Retender radar: UK public contracts ending soon

Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the next 12 months

Page 4 · 100 contracts on this page · more available

1,000+ contracts

  1. Estimated end · in 67 daysFramework recordPanel · 3 suppliers

    National Framework Agreement for Teleradiology, Telepathology and Telemedicine Services

    Countess of Chester Hospital NHS Foundation Trust · NHS & health · Nationwide (UK)

    Panel: AxonMedical LTD T/A Axon Diagnostics, Business and Service Solutions Ltd, The International Radiology Reporting Group Ltd

    • Health services

    Re-procurement plannedNational Framework Agreement for Teledermatology and Telemicrobiology Services · tender expected

    Published value
    £100mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 2 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-034719
  2. Estimated end · in 67 daysCall-off

    RWM703 Site Characterisation Interpretation Support Framework

    Radioactive Waste Management Limited · Nationwide (UK)

    Incumbent: British Geological Survey · Last contest: 10 bids

    RWM703 Site Characterisation Interpretation Support Framework

    • Seismic processing services
    Published value
    £5.0mvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 2 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-03638a
  3. Estimated end · in 67 daysCall-off

    building control emergency works

    East Riding of Yorkshire Council · Local authority · Yorkshire and the Humber

    Incumbent: Westlinks Joiners & Locksmiths · Last contest: 5 bids

    • Construction work
    Published value
    £175kvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 2 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-02ed55
  4. Estimated end · in 67 daysCall-offPanel · 3 suppliers

    Lot 1: The design, manufacture, testing and delivery of outdoor single phase and three phase pole mounted distribution transformers in the range 16kVA to 315kVA

    Northern Ireland Electricity Networks Limited · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands

    Panel: Hitachi Energy Ireland Limited, Kyte Powertech Limited, Toshiba International (Europe) Ltd · Last contest: 6 bids (2 SME)

    • Engineering design services
    Published value
    Not publishedvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 2 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-02874c
  5. Estimated end · in 68 daysFramework recordPanel · 35 suppliers

    NP39724 Generic and Biosimilar Cancer Medicines

    The Common Services Agency (more commonly known as NHS National Services Scotland) (NSS) · NHS & health · Nationwide (UK), Scotland

    Panel: ACCORD-UK LTD, Aspen Pharmacare UK Limited, Aspire Pharma Ltd +32 more

    • Pharmaceutical products
    Published value
    £57mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 3 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-04870b
  6. Estimated end · in 68 daysCall-off

    NPCC Counter Drones National Array Upgrade / Replacement Programme Framework

    Home Office · Central government · Nationwide (UK)

    Incumbent: Aerial Armor · Last contest: 6 bids

    The Home office on behalf of the NPPC is seeking to create a Framework Agreement for the NPPC Counter Drones National Array Upgrade / Replacement Programme. This Framework Agreement seeks to support delivery of this programmes though the pr…

    • Security, fire-fighting, police and defence equipment
    Published value
    £8.0mvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 3 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-037fee
  7. Estimated end · in 68 daysFramework recordPanel · 2 suppliers

    Framework for the Supply of Materials (Concrete and Asphalt)

    Wrexham County Borough Council · Local authority · Wales (Cymru)

    Panel: BREEDON TRADING LIMITED, Robert Hunter & son Ltd

    • Highway materials
    Published value
    £1.5mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 3 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-04ad94
  8. Estimated end · in 68 daysFramework record

    The Supply of Commercial Refrigerator and Freezer Products and Equipment

    Lancashire County Council · Local authority · North West England

    Incumbent: The Acme Facilities Group Limited

    • Refrigerators and freezers

    Re-procurement openThe Supply of Commercial Refrigeration and Freezer Equipment · bids close

    Published value
    £432kpublished ceiling for the whole framework
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 3 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-0376d5
  9. Estimated end · in 69 daysFramework recordPanel · 2 suppliers

    Responsive Repairs, Void Property Works and Out of Hours Emergency Works

    Trust Housing Association Ltd · Housing · Scotland

    Panel: Quality Assured Property Maintenance Limited, Response Building Maintenance Services (Scotland) Ltd

    • Repair and maintenance services
    Published value
    £965klargest agreement; total ceiling not published
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 4 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-0495dc
  10. Ends · in 69 daysFramework record

    Provision of stop smoking medication

    West Northamptonshire Council · Local authority · East Midlands

    Incumbent: Direct Supply Solutions Ltd

    The assessment, prescription, delivery and follow up for the provision of stop smoking medication for the Council's stop smoking service.

