Retender radar: UK public contracts ending soon

Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the next 12 months

Showing 51–75

  1. Ends · in 65 days

    HMP Send - Outdoor Meeting Pods P2

    Ministry of Justice · Central government

    Incumbent: THE MEETING POD COMPANY LTD

    Supply and install of three outdoor meeting pods at HMP Send.

    Published value
    £87k
    Annual run-rate
    —term under 6 months
    Term
    24 Aug 2026 → 31 Dec 2026 · 4 months
    Reference
    ocds-h6vhtk-06eb23
  2. Ends · in 65 days

    Installation of Cemetery Plinths

    Slough Borough Council · Local authority · South East England

    Incumbent: Falcon Surfacing ltd

    Slough Borough Council requires the installation of cemetery plinths at Slough Cemetery, Stoke Road, Slough, SL2 5AX .

    Published value
    £50k
    Annual run-rate
    £74kpublished value ÷ term, exc. VAT
    Term
    30 Apr 2026 → 31 Dec 2026 · 8 months
    Reference
    ocds-h6vhtk-069f1a
  3. Ends · in 65 days

    Hire of Changing Rooms for Sports Centre Via ESPO 953_26 Lot 5 Modular Buildings ( Hire)

    Redditch Borough Council · Local authority · Nationwide (UK)

    Incumbent: Portakabin Site Accomodation

    RBC Hire of Changing Rooms for Sports Centre Via ESPO 953_26 Lot 5 Modular Buildings ( Hire)

    Published value
    £40k
    Annual run-rate
    —term under 6 months
    Term
    7 Sept 2026 → 31 Dec 2026 · 4 months
    Reference
    ocds-h6vhtk-06ecbd
  4. Ends · in 65 days

    CSP26803 - Magnet frames

    UK Research and Innovation · Central government · Nationwide (UK)

    Incumbent: Wec Group Ltd

    ***** THIS IS A CONTRACT DETAILS NOTICE, NOT A CALL FOR COMPETITION ***** This procurement is being concluded following a limited competition procurement exercise. Contract details notice for the supply of SuperMuSR magnet frames (large par…

    Published value
    £38k
    Annual run-rate
    —term under 6 months
    Term
    26 Aug 2026 → 31 Dec 2026 · 4 months
    Reference
    ocds-h6vhtk-06ed15
  5. Ends · in 65 daysExtension option · up to 31 Dec 2028

    The provision of Joint Command Unit IT support

    The Police, Fire and Crime Commissioner for Northamptonshire · Police & fire

    Incumbent: EXCELERATE TECHNOLOGY LTD

    The provision of Joint command unit IT Support for Northamptonshire Fire and Rescue Unit

    Published value
    £26k
    Annual run-rate
    £26kpublished value ÷ term, exc. VAT
    Term
    1 Jan 2026 → 31 Dec 2026 · 1 yr · up to 31 Dec 2028 with extensions
    Reference
    ocds-h6vhtk-0657ee
  6. Ends · in 66 days

    DDaT26325 - Field Service Attendance and Hardware Upgrade

    UK Research and Innovation · Central government · Nationwide (UK)

    Incumbent: Anschuetz GmbH

    ***** THIS IS A CONTRACT DETAILS NOTICE, NOT A CALL FOR COMPETITION ***** This procurement is being concluded without competition due to an absence of competition for technical reasons, only a particular supplier can supply the goods, servi…

    Published value
    €30,400
    Annual run-rate
    —not a GBP value
    Term
    28 Sept 2026 → 1 Jan 2027 · 3 months
    Reference
    ocds-h6vhtk-0774fa
  7. Estimated end · in 72 days

    Temporary Terminal Building, Troon

    Caledonian Maritime Assets Ltd (Utility) · Scotland

    Incumbent: Portakabin, Paisley Hire Centre · Last contest: 2 bids (0 SME)

    As part of the upgrade works proposed at Ardrossan Harbour, the main berth will be closed for a period of time and, during this period of closure, the Ardrossan ferry services will operate from Troon. In order to operate efficiently there i…

    • Modular and portable buildings
    Published value
    £1.0m
    Annual run-rate
    —start date not published
    Term
    Estimated end 7 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-02ea1d
  8. Ends · in 72 days

    Specialist Roofing Works

    Moat Homes Limited · Charity · South East England

    Incumbent: A.& E.ELKINS LIMITED

    Specialist Balcony Roofing works for 3 properties within one of our blocks

    Published value
    £72k
    Annual run-rate
    £72kpublished value ÷ term, exc. VAT
    Term
    7 Jan 2026 → 7 Jan 2027 · 1 yr
    Reference
    ocds-h6vhtk-060160
  9. Ends · in 73 days

    9003417 - Supply of Primary Electron Beam Position Monitor Supports

    DIAMOND LIGHT SOURCE LIMITED · Central government · South East England

    Incumbent: Revol TT Consulting, s.r.o.

