Retender radar: UK public contracts ending soon

Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the next 12 months

Page 15 · 15 contracts on this page · more available

1,000+ contracts

  1. Ends · in 44 daysLinked to a framework or DPS

    Supply of Copper Sulphate Solution

    NHS Blood and Transplant · NHS & health · Nationwide (UK), South West England

    Incumbent: VWR International Ltd · Last contest: 1 bid

    • Blood-testing reagents
    Published value
    £700kvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Ends 10 Dec 2026 · start not published
    Reference
    ocds-h6vhtk-02b6b4
  2. Ends · in 45 daysFramework recordPanel · 19 suppliers

    Development Consultants Framework

    Beyond Housing Limited · Nationwide (UK)

    Panel: ARCUS CONSULTING LLP, Acanthus WSP Architects Limited, Adept Consulting Engineers +16 more

    • Building consultancy services
    Published value
    £1.6mlargest agreement; total ceiling not published
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 11 Dec 2026 · start not published
    Reference
    ocds-h6vhtk-03754d
  3. Ends · in 45 daysLinked to a framework or DPSExtension option · up to 10 Dec 2027

    C392282 VPR Data Guidance

    NHS England · Central government · Nationwide (UK)

    Incumbent: Royal Free London NHS Foundation Trust

    For two complementary national pieces of guidance, which are Phase 1 of a wider national strategy. Firstly, the national VPR Reporting Data Framework guidance would standardise how incidents of violence and abuse are recorded and reported a…

    Published value
    £85kvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    12 Nov 2025 → 11 Dec 2026 · 1.1 yrs · up to 10 Dec 2027 with extensions
    Reference
    ocds-h6vhtk-058e08
  4. Estimated end · in 46 daysFramework recordPanel · 9 suppliers

    TC976 NORTH WEST CONSTRUSTION HUB – SMALL WORKS CONSTRUCTION FRAMEWORK (2023 TO 2026)

    Manchester City Council · Local authority · North West England

    Panel: CITY BUILD MANCHESTER LTD, F Parkinson Ltd, Greenmount Projects Ltd +6 more

    The NWCH will create a Small Works Framework Agreement through which participating Public Bodies will procure Building Construction Works projects via a group of contractors which qualify through the tender process to be appointed to the Fr…

    • Construction work
    Published value
    £60mlargest agreement; total ceiling not published
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 12 Dec 2026 · start not published
    Reference
    ocds-h6vhtk-03d609
  5. Estimated end · in 46 daysFramework record

    Textiles Bring Bank Collection Service - Multi-Borough Framework

    London Borough of Lewisham · Local authority · Greater London

    Incumbent: LMB Textiles Ltd

    Textiles Bring Bank Collection Service - Multi-Borough Framework

    • Leather and textile fabrics, plastic and rubber materials
    Published value
    £1.3mlargest agreement; total ceiling not published
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 12 Dec 2026 · start not published
    Reference
    ocds-h6vhtk-02cfaf
  6. Estimated end · in 46 daysFramework recordPanel · 8 suppliers

    Birmingham Virtual School Tuition Framework Agreement

    Birmingham City Council · Local authority · Nationwide (UK)

    Panel: Academy21 Limited, Equal Education, Five Rivers Child Care Ltd +5 more

    • Tutorial services
    Published value
    £500kpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 12 Dec 2026 · start not published
    Reference
    ocds-h6vhtk-032fb0
  7. Estimated end · in 47 daysFramework recordPanel · 2 suppliers

    Repairs, Maintenance and Associated Services Framework

    Torus62Ltd · North West England

    Panel: Housing Maintenance Solutions Ltd (HMS), Sovini Property Services

    • Repair and maintenance services
    Published value
    £1.2bnpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 13 Dec 2026 · start not published
    Reference
    ocds-h6vhtk-031b57
  8. Estimated end · in 47 daysFramework recordPanel · 53 suppliers

    Medical Healthcare Furniture and Equipment 2025

    NHS Supply Chain operated by North of England Commercial Procurement Collaborative (who are hosted by Leeds and York Partnership NHS Foundation Trust) acting on behalf of Supply Chain Coordination Ltd · NHS & health · Nationwide (UK)