    Re-procurement openStop Smoking Medication Framework · bids close

    Published value
    £242klargest agreement; total ceiling not published
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    5 Jan 2026 → 4 Jan 2027 · 1 yr
    Reference
    ocds-h6vhtk-066214
  11. Estimated end · in 70 daysFramework recordPanel · 8 suppliers

    Strategic Asset Management Services Framework

    Places for People on behalf of PfP & Anchor Hanover Group · Nationwide (UK), East of England

    Panel: Faithorn Farrell Timms LLP, MICHAEL DYSON ASSOCIATES LIMITED, Momentum 4 Ltd +5 more

    • Building consultancy services
    Published value
    £400mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 5 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-03778b
  12. Estimated end · in 70 daysFramework recordPanel · 34 suppliers

    HCC July 2022 - The Provision of a Framework Agreement for Independent Living Products

    Hertfordshire County Council · Local authority · East of England

    Panel: Accora Ltd, Aidapt Bathrooms Ltd, Arjo UK Ltd +31 more

    • Medical equipments
    Published value
    £37mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 5 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-0353a4
  13. Estimated end · in 70 daysFramework record

    Soha Retrofit Contract 2023

    Soha Housing Ltd · West Midlands, South East England

    Incumbent: E.ON Energy Solutions

    The Contract is for the installation of energy improvement measures including the application of external wall insulation, replacement of double glazed windows and doors and the upgrading of loft insulation to approximately 200 tenanted Soh…

    • Thermal insulation work
    Published value
    £4.1mlargest agreement; total ceiling not published
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 5 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-030790
  14. Estimated end · in 70 daysFramework recordPanel · 3 suppliers

    Framework agreement for the provision of e-Resources for East Midlands Library (EMLIB) Consortium

    Nottinghamshire County Council · Local authority · East Midlands

    Panel: BOLINDA UK LTD, OVERDRIVE GLOBAL LIMITED, ULVERSCROFT LIMITED

    Nottinghamshire County Council (the Council) is undertaking this procurement on behalf of the East Midlands Libraries (EMLIB) Consortium to establish a framework agreement for the supply of a range of e-Resources, namely e-Books, e-Audioboo…

    • Library services
    Published value
    £540klargest agreement; total ceiling not published
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 5 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-036b6b
  15. Estimated end · in 70 daysCall-off

    Modelling the role of surface properties in collision risk

    National Highways Limited · Central government · Nationwide (UK)

    Incumbent: TRL ltd · Last contest: 40 bids

    • Information technology services
    Published value
    £196kvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 5 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-02c68e
  16. Estimated end · in 70 daysFramework record

    Office MFD Printers & Scanners

    B3Living · East of England

    Incumbent: Vision Group (Holdings) Limited

    • Printers and plotters
    Published value
    £60kpublished ceiling for the whole framework
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 5 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-0374ea
  17. Estimated end · in 70 daysFramework record

    NEX21/10 Technical and Commercial Consultancy Services (Engineering)

    Nexus · North East England

    Incumbent not published

    • Engineering services
    Published value
    Not publishedlargest agreement; total ceiling not published
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 5 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-02cd98
  18. Estimated end · in 71 daysFramework recordPanel · 3 suppliers

    West Yorkshire Mass Transit Network - Business Case Development Partner

    West Yorkshire Combined Authority · Local authority · Yorkshire and the Humber

    Panel: Jacobs UK Ltd, Mott MacDonald, Turner & Townsend Project Management Limited

    • Architectural, construction, engineering and inspection services
    Published value
    £25mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 6 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-02e3a8
  19. Estimated end · in 71 daysFramework record

    CPU 3291 (NCC) Fresh Produce Framework

    Nottingham City Council · Local authority · East Midlands

    Incumbent: Mike Maloney Country Butchers and Bakers Limited

    • Fruit, vegetables and related products
    Published value
    £6.0mpublished ceiling for the whole framework
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 6 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-038665
  20. Estimated end · in 71 daysFramework record

    The Supply of Metals

    LEIDOS SUPPLY, LIMITED · Nationwide (UK)

    Incumbent: Righton Blackburn Ltd

    • Steel
    Published value
    £2.0mpublished ceiling for the whole framework
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 6 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-03284c
  21. Ends · in 71 daysFramework recordExtension option · up to 6 Jan 2029

    Language Services

    Equality and Human Rights Commission · Central government · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England

    Incumbent: Prestige Network Limited

    Published value
    £25kpublished ceiling for the whole framework
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    7 Jan 2026 → 6 Jan 2027 · 1 yr · up to 6 Jan 2029 with extensions
    Reference
    ocds-h6vhtk-05ced3
  22. Estimated end · in 72 daysFramework record

    Furniture & Associated Services 2

    The Minister for the Cabinet Office acting through Crown Commercial Service · Central government · Nationwide (UK), Wales (Cymru)

    Incumbent not published

    • Racking
    Published value
    £400mpublished ceiling for the whole framework
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 7 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-032e85
  23. Estimated end · in 72 daysFramework recordPanel · 6 suppliers

    Autism Assessment and Diagnostic Framework Agreement

    Norfolk County Council · Local authority · East of England

    Panel: Autism Anglia, Help for Psychology Services Limited, Mind Professionals Limited +3 more

    • Health and social work services
    Published value
    £5.0mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 7 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-02d8dd
  24. Ends · in 73 daysCall-offBuyer plans to re-tender 28 Apr 2028

    LSHTM-2026-004 - Phase 4 - Trench Removal Level 3

    London School of Hygiene & Tropical Medicine · Education · Greater London

    Incumbent: Woods Building Services Limited

    LSHTM has a Licenced Asbestos Removal Contractor (LARC) framework. This contract details notice is to advertise an award under this framework following competition. LSHTM-2026-004 - Phase 4 - Trench Removal Level 3

    Published value
    £237kvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    8 Sept 2026 → 8 Jan 2027 · 4 months
    Reference
    ocds-h6vhtk-051654
  25. Estimated end · in 74 daysFramework record

