Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the next 12 months
Showing 1,026–1,050
- Estimated end · in 226 daysCall-off
IT DELIVERY, TESTING AND SUPPORT SERVICES FRAMEWORK AGREEMENT
Scotland Gas Networks (SGN) · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Incumbent not published · Last contest: 21 bids (6 SME)
- Published value
- Not publishedvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 10 Jun 2027 · start not published
- Reference
ocds-h6vhtk-02874b
- Ends · in 226 days
ITEP0666 Augmentation Resource Package 1
National Highways Limited · Central government · Nationwide (UK)
Incumbent: BJSS Limited
- Published value
- £14m
- Annual run-rate
- £4.6mpublished value ÷ term, exc. VAT
- Term
- 7 Jun 2024 → 10 Jun 2027 · 3 yrs
- Reference
ocds-h6vhtk-051a66
- Ends · in 226 days
Authorising Engineer (Fire) Services on MPH UTC Project
Somerset NHS Foundation Trust · Central government · South West England
Incumbent: Fire Safety Partnership
Provision of Authorising Engineer (Fire) services to support the phased refurbishment and reconfiguration of clinical areas at Musgrove Park Hospital, including design review, fire safety compliance advice, and commissioning and handover su…
- Published value
- £32k
- Annual run-rate
- £32kpublished value ÷ term, exc. VAT
- Term
- 11 Jun 2026 → 10 Jun 2027 · 1 yr
- Reference
ocds-h6vhtk-06b35e
- Estimated end · in 228 daysCall-off
Grafham to Rede - Design, Consenting and Enabling Services
Anglian Water Services · Other public body · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Incumbent: Atkins Limited · Last contest: 21 bids (6 SME)
- Published value
- Not publishedvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 12 Jun 2027 · start not published
- Reference
ocds-h6vhtk-02874b
- Estimated end · in 228 days
Vehicular Impact Protection - Design
NORTHERN GAS NETWORKS LIMITED · North East England, North West England, Yorkshire and the Humber
Incumbent not published
Northern Gas Networks operate thousands of pieces of pressure reduction equipment dotted across the network. A Governor is a type of pressure reduction equipment. They are often situated in locations that make them susceptible to the risk o…
- Published value
- Not published
- Annual run-rate
- —value not published
- Term
- Estimated end 12 Jun 2027 · start not published
- Reference
ocds-h6vhtk-03f838
- Estimated end · in 228 days
Vehicular Impact Protection - Design
NORTHERN GAS NETWORKS LIMITED · North East England, North West England, Yorkshire and the Humber
Incumbent not published
Northern Gas Networks operate thousands of pieces of pressure reduction equipment dotted across the network. A Governor is a type of pressure reduction equipment. They are often situated in locations that make them susceptible to the risk o…
- Published value
- Not published
- Annual run-rate
- —value not published
- Term
- Estimated end 12 Jun 2027 · start not published
- Reference
ocds-h6vhtk-03f838
- Estimated end · in 228 days
Vehicular Impact Protection - Design
NORTHERN GAS NETWORKS LIMITED · North East England, North West England, Yorkshire and the Humber
Incumbent not published
Northern Gas Networks operate thousands of pieces of pressure reduction equipment dotted across the network. A Governor is a type of pressure reduction equipment. They are often situated in locations that make them susceptible to the risk o…
- Published value
- Not published
- Annual run-rate
- —value not published
- Term
- Estimated end 12 Jun 2027 · start not published
- Reference
ocds-h6vhtk-03f838
- Estimated end · in 229 daysCall-off
OO Supply & Install – Diesel Generators – Bowmore Power Station - 0324
SSE PLC · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Incumbent: Edina UK Limited · Last contest: 6 bids (2 SME)
- Published value
- £731kvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 13 Jun 2027 · start not published
- Reference
ocds-h6vhtk-02874c
- Estimated end · in 229 daysCall-off
OO Supply & Install – Diesel Generators – Bowmore Power Station - 0324
SSE PLC · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Incumbent: Edina UK Limited · Last contest: 6 bids (2 SME)
- Published value
- £731kvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 13 Jun 2027 · start not published
- Reference
ocds-h6vhtk-02874c
- Estimated end · in 229 daysCall-off
OO Supply & Delivery - 33kV Subsea cable - Scotland 0625