    Located on the Harwell Science and Innovation Campus in Oxfordshire, Diamond Light Source (DLS) is a leading-edge facility for science, engineering and innovation. Diamond allows researchers from academia and industry to investigate the str…

    Published value
    £846k
    Annual run-rate
    £840kpublished value ÷ term, exc. VAT
    Term
    6 Jan 2026 → 8 Jan 2027 · 1 yr
    Reference
    ocds-h6vhtk-05d218
  10. Estimated end · in 75 days

    Supply and Installation of Mechanical Locks, Keys and Associated Ironmongery

    University of Bristol · Education · South West England

    Incumbent: Guardian Security (GB) Ltd · Last contest: 1 bid (1 SME) · awarded 26% over the estimate

    Provision of provide mechanical locks, keys and associated ironmongery supplies and installations on an on-demand/ad hoc basis, as and when required. Additionally and if required, the Supplier shall provide the above as part of a lock sets …

    • Locks, keys and hinges
    Published value
    £995k
    Annual run-rate
    —start date not published
    Term
    Estimated end 10 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-04167a
  11. Ends · in 75 days

    CSP26786 - Gadolinium Foil

    UK Research and Innovation · Central government · Nationwide (UK)

    Incumbent: Goodfellow Cambridge Ltd

    ***** THIS IS A CONTRACT DETAILS NOTICE, NOT A CALL FOR COMPETITION ***** This procurement is being concluded following a limited competition procurement exercise. UK Research Innovation (UKRI) had a requirement for Gadolinium Foil to be su…

    Published value
    £20k
    Annual run-rate
    —term under 6 months
    Term
    1 Sept 2026 → 10 Jan 2027 · 4 months
    Reference
    ocds-h6vhtk-06f0cb
  12. Ends · in 80 days

    PLA26167 Bay of Lights 2026 – Ice Rink Marquee Provider

    Torbay Council · Local authority · South West England

    Incumbent: Marldon Marquees Limited

    Marquee provision and associated services for Bay of Lights 2026 Ice Rink

    Published value
    £60k
    Annual run-rate
    —term under 6 months
    Term
    2 Nov 2026 → 15 Jan 2027 · 2 months
    Reference
    ocds-h6vhtk-077ec2
  13. Ends · in 80 days

    DDaT26519 - Electrical Hardware

    UK Research and Innovation · Central government · Nationwide (UK)

    Incumbent: Underwoods electrical Distributors

    ***** THIS IS A CONTRACT DETAILS NOTICE, NOT A CALL FOR COMPETITION ***** This procurement is being concluded following a limited competition procurement exercise. Brief Description of Requirement: Electrical Hardware

    Published value
    £13k
    Annual run-rate
    —term under 6 months
    Term
    16 Oct 2026 → 15 Jan 2027 · 3 months
    Reference
    ocds-h6vhtk-078ad5
  14. Estimated end · in 82 days

    Building Materials

    CHP · East of England

    Incumbent: STARK BUILDING MATERIALS UK LIMITED · Last contest: 2 bids (0 SME)

    AWARD NOTICE The main purpose of the Contract is to supply CHP with the required materials, products and tools so that we can maintain our housing stock of approximately 11,000 properties across Essex and surrounding areas. Our key aims hav…

    • Construction structures and materials; auxiliary products to construction (except electric apparatus)
    Published value
    £443k
    Annual run-rate
    —start date not published
    Term
    Estimated end 17 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-040865
  15. Estimated end · in 82 days

    Consumables and Hand Tools

    CHP · East of England

    Incumbent: Screw Centre Ltd · Last contest: 2 bids (1 SME)

    AWARD NOTICE The main purpose of the Contract is to supply CHP with the required materials, products and tools so that we can maintain our housing stock of approximately 11,000 properties across Essex and surrounding areas. Our key aims hav…

    • Construction structures and materials; auxiliary products to construction (except electric apparatus)
    Published value
    £262k
    Annual run-rate
    —start date not published
    Term
    Estimated end 17 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-040865
  16. Estimated end · in 82 days

    Power Tools

    CHP · East of England

    Incumbent: Screw Centre Ltd · Last contest: 4 bids (1 SME)

    AWARD NOTICE The main purpose of the Contract is to supply CHP with the required materials, products and tools so that we can maintain our housing stock of approximately 11,000 properties across Essex and surrounding areas. Our key aims hav…

