Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the next 12 months
Showing 1,126–1,150
- Estimated end · in 253 daysFramework recordPanel · 19 suppliers
SBC 0822 Framework agreement for the provision of Regeneration consultancy.
Stevenage Borough Council · Local authority · East of England
Panel: ARG Surveys Ltd, Arcadis UK Limited, BUILDING DESIGN PARTNERSHIP LTD +16 more
- Published value
- £10mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 7 Jul 2027 · start not published
- Reference
ocds-h6vhtk-03670c
- Estimated end · in 253 daysCall-off
Provision of Personal Protective Equipment, First Aid & Hygiene Supplies
Northern Powergrid Limited · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Incumbent not published · Last contest: 6 bids (2 SME)
- Published value
- £2.1mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 7 Jul 2027 · start not published
- Reference
ocds-h6vhtk-02874c
- Ends · in 256 days
Architectural review services
East Suffolk Council · Local authority · East of England
Incumbent: Hawkins & Associates Ltd
Architectural service to review designs, plans and offer advice.
- Published value
- £85k
- Annual run-rate
- £85kpublished value ÷ term, exc. VAT
- Term
- 11 Jul 2026 → 10 Jul 2027 · 1 yr
- Reference
ocds-h6vhtk-06decc
- Estimated end · in 258 daysFramework recordPanel · 3 suppliers
Building Safety Consultancy - Framework Agreement
Portsmouth City Council · Local authority · South East England
Panel: Bailey Partnership (consultants) LLP, FR Consultants, Vemco Consulting Ltd
- Published value
- £8.3mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 12 Jul 2027 · start not published
- Reference
ocds-h6vhtk-03c55f
- Ends · in 258 days
DDaT26398 - Web Hosting
UK Research and Innovation · Central government · Nationwide (UK)
Incumbent: S8080 Limited
***** THIS IS A CONTRACT DETAILS NOTICE, NOT A CALL FOR COMPETITION ***** This procurement is being concluded without competition due to an absence of competition for technical reasons, only a particular supplier can supply the goods, servi…
- Published value
- £16k
- Annual run-rate
- £16kpublished value ÷ term, exc. VAT
- Term
- 13 Jul 2026 → 12 Jul 2027 · 1 yr
- Reference
ocds-h6vhtk-06cbcc
- Ends · in 259 days
ECC043 - Quantity surveyor
Middlesbrough Council · Local authority · North East England
Incumbent: Atkins Limited
Direct award of specialist Quantity Surveying (QS) services to develop a robust and defensible cost estimate for the proposed bridge project Longland Road Bridge, supporting the Department for Transport (DfT) funding application submission …
- Published value
- £83k
- Annual run-rate
- £84kpublished value ÷ term, exc. VAT
- Term
- 15 Jul 2026 → 13 Jul 2027 · 1 yr
- Reference
ocds-h6vhtk-06e4f0
- Ends · in 259 days
UEOCS0575162026
University of Exeter · Central government
Incumbent: Arque Limited
LTM façade defects, project 129197, main contract - 25/26
- Published value
- £38k
- Annual run-rate
- £38kpublished value ÷ term, exc. VAT
- Term
- 13 Jul 2026 → 13 Jul 2027 · 1 yr
- Reference
ocds-h6vhtk-06f9eb
- Ends · in 259 days
NH2590 Backlog Maintenance 26/27 Cost Advisor / QS Scope of Services
Northumbria Healthcare Facilities Management · Central government
Incumbent: Rider Hunt (Newcastle) Limited
Cost Advisor / QS to support the project team in delivering the backlog maintenance programme 2026/27.