Scottish Hydro Electric Power Distribution plc · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Incumbent not published · Last contest: 6 bids (2 SME)
- Published value
- Not publishedvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 13 Jun 2027 · start not published
- Reference
ocds-h6vhtk-02874c
- Ends · in 229 daysExtension option · up to 13 Jul 2028
Subsidence Monitoring Services
Canterbury City Council · Local authority · South East England
Incumbent: Pyle Consulting Limited
For the provision of Subsidence Monitoring Services
- Published value
- £30k
- Annual run-rate
- £15kpublished value ÷ term, exc. VAT
- Term
- 14 Jun 2025 → 13 Jun 2027 · 2 yrs · up to 13 Jul 2028 with extensions
- Reference
ocds-h6vhtk-05dc85
- Ends · in 230 days
St Peters Court Council Tax Recovery
East Suffolk Council · Local authority · East of England
Incumbent: The Beattie Partnership Limited
St Peters Court in Lowestoft is a block of 90 flats, which is now vacant. The building is due for demolition around the middle of next year and the building has gradually been vacated between the end of 2022 and December 2024. Council tax c…
- Published value
- £70k
- Annual run-rate
- £70kpublished value ÷ term, exc. VAT
- Term
- 16 Jun 2026 → 14 Jun 2027 · 1 yr
- Reference
ocds-h6vhtk-06c2aa
- Ends · in 231 days
Inspection, Service and maintenance of Lincolnshire County Council submersible pumps and pumping stations
Lincolnshire County Council · Local authority
Incumbent: Lincoln Pump Services Ltd
The Quotations are invited for the supply of INSPECTION, SERVICE AND MAINTENANCE OF LINCOLNSHIRE COUNTY COUNCIL SUBMERSIBLE PUMPS AND PUMPING STATIONS as documented in the Appendix A - F.
- Published value
- £19kinc. VAT as published
- Annual run-rate
- £9kpublished value ÷ term, inc. VAT
- Term
- 16 Jun 2025 → 15 Jun 2027 · 2 yrs
- Reference
ocds-h6vhtk-055f1d
- Ends · in 232 daysExtension option · up to 16 Dec 2029
Provision of specialist planning advisory services to support the preparation and delivery of the East Lindsey Local Plan 2044
East Lindsey District Council · Local authority · East Midlands
Incumbent: IGLOO PLANNING SERVICES LIMITED
Provision of specialist planning advisory services to support the preparation and delivery of the East Lindsey Local Plan 2044. This includes expert advice on national planning policy and legislative changes, support in developing the evide…
- Published value
- £278kinc. VAT as published
- Annual run-rate
- £278kpublished value ÷ term, inc. VAT
- Term
- 17 Jun 2026 → 16 Jun 2027 · 1 yr · up to 16 Dec 2029 with extensions
- Reference
ocds-h6vhtk-06af71
- Ends · in 232 daysExtension option · up to 16 Dec 2029
The Provision of Specialist Planning Advisory Services
South Holland District Council · Local authority · East Midlands
Incumbent: Advanced Planning
Provision of flexible professional specialist planning support to assist with the preparation of the new Boston & South Holland Joint Plan under the Government's 30 month timetable. The services provided would be required to respond to emer…
- Published value
- £79kinc. VAT as published
- Annual run-rate
- £79kpublished value ÷ term, inc. VAT
- Term
- 17 Jun 2026 → 16 Jun 2027 · 1 yr · up to 16 Dec 2029 with extensions
- Reference
ocds-h6vhtk-06ad62
- Ends · in 232 daysExtension option · up to 16 Dec 2029
The Provision of Specialist Planning Advisory Services
South Holland District Council · Local authority · East Midlands
Incumbent: Advanced Planning
Provision of flexible professional specialist planning support to assist with the preparation of the new Boston & South Holland Joint Plan under the Government's 30 month timetable. The services provided would be required to respond to emer…
- Published value
- £0inc. VAT as published
- Annual run-rate
- —not computed
- Term
- 17 Jun 2026 → 16 Jun 2027 · 1 yr · up to 16 Dec 2029 with extensions
- Reference
ocds-h6vhtk-06ad62
- Ends · in 232 daysExtension option · up to 16 Dec 2029
Provision of specialist planning advisory services to support the preparation and delivery of the East Lindsey Local Plan 2044
East Lindsey District Council · Local authority · East Midlands
Incumbent: IGLOO PLANNING SERVICES LIMITED
Provision of specialist planning advisory services to support the preparation and delivery of the East Lindsey Local Plan 2044. This includes expert advice on national planning policy and legislative changes, support in developing the evide…
- Published value
- £0inc. VAT as published
- Annual run-rate
