government · Nationwide (UK)

    Incumbent: Albion Detection Systems Ltd

    Building Fire Alarm Systems, Servicing and Maintenance For Sheffield Teaching Hospitals NHS Foundation Trust

    Published value
    £242k
    Annual run-rate
    £81kpublished value ÷ term, exc. VAT
    Term
    27 Apr 2026 → 26 Apr 2029 · 3 yrs · up to 26 Apr 2031 with extensions
    Reference
    ocds-h6vhtk-05870c

When contracts end · Construction structures and materials
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

340 contracts and agreements end within 24 months, 505 in total · £2.6bn published GBP values end in the all future end dates, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months72
  2. 3–6 months67
  3. 6–12 months80
  4. 12–24 months121

Top sectors, all future end dates
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.