    Panel: AC Cossor & Son (Surgical) Ltd, Accora Ltd, Acime UK Ltd +50 more

    • Medical furniture
    Published value
    £113mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 13 Dec 2026 · start not published
    Reference
    ocds-h6vhtk-046f19
  9. Estimated end · in 47 daysFramework recordPanel · 7 suppliers

    Supply of PPE (Personal Protective Equipment) and Safety Workwear Y23033

    Kent County Council · Local authority · Nationwide (UK)

    Panel: Global Health and Safety Ltd., Healthy Bean Ltd, Protective Wear Supplies +4 more

    • Medical equipments, pharmaceuticals and personal care products
    Published value
    £50mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 13 Dec 2026 · start not published
    Reference
    ocds-h6vhtk-036765
  10. Estimated end · in 47 daysFramework recordPanel · 4 suppliers

    Supply of Signs and Associated Services Y23026

    Kent County Council · Local authority · Nationwide (UK)

    Panel: ALLSIGNS INTERNATIONAL LIMITED, DMA Signs Limited, MS-Group t/a Morgans Consult +1 more

    • Signs and illuminated signs

    Re-procurement plannedSigns and Associated Services · tender expected

    Published value
    £20mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 13 Dec 2026 · start not published
    Reference
    ocds-h6vhtk-036b66
  11. Estimated end · in 47 daysFramework recordPanel · 10 suppliers

    NP811/23 Lift Maintenance Services

    The Common Services Agency (more commonly known as NHS National Services Scotland) (NSS) · NHS & health · Scotland

    Panel: Caltech Lifts Limited, Classic Lifts (Scotland) Ltd, Jackson Lifts Group +7 more

    • Lift-maintenance services
    Published value
    £9.0mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 13 Dec 2026 · start not published
    Reference
    ocds-h6vhtk-03bcc4
  12. Estimated end · in 47 daysLinked to a framework or DPSPanel · 3 suppliers

    Framework for Supply of Front and Back Composite Doors

    Legal, Democratic and Business Intelligence, Swansea Council, · Local authority · Wales (Cymru)

    Panel: IG Doors Limited, SOLAR WINDOWS LIMITED, Sovereign Group Limited · Last contest: 5 bids (4 SME)

    The nature of the works/service provided by Swansea Council in particular Building Services means we are required to provide a guaranteed service level to the tenants of properties held within our City-Wide Housing Stock and its Public Buil…

    • Doors
    Published value
    £0value of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 13 Dec 2026 · start not published
    Reference
    ocds-h6vhtk-049bde
  13. Estimated end · in 48 daysFramework recordPanel · 30 suppliers

    South East & Mid Wales Highways & Civil Engineering Framework (SEWH4)

    Cardiff Council · Local authority · Wales (Cymru)

    Panel: ALUN GRIFFITHS (CONTRACTORS) LIMITED, Amelio Group, Andrew Scott Limited +27 more

    • Works for complete or part construction and civil engineering work
    Published value
    £160mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 14 Dec 2026 · start not published
    Reference
    ocds-h6vhtk-029434
  14. Estimated end · in 48 daysFramework recordPanel · 30 suppliers

    Framework Agreement for the Supply of Respiratory Products and Services

    HealthTrust Europe LLP (HTE) acting as agent for Mid and South Essex NHS Foundation Trust ("MSE") · NHS & health · Nationwide (UK)

    Panel: ACURABLE LIMITED, Ambu Ltd, Aquilant Ltd +27 more

    • Gas-therapy and respiratory devices
    Published value
    £80mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 14 Dec 2026 · start not published
    Reference
    ocds-h6vhtk-04b41b
  15. Ends · in 48 daysFramework record

    Provision of Accident Repairs to Police Vehicles

    The Police and Crime Commissioner for Northumbria · Police & fire · North East England

    Incumbent: cf motoring services ltd

    Published value
    £282klargest agreement; total ceiling not published
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    15 Dec 2025 → 14 Dec 2026 · 1 yr
    Reference
    ocds-h6vhtk-05eb66
How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.