    Reconditioning of Wheelchairs

    NHS Wales Shared Services Partnership-Procurement Services (hosted by Velindre University NHS Trust) · NHS & health · Wales (Cymru)

    Incumbent: Invacare Ltd

    • Repair and maintenance services of wheelchairs
    Published value
    £1.1mpublished ceiling for the whole framework
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 9 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-036789
  26. Estimated end · in 74 daysCall-off

    Colchester Reuse - Design, Consenting and Enabling Services

    Anglian Water Services · Other public body · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands

    Incumbent: Atkins Limited · Last contest: 21 bids (6 SME)

    • Environmental monitoring for construction
    Published value
    Not publishedvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 9 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-02874b
  27. Estimated end · in 75 daysFramework recordPanel · 3 suppliers

    TC038 - Provision for Defence of Civil Litigation and Ad hoc Legal Advice

    Bolton Council · Local authority · North West England

    Panel: Forbes Solicitors, Plexus Law Limited, Weightmans LLP

    • Legal services
    Published value
    £516kpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 10 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-0375de
  28. Estimated end · in 75 daysFramework recordPanel · 2 suppliers

    Development of online academic courses

    Heriot-Watt University · Education · Scotland

    Panel: Curio London, Online Education Services

    • Higher education services
    Published value
    Not publishedlargest agreement; total ceiling not published
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 10 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-032052
  29. Estimated end · in 76 daysFramework recordPanel · 6 suppliers

    West Midlands Metro Framework Agreement relating to the provision of Diversionary Utilities Works for Metro extensions or any Major Highways Schemes

    West Midlands Combined Authority · Local authority · West Midlands

    Panel: Amelio Utilities Ltd, Barhale Ltd, CPC CIVILS LIMITED +3 more

    • Construction work for highways, roads
    Published value
    £30mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 11 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-03293d
  30. Estimated end · in 76 daysFramework recordPanel · 9 suppliers

    ENVIRONMENT & TRANSPORT – COMMISSIONING FRAMEWORK (E&T-CF) Lots 1,2 and 3

    Leicestershire County Council · Local authority · Nationwide (UK)

    Panel: AECOM LIMITED, Integrated Transport Planning Ltd, Jacobs UK Ltd +6 more

    • Architectural, construction, engineering and inspection services

    Re-procurement plannedLCC Transport & Infrastructure - Commissioning Framework 2026 · tender expected

    Published value
    £8.0mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 11 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-030dbf
  31. Estimated end · in 76 daysFramework recordPanel · 10 suppliers

    Ground Preparation Services Framework

    Natural Resources Wales · Wales (Cymru)

    Panel: CWM AGRICULTURAL LIMITED, Eirwyn James Plant services Ltd, G Brown +7 more

    • Forestry services

    Re-procurement plannedNatural Resources Wales - Ground Preparation Services Framework Agreement · tender expected

    Published value
    £8.0mlargest agreement; total ceiling not published
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 11 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-0371cd
  32. Estimated end · in 76 daysFramework recordPanel · 13 suppliers

    Enhanced Supported Living Framework

    Sheffield City Council · Local authority · Yorkshire and the Humber

    Panel: Affinity Trust, CareTech Community Services Limited, Choice Support +10 more

    • Health services

    Re-procurement plannedEnhanced Care Framework · tender expected

    Published value
    £7.5mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 11 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-0374e3
  33. Estimated end · in 76 daysFramework recordPanel · 2 suppliers

    FW0074 Framework Agreement for Soil Surveys

    Forestry and Land Scotland · Scotland

    Panel: Andy Kennedy, The James Hutton Institute

    • Survey services
    Published value
    £3.5mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 11 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-02f891
  34. Estimated end · in 76 daysCall-off

    https://www.gov.uk/government/organisations/home-office

    Home Office · Central government · Nationwide (UK)

    Incumbent: D-Fend Solutions AD Ltd · Last contest: 6 bids

    1.1 The Home office on behalf of the NPPC is seeking to create a Framework Agreement for the NPPC Counter Drones team to procure an RF Sensor. This Framework Agreement seeks to support delivery of this procurement through the provision of s…

    • Electronic warfare systems and counter measures
    Published value
    £2.0mvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 11 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-038476
  35. Estimated end · in 76 daysCall-off

    https://www.gov.uk/government/organisations/home-office

    Home Office · Central government · Nationwide (UK)

    Incumbent: Aerial Armor · Last contest: 6 bids

    1.1 The Home office on behalf of the NPPC is seeking to create a Framework Agreement for the NPPC Counter Drones team to procure an RF Sensor. This Framework Agreement seeks to support delivery of this procurement through the provision of s…

    • Electronic warfare systems and counter measures
    Published value
    £2.0mvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 11 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-038476
  36. Estimated end · in 76 daysFramework recordPanel · 3 suppliers

    Early Release on Compassionate Grounds

    Ministry of Justice · Central government · Nationwide (UK)

    Panel: Marpe Health, MedCo (Secure Healthcare Service) Ltd, Primary Care Sheffield Ltd

    • Services provided by medical personnel
    Published value
    £16kpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 11 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-044f8a
  37. Estimated end · in 77 daysFramework recordPanel · 16 suppliers

    Rooftop Development Framework

    Watford Community Housing · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England

