Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the all future end dates
Showing 1–10
- Ends · in 4 days
Humber Bridge Barrier Safety Improvement Scheme
Hull City Council · Local authority · Yorkshire and the Humber
Incumbent: Pell Frischmann Consultants Ltd · Last contest: 3 bids · awarded 20% under the estimate
Hull City Council (The Authority) on behalf of the Humber Bridge Board (HBB) has appointed Pell Frischmann Consultants Ltd to produce a detailed design of the safety barrier improvement scheme for the enhancement the parapets and oversee it…
- Published value
- £160k
- Annual run-rate
- —start date not published
- Term
- Ends 30 Oct 2026 · start not published
- Reference
ocds-h6vhtk-047b8b
- Ends · in 5 days
Provision of Inspection & Quality Assurance Services
Sellafield Limited · Other public body · Nationwide (UK), North West England
Incumbent: Stork · Last contest: 5 bids (0 SME) · awarded 5% under the estimate
Inspection and Quality Assurance Services
- Published value
- £34m
- Annual run-rate
- —start date not published
- Term
- Ends 31 Oct 2026 · start not published
- Reference
ocds-h6vhtk-034631
- Ends · in 5 days
OPSS Testing of Controlled Door Closing Devices
Department for Business & Trade · Central government · Nationwide (UK)
Incumbent: SGS United Kingdom Limited · Last contest: 2 bids
- Published value
- £400k
- Annual run-rate
- —start date not published
- Term
- Ends 31 Oct 2026 · start not published
- Reference
ocds-h6vhtk-0456a7
- Ends · in 5 days
OPSS Testing of Controlled Door Closing Devices
Department for Business & Trade · Central government · Nationwide (UK)
Incumbent: Northwest Laboratories Limited · Last contest: 2 bids
Bidders were invited to tender for Project 3221 - OPSS Testing of Controlled Door Closing Devices. The requirement was for routine standardised testing of door closers. The applicable tests, setups and parameters for the products are specif…
- Published value
- £200k
- Annual run-rate
- —start date not published
- Term
- Ends 31 Oct 2026 · start not published
- Reference
ocds-h6vhtk-0456a7
- Estimated end · in 5 days
Environmental Impact Assessments & Associated Consents Procedure Management in relation to the Criterion Quay Flow Development
Milford Haven Port Authority · Wales (Cymru)
Incumbent: HaskoningDHV UK Limited
The Criterion Quay Flow Development is envisioned to support the deployment of floating offshore wind power generating infrastructure in the Celtic Sea. Delivery of this project will fortify the Pembroke Dock Marine project currently in dev…
- Published value
- Not published
- Annual run-rate
- —value not published
- Term
- Estimated end 1 Nov 2026 · start not published
- Reference
ocds-h6vhtk-03ecbb
- Estimated end · in 6 daysFramework recordPanel · 3 suppliers
Multi-supplier Framework Agreement for proposed utility diversions and/or protection audit and advice services
Transport Scotland · Scotland
Panel: Allen Gordon, Long O Donnell Associates Limited, Mott MacDonald
- Published value
- £1.8mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 2 Nov 2026 · start not published
- Reference
ocds-h6vhtk-02eee5
- Estimated end · in 8 daysFramework recordPanel · 3 suppliers
Highways and Transport Services Framework
London Borough of Lewisham · Local authority · Greater London
Panel: Norman Rourke, Project Centre Limited, Waterman Infrastructure & Environment Ltd
This is an award notice and this opportunity is now closed. This framework will cover Transport and Engineering services. Three suppliers have been awarded onto the framework.
- Published value
- £2.0mlargest agreement; total ceiling not published
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 4 Nov 2026 · start not published
- Reference
ocds-h6vhtk-031fdf
- Estimated end · in 8 days
Estates: Cost Manager for Madras New College Building
University of St Andrews · Education · Scotland
Incumbent: CURRIE and BROWN UK LIMITED · Last contest: 5 bids (5 SME)
Cost Manager Services for Madras New College Building at the University of St Andrews.
- Published value
- £451k
- Annual run-rate
- —start date not published
- Term
- Estimated end 4 Nov 2026 · start not published
- Reference
ocds-h6vhtk-03dd37
- Estimated end · in 8 days
TD1788 - Fire Risk Assessment Services
Derby City Council · Local authority · East Midlands
Incumbent: International Fire Consultants Limited · Last contest: 10 bids · awarded at the estimate
Derby City Council is undertaking this procurement to establish a contract for fire risk assessment services.
- Published value
- £195k
- Annual run-rate
- —start date not published
- Term
- Estimated end 4 Nov 2026 · start not published
- Reference
ocds-h6vhtk-02e173
- Estimated end · in 9 days
Health and Safety Management Software System
Abri · Nationwide (UK)
Incumbent: Evotix · Last contest: 4 bids (3 SME) · awarded at the estimate
We are seeking provision of a health and safety management software system to support our health and safety management processes in line with the ISO45001 standard. The system is to be an enterprise-wide solution of modular design and scala…
- Published value
- £195k
- Annual run-rate
- —start date not published
- Term
- Estimated end 5 Nov 2026 · start not published
- Reference
ocds-h6vhtk-02d4ad
When contracts end · Architectural, construction, engineering i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
937 contracts and agreements end within 24 months, 1,493 in total · £4.3bn published GBP values end in the all future end dates, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, all future end dates i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services7,31960Transport services (except waste transport)3,15045Construction work2,43679Business services: law, marketing, consulting1,98950Repair and maintenance services1,73990Sewage, refuse, cleaning and environmental1,62171Architectural, construction, engineering1,49333Medical equipments, pharmaceuticals1,359
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.