Expiring UK Public Contracts: Retender Radar
Explore UK public contracts by expiry date, with buyers, incumbent suppliers and extension options. Estimated end dates are labelled; expiry does not guarantee a new tender.
Contracts ending in the all future end dates
Showing 811–825
- Ends · in 152 days
Service of VS200
ANIMAL AND PLANT HEALTH AGENCY (Defra Network eTendering Portal) · Central government · South East England
Incumbent: EVIDENT EUROPE GMBH - UK BRANCH
This service contract will provide Preventative and Corrective Maintenance services for the existing equipment, which can only be provided by the Original Equipment Manufacturer (OEM). The VS200 Slide Scanner and Fluorescence Module rely on…
- Published value
- £14k
- Annual run-rate
- £8kpublished value ÷ term, exc. VAT
- Term
- 22 Jul 2025 → 31 Mar 2027 · 1.7 yrs
- Reference
ocds-h6vhtk-056348
- Ends · in 152 days
Beach Street Regeneration - Cost Consultant Services
Canterbury City Council · Local authority
Incumbent: Costplan Services (South East) Ltd
Canterbury City Council wishes to select and appoint Costplan Services (South East) Ltd for the provision of Cost Consultant Services - Beach Street Regeneration and to submit a tender to meet the Council's requirements. The specific requir…
- Published value
- £14k
- Annual run-rate
- £9kpublished value ÷ term, exc. VAT
- Term
- 8 Sept 2025 → 31 Mar 2027 · 1.6 yrs
- Reference
ocds-h6vhtk-05a2f0
- Ends · in 152 days
ICH-WEH Reception Refurbishment – Structural Engineering Services (RIBA Stages 3
Imperial College Healthcare NHS Trust · Central government
Incumbent: Wareham & Associates Ltd
Professional structural engineering services for the refurbishment of the WEH ground floor reception area, including design of a new steel platform to support the AHU after the original location was deemed unsuitable due to a UKPN substatio…
- Published value
- £14k
- Annual run-rate
- £15kpublished value ÷ term, exc. VAT
- Term
- 1 May 2026 → 31 Mar 2027 · 11 months
- Reference
ocds-h6vhtk-069826
- Ends · in 152 days
DDaT26234 - Repository Hosting and Support
UK Research and Innovation · Central government · Nationwide (UK)
Incumbent: ECS Partners Limited
***** THIS IS A CONTRACT DETAILS NOTICE, NOT A CALL FOR COMPETITION ***** This procurement is being concluded without competition due to an absence of competition for technical reasons, only a particular supplier can supply the goods, servi…
- Published value
- £13k
- Annual run-rate
- £14kpublished value ÷ term, exc. VAT
- Term
- 21 Apr 2026 → 31 Mar 2027 · 11 months
- Reference
ocds-h6vhtk-068e4e
- Ends · in 152 days
Cost Advisor - Antenatal (MPH)
Somerset NHS Foundation Trust · Central government · South West England
Incumbent: Kendall Kingscott Limited
The appointment of a project cost advisor for the Antenatal relocation project.
- Published value
- £13k
- Annual run-rate
- £18kpublished value ÷ term, exc. VAT
- Term
- 17 Jul 2026 → 31 Mar 2027 · 8 months
- Reference
ocds-h6vhtk-06cd6f
- Ends · in 152 days
M61 Vegetation Clearance – Network Rail BAPA
National Highways Limited · Central government
Incumbent: Network Rail
National Highways has entered into a Basic Asset Protection Agreement (BAPA) with Network Rail Infrastructure Limited in relation to vegetation clearance works adjacent to the M61. The agreement covers Network Rail asset protection services…
- Published value
- £13k
- Annual run-rate
- £24kpublished value ÷ term, exc. VAT
- Term
- 15 Sept 2026 → 31 Mar 2027 · 7 months
- Reference
ocds-h6vhtk-06fa70
- Ends · in 152 days
Authorising Engineer Services (Lifts)
Mersey and West Lancashire Teaching Hospital NHS Trust · Central government
Incumbent: I4 TECHNICAL ELEVATOR CONSULTING LTD
To provide Authorising Engineer (Lifts) duties for Southport & Ormskirk Hospitals from 01/04/2026 - 31/03/2027. Duties to include: Maintenance Quality Audits Operational Management Assessment Quarterly Meetings Maintenance Quality Items rec…
- Published value
- £12k
- Annual run-rate
- £13kpublished value ÷ term, exc. VAT
- Term
- 23 Apr 2026 → 31 Mar 2027 · 11 months
- Reference
ocds-h6vhtk-06945a
- Ends · in 152 days
Authorising Engineer (Decontamination) Services
Mersey and West Lancashire Teaching Hospital NHS Trust · Central government
Incumbent: THEATRE AND ENDOSCOPY SERVICE TECHNICIANS LIMITED
Quarterly and Annual report sign off, decontamination meetings and telephone support for Southport and Ormskirk District General Hospital sites. From 01/07/26 - 31/03/27.