    • Construction structures and materials; auxiliary products to construction (except electric apparatus)
    Published value
    £123k
    Annual run-rate
    —start date not published
    Term
    Estimated end 17 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-040865
  17. Estimated end · in 82 days

    Glazing

    CHP · East of England

    Incumbent: Screw Centre Ltd · Last contest: 1 bid (1 SME)

    AWARD NOTICE The main purpose of the Contract is to supply CHP with the required materials, products and tools so that we can maintain our housing stock of approximately 11,000 properties across Essex and surrounding areas. Our key aims hav…

    • Construction structures and materials; auxiliary products to construction (except electric apparatus)
    Published value
    £114k
    Annual run-rate
    —start date not published
    Term
    Estimated end 17 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-040865
  18. Estimated end · in 82 days

    Timber Doors

    CHP · East of England

    Incumbent: Huws Gray Limited · Last contest: 2 bids (0 SME)

    AWARD NOTICE The main purpose of the Contract is to supply CHP with the required materials, products and tools so that we can maintain our housing stock of approximately 11,000 properties across Essex and surrounding areas. Our key aims hav…

    • Construction structures and materials; auxiliary products to construction (except electric apparatus)
    Published value
    £107k
    Annual run-rate
    —start date not published
    Term
    Estimated end 17 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-040865
  19. Estimated end · in 82 days

    Locks

    CHP · East of England

    Incumbent: Huws Gray Limited · Last contest: 1 bid (0 SME)

    AWARD NOTICE The main purpose of the Contract is to supply CHP with the required materials, products and tools so that we can maintain our housing stock of approximately 11,000 properties across Essex and surrounding areas. Our key aims hav…

    • Construction structures and materials; auxiliary products to construction (except electric apparatus)
    Published value
    £106k
    Annual run-rate
    —start date not published
    Term
    Estimated end 17 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-040865
  20. Estimated end · in 88 days

    Fire Detection

    Northampton General Hospital NHS Trust · NHS & health · East Midlands

    Incumbent: Fire Systems Consultants Ltd · Last contest: 4 bids (4 SME)

    Fire Detection replacement plan

    • Fire-protection devices
    Published value
    Not published
    Annual run-rate
    —value not published
    Term
    Estimated end 23 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-03b408
  21. Ends · in 88 days

    Blaxton Playing Field Nature Trail

    Blaxton Parish Council · Local authority · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England

    Incumbent: Bingham's Ground Services Ltd

    The supply and installation of a nature trail (path)

    Published value
    £32k
    Annual run-rate
    £32kpublished value ÷ term, exc. VAT
    Term
    26 Jan 2026 → 23 Jan 2027 · 1 yr
    Reference
    ocds-h6vhtk-06158d
  22. Estimated end · in 89 daysFramework recordPanel · 8 suppliers

    NHMF Frameworx Material Supply Framework Agreements 2022

    National Heritage Memorial Fund · Other public body · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England

    Panel: Bradfords Building Supplies Limited, Brewers Decorator Centres, Huws Gray Limited +5 more

    • Building materials
    Published value
    £500mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 24 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-037d74
  23. Estimated end · in 90 daysFramework recordPanel · 4 suppliers

    Building Materials Tools and Hardware

    Crescent Purchasing Consortium Limited · Nationwide (UK)

    Panel: City Electrical Factors Limited, Huws Gray Limited, Jewson Ltd +1 more

    • Building materials

    Re-procurement plannedBuilding Materials, Tools and Hardware Supplies · tender expected

    Published value
    £28mlargest agreement; total ceiling not published
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 25 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-034fed
  24. Estimated end · in 96 days

    Contract

    Choice Housing · Northern Ireland

    Incumbent: J P CORRY · Last contest: 2 bids (0 SME)

    Choice Services is looking to appoint a supplier of general building materials. The supplier will be expected to deliver and also allow for collection of urgent materials. This will be a 3 year contract (on a 1+1+1) basis

    • Building materials
    Published value
    £108k
    Annual run-rate
    —start date not published
    Term
    Estimated end 31 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-0332a6
  25. Ends · in 96 daysFramework recordPanel · 5 suppliers

    Scaffolding Hire and Inspection Services to Falkirk Council Housing Properties

    Falkirk Council · Local authority · Scotland

    Panel: Clyde Scaffolding Ltd, Mar Scaffolding (Scotland) Limited, The JR Group +2 more

    • Scaffolding
    Published value
    £4.9mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-036367

When contracts end · Construction structures and materials
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

340 contracts and agreements end within 24 months, 506 in total · £105m published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months73
  2. 3–6 months66
  3. 6–12 months81
  4. 12–24 months120

Top sectors, next 12 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.