- —not computed
- Term
- 17 Jun 2026 → 16 Jun 2027 · 1 yr · up to 16 Dec 2029 with extensions
- Reference
ocds-h6vhtk-06af71
- Ends · in 233 days
UKRI-4763 NERC - Aircraft Operations Safety Case Development for British Antarctic Survey and FAAM Airborne Laboratory
UK Research and Innovation · East of England, South West England
Incumbent: Occam Group LTD · Last contest: 10 bids (8 SME) · awarded 24% under the estimate
Provision of Aircraft Operations Safety Case Development services for British Antarctic Survey and FAAM Airborne Laboratory
- Published value
- £380k
- Annual run-rate
- —start date not published
- Term
- Ends 17 Jun 2027 · start not published
- Reference
ocds-h6vhtk-04f92e
- Ends · in 233 days
Fire Engineering Services
The Guinness Partnership · Other public body · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: Oakleaf Surveying Limited
Contract relating to Fire Engineering Services
- Published value
- £34k
- Annual run-rate
- £17kpublished value ÷ term, exc. VAT
- Term
- 1 Jul 2025 → 17 Jun 2027 · 2 yrs
- Reference
ocds-h6vhtk-064910
- Estimated end · in 234 daysCall-off
FW Supply & Deliver - Environmental Monitoring Equipment - Multi 0630
Scottish Hydro Electric Power Distribution plc · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Incumbent: SCHNEIDER ELECTRIC LIMITED · Last contest: 6 bids (2 SME)
- Published value
- £1.8mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 18 Jun 2027 · start not published
- Reference
ocds-h6vhtk-02874c
- Ends · in 234 days
Technical Support Services for Heat Networks Contracts
London Borough of Southwark · Local authority · Greater London
Incumbent: Faithorn Farrell Timms LLP
Contract award of the Technical Support Services for Heat Networks Contracts.
- Published value
- £60k
- Annual run-rate
- £38kpublished value ÷ term, exc. VAT
- Term
- 19 Nov 2025 → 18 Jun 2027 · 1.6 yrs
- Reference
ocds-h6vhtk-05f7e1
- Estimated end · in 235 daysFramework recordPanel · 15 suppliers
London and Quadrant Housing Trust - Structural and Civil Engineering Services Framework 2023 - 2027
LONDON & QUADRANT HOUSING TRUST · Housing · Nationwide (UK)
Panel: Building Design Consultants Limited, Byrne Looby Partners (UK) Ltd, Campbell Reith Hill LLP +12 more
- Published value
- £200mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 19 Jun 2027 · start not published
- Reference
ocds-h6vhtk-03a4a3
- Ends · in 235 days
Fawcett field, Ladies mile, Carden Avenue - Architect
Brighton and Hove City Council · Local authority
Incumbent: Innes Associates Architecture and Urban Design
Fawcett Field is an Urban Fringe site (Site 17 UFA 2014) allocated for housing in the City Plan Part 2 adopted by full Council October 2022. The Estate Regeneration team wants to bring forward the potential development area to deliver a 100…
- Published value
- £33k
- Annual run-rate
- £16kpublished value ÷ term, exc. VAT
- Term
- 18 Jun 2025 → 19 Jun 2027 · 2 yrs
- Reference
ocds-h6vhtk-0592f9
- Estimated end · in 237 daysFramework recordPanel · 4 suppliers
Architectural Services Framework Agreement
South Ayrshire Council · Local authority · Scotland
Panel: AHR Architects Ltd, BUILDING DESIGN PARTNERSHIP LTD, Lawrence McPherson Associates +1 more
- Published value
- £750klargest agreement; total ceiling not published
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 21 Jun 2027 · start not published
- Reference
ocds-h6vhtk-0491af
- Estimated end · in 237 days
NHS Community Diagnostic Centre – NEC Contract Manager, QS and Clerk of Works
Kingston Upon Hull City Council · Local authority · Nationwide (UK), Yorkshire and the Humber
Incumbent: RIDGE AND PARTNERS LLP · Last contest: 18 bids (1 SME)
- Published value
- £88k
- Annual run-rate
- —start date not published
- Term
- Estimated end 21 Jun 2027 · start not published
- Reference
ocds-h6vhtk-02e22f
When contracts end · Architectural, construction, engineering i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
2,285 contracts and agreements end within 24 months, 3,292 in total · £790m published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services3,61279Business services: law, marketing, consulting2,65145Construction work2,08772IT services: consulting, software, internet1,61960Transport services (except waste transport)1,53771Architectural, construction, engineering1,41350Repair and maintenance services1,40680Education and training services1,254
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.