    Panel: BPG Limited, Breyer Group Plc, Calfordseaden LLP +13 more

    • Roof works and other special trade construction works
    Published value
    £200mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 12 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-035b2e
  38. Estimated end · in 77 daysFramework recordPanel · 2 suppliers

    HCC11/22- Framework Agreement for the Supply of Waste Containers For Hertfordshire’s Recycling Network

    Hertfordshire County Council · Local authority · East of England

    Panel: GWR Engineering Ltd, The Skip Factory Limited

    • Waste and rubbish containers and bins
    Published value
    £500kpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 12 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-0386b6
  39. Estimated end · in 78 daysFramework record

    Web Based & Proprietary Device Framework

    Scottish Government · Scotland

    Incumbent: XMA Limited

    • Computer equipment and supplies
    Published value
    £100mpublished ceiling for the whole framework
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 13 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-03a5f5
  40. Estimated end · in 78 daysFramework recordPanel · 8 suppliers

    Hyde Buildings (Fire) and Security Systems Maintenance & Repair Services Framework

    The Hyde Group · Housing · Nationwide (UK)

    Panel: AJS Ltd, Abca Systems Ltd (2nd), Abca Systems Ltd (4th) +5 more

    • Repair and maintenance services
    Published value
    £14mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 13 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-0334be
  41. Estimated end · in 78 daysFramework record

    Production Insurance Scheme

    The British Broadcasting Corporation (BBC) · Nationwide (UK)

    Incumbent: Quartz Insurance Brokers Limited

    • Insurance and pension services
    Published value
    £450kpublished ceiling for the whole framework
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 13 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-02fdc0
  42. Estimated end · in 79 daysCall-off

    Cyber Next Generation -Technical Remediation Services Call-Off

    NHS England · NHS & health · Nationwide (UK)

    Incumbent: MTI Technology ltd · Last contest: 2 bids (2 SME)

    • Security software development services
    Published value
    £9.9mvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 14 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-04b691
  43. Ends · in 80 daysFramework recordPanel · 2 suppliers

    Marine Planning & Licensing Framework

    Scottish Government · Scotland

    Panel: ABPmer, Atkins Limited

    • Environmental services
    Published value
    £1.0mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 15 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-037dd6
  44. Ends · in 80 daysFramework record

    IT Services

    SSE SERVICES PLC · Nationwide (UK), East Midlands, West Midlands, Wales (Cymru)

    Incumbent not published

    Development of a MPRS MHHS DIP Adapter

    • Programming services of packaged software products
    Published value
    Not publishedlargest agreement; total ceiling not published
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Ends 15 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-038bc0
  45. Estimated end · in 81 daysFramework record

    Recreation Visitor Counters

    Natural Resources Wales · Wales (Cymru)

    Incumbent: A & P Chambers Ltd

    • Traffic-monitoring equipment
    Published value
    £562kpublished ceiling for the whole framework
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 16 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-037c5f
  46. Estimated end · in 81 daysFramework record

    Development Programme for Departmental Leaders

    The British Broadcasting Corporation (BBC) · Nationwide (UK)

    Incumbent: The Performants Group (trading as T-Minus)

    • Personal development training services
    Published value
    £315kpublished ceiling for the whole framework
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 16 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-03f948
  47. Estimated end · in 81 daysCall-off

    I & M of Cable Tunnels

    UK POWER NETWORKS (OPERATIONS) LIMITED · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands

    Incumbent not published · Last contest: 21 bids (6 SME)

    • Environmental monitoring for construction
    Published value
    Not publishedvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 16 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-02874b
  48. Estimated end · in 81 daysCall-off

    I & M of Cable Tunnels

    UK POWER NETWORKS (OPERATIONS) LIMITED · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands

    Incumbent not published · Last contest: 21 bids (6 SME)

    • Environmental monitoring for construction
    Published value
    Not publishedvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 16 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-02874b
  49. Estimated end · in 81 daysCall-off

    I & M of Cable Tunnels

    UK POWER NETWORKS (OPERATIONS) LIMITED · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands

    Incumbent not published · Last contest: 21 bids (6 SME)

    • Environmental monitoring for construction
    Published value
    Not publishedvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 16 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-02874b
  50. Estimated end · in 81 daysCall-off

    Electric Vehicle Charging Infrastructure

    AFFINITY WATER LIMITED · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands

    Incumbent not published · Last contest: 21 bids (6 SME)

    • Environmental monitoring for construction
    Published value
    Not publishedvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 16 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-02874b
  51. Estimated end · in 82 daysFramework record

    Supply of Energy 2

    The Minister for the Cabinet Office acting through Crown Commercial Service (CCS · Central government · Nationwide (UK), Yorkshire and the Humber, South East England

    Incumbent not published

    • Energy and related services
    Published value
    £51bnpublished ceiling for the whole framework
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 17 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-02af3f
  52. Estimated end · in 82 daysFramework record

    Vehicle Lease, Fleet Management & Salary Sacrifice

    Crown Commercial Service · Central government · Nationwide (UK), Wales (Cymru)

    Incumbent not published

    • Motor vehicles
    Published value
    £2.3bnpublished ceiling for the whole framework
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 17 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-02faad
  53. Estimated end · in 82 daysFramework recordPanel · 29 suppliers