- Published value
- £12k
- Annual run-rate
- £17kpublished value ÷ term, exc. VAT
- Term
- 23 Jul 2026 → 31 Mar 2027 · 8 months
- Reference
ocds-h6vhtk-06d882
- Ends · in 152 days
Asbestos Reinspection
Royal United Hospitals Bath NHS Foundation Trust · Central government
Incumbent: Environtec Limited
The contractor is to provide provision of a single year of asbestos reinspections at the RUH, Combe Park Site. This act is in line with the Trust responsibility under Control of Asbestos regulation 2012. The Trust is already out of the peri…
- Published value
- £12k
- Annual run-rate
- £13kpublished value ÷ term, exc. VAT
- Term
- 1 May 2026 → 31 Mar 2027 · 11 months
- Reference
ocds-h6vhtk-06ac1d
- Ends · in 152 days
Manor Farm. EA / CA / QS Role.
Gloucestershire County Council- · Local authority · South West England
Incumbent: Adams Fletcher Limited t/a Adams Fletcher & Partners
EA / CA / QS to support GCC in the refurbishment and remodelling of a Grade II Listed Farm house.
- Published value
- £12k
- Annual run-rate
- £11kpublished value ÷ term, exc. VAT
- Term
- 13 Mar 2026 → 31 Mar 2027 · 1.1 yrs
- Reference
ocds-h6vhtk-06691f
- Ends · in 152 days
Mortuary Improvements
Leeds Teaching Hospitals NHS Trust · Central government
Incumbent: Drees & Sommer UK
Principal Designer and CDM Advisor
- Published value
- £11k
- Annual run-rate
- £18kpublished value ÷ term, exc. VAT
- Term
- 1 Sept 2026 → 31 Mar 2027 · 7 months
- Reference
ocds-h6vhtk-0774ed
- Ends · in 152 days
Lab quality testing for EQA 2026/2027
Mersey and West Lancashire Teaching Hospital NHS Trust · Central government · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: LabQuality OY
Lab quality testing for EQA 2026/2027
- Published value
- £11k
- Annual run-rate
- £11kpublished value ÷ term, exc. VAT
- Term
- 1 Apr 2026 → 31 Mar 2027 · 1 yr
- Reference
ocds-h6vhtk-064e7b
- Ends · in 152 days
RSA3 - Edmonton Green QN Stage 1 - School Street
London Borough of Enfield · Local authority · Greater London
Incumbent: Mayer Brown
Road Safety Audit Stage 3 Edmonton Green QN Stage 1 - School Street
- Published value
- £2k
- Annual run-rate
- £3kpublished value ÷ term, exc. VAT
- Term
- 19 May 2026 → 31 Mar 2027 · 10 months
- Reference
ocds-h6vhtk-069ab6
- Ends · in 152 daysFramework record
Electrical Inspection & Test
SSE PLC · Nationwide (UK)
Incumbent: Omega Red Group
- Published value
- Not publishedlargest agreement; total ceiling not published
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Ends 31 Mar 2027 · start not published
- Reference
ocds-h6vhtk-04081a
- Estimated end · in 153 daysFramework recordPanel · 2 suppliers
Plumbing Services - UHI Moray
UHI Moray · Scotland
Panel: Heatcare Oil & Gas Ltd, McDonald and Munro Ltd
- Published value
- £115klargest agreement; total ceiling not published
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 1 Apr 2027 · start not published
- Reference
ocds-h6vhtk-04dcbc
When contracts end · Architectural, construction, engineering i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
2,318 contracts and agreements end within 24 months, 3,332 in total · £5.5bn published GBP values end in the all future end dates, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, all future end dates i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services9,90379Business services: law, marketing, consulting5,59160Transport services (except waste transport)4,97445Construction work4,77350Repair and maintenance services3,70972IT services: consulting, software, internet3,51771Architectural, construction, engineering3,33280Education and training services2,891
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.