Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the all future end dates
Showing 406–420
- Estimated end · in 913 daysFramework recordPanel · 7 suppliers
Supply and Delivery of Bitumen and Associated Products
Scotland Excel · Scotland
Panel: Colas Limited, Instarmac Group plc, James A. Jobling and Company Limited +4 more
- Published value
- £60mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 28 Apr 2029 · start not published
- Reference
ocds-h6vhtk-045426
- Ends · in 915 days
Manufactured Products Agile Spares
Sellafield Limited · Other public body · North West England
Incumbent: Bendall's Engineering Limited · Last contest: 2 bids
Manufactured Products Agile Spares (MPAS)
- Published value
- £30m
- Annual run-rate
- —start date not published
- Term
- Ends 30 Apr 2029 · start not published
- Reference
ocds-h6vhtk-046a41
- Ends · in 915 days
Manufactured Products Agile Spares
Sellafield Limited · Other public body · North West England
Incumbent: West Cumberland Engineering Ltd · Last contest: 2 bids
Manufactured Products Agile Spares (MPAS)
- Published value
- £30m
- Annual run-rate
- —start date not published
- Term
- Ends 30 Apr 2029 · start not published
- Reference
ocds-h6vhtk-046a41
- Ends · in 915 days
Supply and Delivery of Home Decorating Packs
Gosport Borough Council (GBC) · Local authority · Nationwide (UK)
Incumbent: J.P McDougall and Co Ltd Trading as Dulux Decorator Centre
To provide home decorating packs to tenants moving into Gosport Borough Council Housing properties.
- Published value
- £30k
- Annual run-rate
- £10kpublished value ÷ term, exc. VAT
- Term
- 1 May 2026 → 30 Apr 2029 · 3 yrs
- Reference
ocds-h6vhtk-068c0a
- Estimated end · in 921 daysFramework recordPanel · 16 suppliers
Design, Supply and Installation of Permanent and Temporary Modular Buildings
LHC Procurement Group · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Panel: Elliott Group Limited, Explore Modular Ltd, Integra Buildings Ltd +13 more
- Published value
- £150mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 6 May 2029 · start not published
- Reference
ocds-h6vhtk-046f54
- Ends · in 925 daysExtension option · up to 10 May 2031
Provision of Decorating Materials and the associated Decorating Cards/Vouchers
Gateshead Council · Education · North East England
Incumbent: PPG ARCHITECTURAL COATINGS UK LIMITED
This contract was awarded via the Pfh (Procurement for Housing) framework - Lot 1 Retail Decorative Solutions. The contract supports the Council's Decoration Allowance Scheme, which helps residents redecorate homes affected by Council impro…
- Published value
- £80k
- Annual run-rate
- £27kpublished value ÷ term, exc. VAT
- Term
- 11 May 2026 → 10 May 2029 · 3 yrs · up to 10 May 2031 with extensions
- Reference
ocds-h6vhtk-07843a
- Estimated end · in 934 days
Station End Equipment (Hardware, Support and Installation)
Norfolk County Council · Local authority · East of England
Incumbent: Multitone Electronics Plc · Last contest: 2 bids (1 SME)
Norfolk County Council and Hertfordshire County Council have awarded a contract to procure station end hardware, support and potentially installation for their respective fire and rescue services.The procurement was led by Norfolk County Co…
- Published value
- £1.5m
- Annual run-rate
- —start date not published
- Term
- Estimated end 19 May 2029 · start not published
- Reference
ocds-h6vhtk-043b86
- Estimated end · in 941 days
Electrical Materials
Connexus Homes Limited · West Midlands
Incumbent: City Electrical Factors Limited · Last contest: 2 bids
The supply of materials under Lot 1 - Plumbing, Heating & Gas Materials - Lot 2 - Electrical Materials Lot 3 - Building Materials, of the PfH Material Supply and Associated Services Framework Agreement.