    NHMF Frameworx Planned Maintenance, Net Zero Carbon and Passive Fire Safety Works Framework Agreements 2022

    National Heritage Memorial Fund · Other public body · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England

    Panel: Architectural Decorators Ltd, BELL GROUP LTD, CARDO (WALES & WEST) LIMITED +26 more

    • Building completion work

    Re-procurement plannedPlanned Maintenance Framework - NI · tender expected

    Published value
    £850mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 17 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-03741f
  54. Estimated end · in 82 daysLinked to a framework or DPS

    Nottinghamshire Healthcare NHS Foundation Trust CAMHS Tier 4 2024-2026 /CAMHS Tier 4 24/25 / RP1- RHA 24/26 CAMHS Tier4 V0.1

    Northamptonshire Healthcare NHS Foundation Trust · NHS & health · East Midlands

    Incumbent: Nottinghamshire Healthcare NHS Foundation Trust

    • Psychiatric hospital services
    Published value
    £17mvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 17 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-04d729
  55. Estimated end · in 82 daysLinked to a framework or DPS

    St Andrews Healthcare CAMHS Tier 4 2024-2026 / RP1- NYA01 24/26 CAMHS Tier4 V.0.185111

    Northamptonshire Healthcare NHS Foundation Trust · NHS & health · East Midlands

    Incumbent: St Andrews Healthcare · Last contest: 1 bid

    Provision of: CAMHS Tier 4 and CAMHS Intensive Outreach services.

    • Psychiatric hospital services
    Published value
    £8.0mvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 17 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-04e598
  56. Estimated end · in 82 daysFramework recordPanel · 13 suppliers

    Framework Agreement for Building and Associated Works 2022 - 2026 for works up to a value of £250,000

    Wigan Council · Local authority · North West England

    Panel: A Connolly Limited, BELL GROUP LTD, Brookhouse Contracting Ltd +10 more

    • Building construction work
    Published value
    £8.0mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 17 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-035f29
  57. Estimated end · in 82 daysLinked to a framework or DPS

    St Andrews Healthcare CAMHS Tier 4 2024-2026 / RP1- NYA01 24/26 CAMHS Tier4 V.0.185111

    Northamptonshire Healthcare NHS Foundation Trust · NHS & health · East Midlands

    Incumbent: St Andrews Healthcare · Last contest: 1 bid

    • Psychiatric hospital services
    Published value
    £7.5mvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 17 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-04e598
  58. Estimated end · in 82 daysLinked to a framework or DPS

    Leicestershire Partnership NHS Foundation Trust 2426 /RP1- RPX 24/26 CAMHS Tier4 V.0.1

    Northamptonshire Healthcare NHS Foundation Trust · NHS & health · East Midlands

    Incumbent: Leicestershire Partnership NHS Foundation Trust · Last contest: 1 bid

    Provision of: CAMHS Tier 4 and CAMHS Intensive Outreach services.

    • Psychiatric hospital services
    Published value
    £5.7mvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 17 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-04e59b
  59. Estimated end · in 82 daysLinked to a framework or DPS

    St Andrews Healthcare CAMHS Tier 4 2024-2026 / RP1- NYA01 24/26 CAMHS Tier4 V.0.185111

    Northamptonshire Healthcare NHS Foundation Trust · NHS & health · East Midlands

    Incumbent: St Andrews Healthcare · Last contest: 1 bid

    • Psychiatric hospital services
    Published value
    £5.5mvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 17 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-04e598
  60. Estimated end · in 82 daysLinked to a framework or DPS

    Leicestershire Partnership NHS Foundation Trust 2426 /RP1- RPX 24/26 CAMHS Tier4 V.0.1

    Northamptonshire Healthcare NHS Foundation Trust · NHS & health · East Midlands

    Incumbent: Leicestershire Partnership NHS Foundation Trust · Last contest: 1 bid

    • Psychiatric hospital services
    Published value
    £4.2mvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 17 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-04e59b
  61. Estimated end · in 82 daysFramework record

    Marketing Print

    The British Broadcasting Corporation (BBC) · Nationwide (UK)

    Incumbent: Allied Publicity Services (Manchester) Limited

    • Printing services
    Published value
    £1.6mpublished ceiling for the whole framework
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 17 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-037e70
  62. Estimated end · in 82 daysFramework record

    Framework Agreement for the Supply of Renal Transport Services

    NHS Lanarkshire · NHS & health · Scotland

    Incumbent: hospital ambulance car service

    • Transport services (excl. Waste transport)
    Published value
    £1.6mpublished ceiling for the whole framework
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 17 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-041082
  63. Estimated end · in 82 daysFramework recordPanel · 3 suppliers

    Sign Shop Materials

    East Riding of Yorkshire Council · Local authority · Nationwide (UK), Yorkshire and the Humber

    Panel: Limelight Signs, N Sign Ltd, S. Taylor & Son Ltd

    • Signage
    Published value
    £602klargest agreement; total ceiling not published
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 17 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-03730b
  64. Estimated end · in 83 daysCall-off

    Operation Maintenance and Overhaul of Plain Line Grinders and Miller

    NETWORK RAIL INFRASTRUCTURE LIMITED · Other public body · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands

    Incumbent: Colas Rail Limited · Last contest: 6 bids (2 SME)

    • Supply services of commercial or industrial workers
    Published value
    £318mvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 18 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-02b21a
  65. Estimated end · in 83 daysFramework recordPanel · 3 suppliers

    Scape National Consultancy Framework - Scotland

    Scape Procure Scotland Ltd · Scotland

    Panel: ARCADIS CONSULTING (UK) LIMITED, Faithful+Gould, OVE ARUP & PARTNERS LIMITED

    • Architectural, construction, engineering and inspection services
    Published value
    £150mlargest agreement; total ceiling not published
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 18 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-0296cf
  66. Estimated end · in 83 daysFramework record

    National Framework Agreement for the provision of Infection Control Clinical Surveillance Systems

    Countess of Chester Hospital NHS Foundation Trust · NHS & health · Nationwide (UK)

    Incumbent: Baxter Healthcare Ltd

    • Clinical information system
    Published value
    £20mpublished ceiling for the whole framework
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 18 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-037e94
  67. Estimated end · in 83 daysFramework record

    P-0127 Provision of Water Services

    Manchester City Council · Local authority · North West England

    Incumbent: Anglian Water Business (National) Limited (trading as Wave Utilities)

    • Water distribution and related services
    Published value
    £5.0mpublished ceiling for the whole framework
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 18 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-049c77
  68. Ends · in 83 daysFramework record

    Framework Agreement for the provision of Gas Tightness Testing

    Staffordshire County Council · Local authority · Nationwide (UK)

    Incumbent: Key Integrated Services Limited

    • Gas appliance maintenance services
    Published value
    £650kpublished ceiling for the whole framework
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Ends 18 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-03651b
  69. Ends · in 83 daysFramework recordPanel · 2 suppliers

    Framework Agreement for the provision of Servicing and Maintenance of Fire Alarm Systems including Automatic and Manual Fire Detection, Gas Suppression Systems, Sprinklers and Dry Risers

    Staffordshire County Council · Local authority · Nationwide (UK)

    Panel: Amalgamated Ltd, Lantern Fire & Security Ltd

    • Installation services of fire protection equipment
    Published value
    £480kpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 18 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-037796
  70. Estimated end · in 84 daysFramework recordPanel · 6 suppliers

    Supply of Bus Shelters, Real Time Passenger Information Systems (RTPI) and Associated Services Y22030

    Kent County Council · Local authority · Nationwide (UK), Yorkshire and the Humber

    Panel: Bus Shelters Ltd, Externiture Ltd, R2P UK SYSTEMS LIMITED +3 more

    • Construction work for commercial buildings, warehouses and industrial buildings, buildings relating to transport
    Published value
    £50mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 19 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-037ec3
  71. Estimated end · in 84 daysFramework recordPanel · 8 suppliers

    NP47924 Cytokine Modulators

    The Common Services Agency (more commonly known as NHS National Services Scotland) (NSS) · NHS & health · Scotland

    Panel: Accord Healthcare Ltd, Biogen Idec Ltd, Celltrion Healthcare United Kingdom Limited +5 more

    • Pharmaceutical products
    Published value
    £44mlargest agreement; total ceiling not published
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 19 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-04b34f
  72. Estimated end · in 84 daysFramework record

    Student Bus Services

    UNIVERSITY OF DERBY · Education · East Midlands

    Incumbent: Trent Motor Traction Ltd t/a trentbarton

    This scope of bus services is to undertake a Competitive Dialogue Procedure for the busservice provision for the University of Derby, Derby Campus and Buxton & Leek College, Page 4 to 12Buxton Campus. We are seeking collaboration and partne…

    • Road transport services
    Published value
    £5.0mpublished ceiling for the whole framework
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 19 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-028f35
  73. Estimated end · in 85 daysFramework recordPanel · 9 suppliers

    TC623 NORTH WEST CONSTRUSTION HUB – LOW VALUE CONSTRUCTION FRAMEWORK (2024 TO 2028)

    Manchester City Council · Local authority · North West England

    Panel: Conlon Construction Limited, Equans Regeneration Ltd, Eric Wright Construction +6 more

    • Construction work
    Published value
    £400mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 20 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-0406c2
  74. Estimated end · in 85 daysFramework recordPanel · 8 suppliers

    T1628 - Framework for the Provision of Agency Workers to the Northern Ireland Housing Executive

    Northern Ireland Housing Executive · Northern Ireland

    Panel: Apple Recruitment Services, Brook Street UK Limited, CPL RESOURCES PUBLIC LIMITED COMPANY +5 more

    • Supply services of personnel including temporary staff

    Re-procurement plannedProvision of Agency Workers to the Northern Ireland Housing Executive

    Published value
    £56mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 20 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-036b14
  75. Estimated end · in 85 daysFramework recordPanel · 6 suppliers

    PfH Lone Worker Solutions

    Procurement for Housing · Nationwide (UK)

    Panel: CPR Global Tech Ltd, Careline Security Ltd T/A First County Monitoring, Lone Worker Solutions +3 more

    • Alarm-monitoring services
    Published value
    £7.5mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 20 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-03084b
  76. Estimated end · in 85 daysFramework recordPanel · 2 suppliers

    Planting, Maintenance and Supply of Trees

    Sunderland City Council · Local authority · North East England

    Panel: BRAMBLEDOWN LANDSCAPE SERVICES LIMITED, Microsite

    • Forestry and logging products
    Published value
    Not publishedlargest agreement; total ceiling not published
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 20 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-0387b2
  77. Estimated end · in 86 daysFramework recordPanel · 2 suppliers