- Published value
- £1.2m
- Annual run-rate
- —start date not published
- Term
- Estimated end 26 May 2029 · start not published
- Reference
ocds-h6vhtk-06bd2e
- Estimated end · in 948 days
Building Materials
Connexus Homes Limited · West Midlands
Incumbent: Travis Perkins Trading Company Limited · Last contest: 2 bids
The supply of materials under Lot 1 - Plumbing, Heating & Gas Materials - Lot 2 - Electrical Materials Lot 3 - Building Materials, of the PfH Material Supply and Associated Services Framework Agreement.
- Published value
- £2.5m
- Annual run-rate
- —start date not published
- Term
- Estimated end 2 Jun 2029 · start not published
- Reference
ocds-h6vhtk-06bd2e
- Ends · in 948 daysFramework recordPanel · 8 suppliers
Roofing Systems
LHC Procurement Group · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Panel: Alumasc Building Products Ltd, Axter Ltd, Bauder Ltd +5 more
This framework covers the geographical area of England and has been procured on behalf of: Consortium Procurement Construction (CPC) Midlands, London and South East (LHC) South-West Procurement Alliance (SWPA) LHC has also awarded this fram…
- Published value
- £26mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Ends 2 Jun 2029 · start not published
- Reference
ocds-h6vhtk-0451d1
- Ends · in 948 daysFramework recordPanel · 6 suppliers
Roofing Systems
LHC Procurement Group for the Scottish Procurement Alliance (SPA) · Nationwide (UK), Scotland
Panel: Alumasc Building Products Ltd, Bauder Ltd, IKO PLC +3 more
- Published value
- £5.0mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Ends 2 Jun 2029 · start not published
- Reference
ocds-h6vhtk-0451db
- Ends · in 948 daysFramework recordPanel · 9 suppliers
Roofing Systems
LHC Procurement Group · Nationwide (UK), Wales (Cymru)
Panel: ALCHIMICA BUILDING CHEMICALS LTD, Alumasc Building Products Ltd, Axter Ltd +6 more
- Published value
- £1.0mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Ends 2 Jun 2029 · start not published
- Reference
ocds-h6vhtk-0451e2
- Estimated end · in 955 days
Plumbing, Heating and Gas Materials
Connexus Homes Limited · West Midlands
Incumbent: Wolseley UK Limited · Last contest: 4 bids
The supply of materials under Lot 1 - Plumbing, Heating & Gas Materials - Lot 2 - Electrical Materials Lot 3 - Building Materials, of the PfH Material Supply and Associated Services Framework Agreement.
- Published value
- £1.3m
- Annual run-rate
- —start date not published
- Term
- Estimated end 9 Jun 2029 · start not published
- Reference
ocds-h6vhtk-06bd2e
- Ends · in 961 daysExtension option · up to 15 Jun 2031
Weapon Cabinets
Civil Nuclear Police Authority (CNPA) / Civil Nuclear Constabulary (CNC) · Police & fire · Nationwide (UK)
Incumbent: Municipal Security Limited
Supply, delivery and fitting of Weapon cabinets for all CNC locations
- Published value
- £160k
- Annual run-rate
- £53kpublished value ÷ term, exc. VAT
- Term
- 16 Jun 2026 → 15 Jun 2029 · 3 yrs · up to 15 Jun 2031 with extensions
- Reference
ocds-h6vhtk-06b57e
- Estimated end · in 969 daysDynamic purchasing system recordPanel · 5 suppliers
BSH/HRA/Joinery Timber Supplies - DPS
Bristol City Council · Local authority · Nationwide (UK)
Panel: J Scadding & Son Limited, J Scadding & sons Ltd, New World Timber limited +2 more
- Published value
- £66klargest agreement; total ceiling not published
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 23 Jun 2029 · start not published
- Reference
ocds-h6vhtk-036859
When contracts end · Construction structures and materials i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
340 contracts and agreements end within 24 months, 505 in total · £2.6bn published GBP values end in the all future end dates, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, all future end dates i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services9,87279Business services: law, marketing, consulting5,54760Transport services (except waste transport)4,94245Construction work4,73450Repair and maintenance services3,69972IT services: consulting, software, internet3,48771Architectural, construction, engineering3,30480Education and training services2,867
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.