    Framework Agreement for the provision for Demolition (including asbestos removal) Works including call-off for The BALE Centre

    Durham County Council · Local authority · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England

    Panel: GLC PROJECTS LTD, Sirius Demolition

    • Construction work
    Published value
    £5.0mlargest agreement; total ceiling not published
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 21 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-04a47c
  78. Ends · in 86 daysFramework recordExtension option · up to 21 Jan 2030Panel · 5 suppliers

    Provision of Electrical Services to Lisburn and Castlereagh City Council Facilities

    Lisburn & Castlereagh City Council · Local authority · Northern Ireland

    Panel: B.I. Electrical (NI) Services, GR White & Son Ltd, H & J MARTIN CONSTRUCTION LIMITED +2 more

    Published value
    £648klargest agreement; total ceiling not published
    Annual run-rate
    —panel, not one supplier
    Term
    22 Jan 2026 → 21 Jan 2027 · 1 yr · up to 21 Jan 2030 with extensions
    Reference
    ocds-h6vhtk-05d9d2
  79. Ends · in 87 daysFramework record

    UK Derived & Manufactured Dried Plasma Component

    NHS Blood and Transplant · NHS & health · Nationwide (UK), South West England

    Incumbent: Velico Medical

    • Plasma extracts
    Published value
    £6.0mpublished ceiling for the whole framework
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Ends 22 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-030b38
  80. Estimated end · in 88 daysFramework record

    Household Waste Recycling Centres (HWRCs) Containers

    Staffordshire County Council · Local authority · West Midlands

    Incumbent: GJF Fabrications Ltd

    • Steel
    Published value
    £480kpublished ceiling for the whole framework
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 23 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-037785
  81. Estimated end · in 89 daysFramework recordPanel · 8 suppliers

    NHMF Frameworx Material Supply Framework Agreements 2022

    National Heritage Memorial Fund · Other public body · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England

    Panel: Bradfords Building Supplies Limited, Brewers Decorator Centres, Huws Gray Limited +5 more

    • Building materials
    Published value
    £500mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 24 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-037d74
  82. Estimated end · in 89 daysFramework recordPanel · 10 suppliers

    Vehicle Accident Damage Repairs

    Scottish Police Authority · Police & fire · Scotland

    Panel: Allied Vehicles Limited (Bodyshop), Bustec Ltd, Dentec Hillington Ltd +7 more

    • Body-repair services for vehicles
    Published value
    £8.0mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 24 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-047140
  83. Estimated end · in 89 daysFramework recordPanel · 11 suppliers

    Audit and Tax Services

    APUC Ltd · Scotland

    Panel: Anderson Anderson & Brown LLP, BDO LLP, Chiene + Tait LLP +8 more

    • Accounting, auditing and fiscal services
    Published value
    £1.0mlargest agreement; total ceiling not published
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 24 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-0483b0
  84. Estimated end · in 90 daysFramework recordPanel · 11 suppliers

    Utility Supply and Energy Management Services Framework

    University of Essex · Education · Nationwide (UK)

    Panel: Castle Water Limited, CorEnergy Limited, Drax Energy Solutions Limited +8 more

    • Petroleum products, fuel, electricity and other sources of energy
    Published value
    £660mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 25 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-03731e
  85. Estimated end · in 90 daysFramework recordPanel · 9 suppliers

    National Framework Agreement for Payroll and Pensions Services

    Countess of Chester Hospital NHS Foundation Trust · NHS & health · Nationwide (UK)

    Panel: CIVICA UK LIMITED, ELFS Shared Services (Business Division of Northern Care Alliance), HR & Wellbeing Business Services +6 more

    • Payroll management services

    Re-procurement plannedNational Framework Agreement for the provision of Financial, Payroll and Pensions Services

    Published value
    £50mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 25 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-038660
  86. Estimated end · in 90 daysFramework recordPanel · 4 suppliers

    Building Materials Tools and Hardware

    Crescent Purchasing Consortium Limited · Nationwide (UK)

    Panel: City Electrical Factors Limited, Huws Gray Limited, Jewson Ltd +1 more

    • Building materials

    Re-procurement plannedBuilding Materials, Tools and Hardware Supplies · tender expected

    Published value
    £28mlargest agreement; total ceiling not published
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 25 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-034fed
  87. Estimated end · in 90 daysFramework recordPanel · 3 suppliers

    Proc 22-1809 Provision of Job Advert services/Job board Credits (Multi-Supplier Framework Agreement)

    Scottish Police Authority · Police & fire · Scotland

    Panel: CV Library, SATOS Media Ltd, s1jobs

    • Advertising services
    Published value
    £400kpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 25 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-037777
  88. Ends · in 90 daysLinked to a framework or DPS

    Cyber Assessment Framework (CAF) Assurance for Local Authorities

    Ministry of Housing, Communities & Local Government · Central government

    Incumbent: Bridewell Consulting Limited

    Published value
    £113kvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    26 Jan 2026 → 25 Jan 2027 · 1 yr
    Reference
    ocds-h6vhtk-060d8c
  89. Estimated end · in 91 daysFramework recordPanel · 26 suppliers

    HCC Sept 2024 – Framework Agreement for the Provision of Adult and Tailored Learning Services (Step2Skills)

    Hertfordshire County Council · Local authority · East of England

    Panel: Communities 1st, Community Alliance Broxbourne and East Herts, Community Learning Partnership Limited +23 more

    • Adult and other education services
    Published value
    £7.0mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 26 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-04a337
  90. Estimated end · in 91 daysFramework record

    P0560_2021 - Arboriculture Services (Non-PFI)

    Birmingham City Council · Local authority · West Midlands

    Incumbent:  CTS environmental management Ltd

    • Tree-clearing services
    Published value
    £2.8mpublished ceiling for the whole framework
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 26 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-029271
  91. Ends · in 91 daysFramework recordPanel · 4 suppliers

    COV - Quantity Surveyor and Employers Agent Framework 2025

    Coventry City Council · Local authority · West Midlands

    Panel: Armson and Partners, CURRIE and BROWN UK LIMITED, PMP Consultants +1 more

    • Quantity surveying services
    Published value
    £2.0mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 26 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-04b39d
  92. Estimated end · in 92 daysCall-off

    Provision of Annual Flexible Hose Assemblies Surveys and Examinations

    Ministry of Defence · Central government · Nationwide (UK), South East England

    Incumbent: BAE Systems Surface Ships Ltd · Last contest: 3 bids

    This notice is for the purposes of announcing the contract award to BAE SYSTEMS SURFACE SHIPS LIMITED for The Provision of Annual Flexible Hose Assemblies Surveys and Examinations for transparency purposes. Expressions of interest are not r…

    • Technical inspection services
    Published value
    £47kvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 27 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-0371f8
  93. Estimated end · in 93 daysFramework recordPanel · 6 suppliers

    Provision of Legal Services Framework 2024-2028

    Kingdom Housing Association Limited · Housing · Scotland

    Panel: Addleshaw Goddard LLP, BTO Solicitors LLP, Brodies LLP +3 more

    • Legal services
    Published value
    £18mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 28 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-040d47
  94. Estimated end · in 93 daysFramework recordPanel · 8 suppliers

    Traffic Management Services Framework 2025-2026

    Argyll and Bute Council · Local authority · Scotland

    Panel: Active Traffic Management Solutions Ltd, Central Traffic Management Ltd, Class One Traffic Management Ltd +5 more

    • Traffic-signal maintenance services
    Published value
    £230klargest agreement; total ceiling not published
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 28 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-04e937
  95. Estimated end · in 94 daysFramework recordPanel · 3 suppliers

    Contract

    Ministry of Defence · Central government · West Midlands

    Panel: Bozeat Industrial Ltd t/a B.I. Engineering, Carwood Motor Units, TVS Supply Chain Solutions Ltd

    Babcock Land Defence Limited - acting as agent to the UK Ministry of Defence ("the Authority") - has under consideration a 3 year Framework Agreement for The Supply of Mechanical Spares & Associated Items. The requirement is split into 4 lo…

    • Mechanical spare parts for military vehicles
    Published value
    £18mlargest agreement; total ceiling not published
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 29 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-044449
  96. Estimated end · in 94 daysFramework record

    Marine Seismic Survey and Processing

    Radioactive Waste Management Limited · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands

    Incumbent: Shearwater Geoservices Limited

    • Seismic services
    Published value
    £18mpublished ceiling for the whole framework
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 29 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-02c304
  97. Estimated end · in 94 daysFramework recordPanel · 3 suppliers

    Provision of Arboricultural Works

    East Renfrewshire Council · Local authority · Scotland

    Panel: Ayrshire Tree Surgeons Ltd, TD Tree & Land Services Ltd, Taylor Trees Limited

    • Tree-maintenance services
    Published value
    £1.6mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 29 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-041af1
  98. Estimated end · in 94 daysFramework recordPanel · 8 suppliers

    Framework Agreement for Exhibition Builds Valued over £150k at Imperial War Museums (IWM)

    Imperial War Museum · Nationwide (UK)

    Panel: Hadley Interiors Ltd, MER Services Ltd, Marcon Fit-Out Ltd +5 more

    • Museum-exhibition services
    Published value
    £1.3mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 29 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-041061
  99. Estimated end · in 94 daysFramework recordPanel · 7 suppliers

    Framework Agreement for Exhibition Builds Valued up to £150k at Imperial War Museums (IWM)

    Imperial War Museum · Nationwide (UK)

    Panel: Hadley Interiors Ltd, MER Services Ltd, Marcon Fit-Out Ltd +4 more

    • Museum-exhibition services
    Published value
    £600kpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 29 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-041060
  100. Estimated end · in 94 daysFramework recordPanel · 3 suppliers

    Non-Operated Plant Framework 2024-2027

    Cumberland Council · Local authority · North West England

    Panel: Easyhire Technologies limited, GAP Group Limited, Sunbelt Rentals Ltd

    The Council wishes to procure a framework for the hire of a range of non-operated small plant to support an in house delivery model of highway maintenance. The service will be a top up service to supplement the Council’s own small plant in …

    • Machinery for mining, quarrying, construction equipment
    Published value
    £400kpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 29 Jan 2027 · start not published
    Reference
    ocds-h6vhtk-041c45
How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.