- Published value
- £38k
- Annual run-rate
- £38kpublished value ÷ term, exc. VAT
- Term
- 14 Jul 2026 → 13 Jul 2027 · 1 yr
- Reference
ocds-h6vhtk-06cc23
- Ends · in 260 days
Replacement and Upgrade to Emergency Lights in Linac Waiting Areas
The Christie NHS Foundation Trust · Central government
Incumbent: A COPELAND GROUP LIMITED
Replacement and Upgrade to Emergency Lights in Linac Waiting Areas
- Published value
- £37k
- Annual run-rate
- £37kpublished value ÷ term, exc. VAT
- Term
- 15 Jul 2026 → 14 Jul 2027 · 1 yr
- Reference
ocds-h6vhtk-0786b2
- Ends · in 261 days
CO2536 - Sarum NEC Supervisor
Wiltshire Council · Local authority · South West England
Incumbent: DACWS LIMITED
Nec Supervisor for Sarum academy educational supervisory services
- Published value
- £40k
- Annual run-rate
- £39kpublished value ÷ term, exc. VAT
- Term
- 15 Jul 2026 → 15 Jul 2027 · 1 yr
- Reference
ocds-h6vhtk-06bc2f
- Ends · in 261 days
UOECS0574572026
University of Exeter · Central government
Incumbent: Agt Electrical
LTM Accessibility project 131270 door access upgrade
- Published value
- £29k
- Annual run-rate
- £29kpublished value ÷ term, exc. VAT
- Term
- 15 Jul 2026 → 15 Jul 2027 · 1 yr
- Reference
ocds-h6vhtk-06fa07
- Ends · in 262 days
Procurement of Interim Range Safety Tool
Ministry of Defence · Central government · Nationwide (UK)
Incumbent: SIMCENTRIC LIMITED
The Authority have identified a need to procure a web-based application that can be accessed at any point nationally or internationally allowing the user to plan and produce a digital safe operating range danger area trace
- Published value
- £3.2m
- Annual run-rate
- £1.6mpublished value ÷ term, exc. VAT
- Term
- 17 Jul 2025 → 16 Jul 2027 · 2 yrs
- Reference
ocds-h6vhtk-0500b3
- Estimated end · in 263 days
MBTP Cyber Security Services
Home Office · Central government · Nationwide (UK)
Incumbent: Accenture UK Limited
- Published value
- £59m
- Annual run-rate
- —start date not published
- Term
- Estimated end 17 Jul 2027 · start not published
- Reference
ocds-h6vhtk-06f14b
- Estimated end · in 263 daysCall-off
OO 132kV non SF6 Gas Insulated Switchgear Supply at Alton Substation 0925
Southerne Electric Power Distribution plc · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Incumbent not published · Last contest: 6 bids (2 SME)
- Published value
- Not publishedvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 17 Jul 2027 · start not published
- Reference
ocds-h6vhtk-02874c
- Estimated end · in 264 days
Williamsburgh Housing Association - Two Year Contract for Landscape Maintenance Services
Williamsburgh Housing Association Ltd · Housing · Scotland
Incumbent: Caledonian Maintenance Services Ltd · Last contest: 2 bids (2 SME)
The Contract will principally comprise litter picking, grass cutting and leaf collection landscape maintenance services to existing properties and common landscaped areas throughout Paisley, Renfrew and Johnstone, Renfrewshire to the areas …
- Published value
- £98k
- Annual run-rate
- —start date not published
- Term
- Estimated end 18 Jul 2027 · start not published
- Reference
ocds-h6vhtk-03a137
- Ends · in 265 days
Green Infrastructure Stratedgy
North Kesteven District Council · Local authority · East Midlands
Incumbent: The Environment Partnership (TEP) Ltd
Consultancy for Green Infrastructure Stratedgy
- Published value
- £49k
- Annual run-rate
- £49kpublished value ÷ term, exc. VAT
- Term
- 20 Jul 2026 → 19 Jul 2027 · 1 yr
- Reference
ocds-h6vhtk-06c592
- Ends · in 265 days
UOECS0575452026
University of Exeter · Central government
Incumbent: CarneySweeney Limited
Learning Futures Building Project 127677 - construction method statement, ground conditions contamination, air quality assessment, permanent surface water drainage, maintenance arrangements, design of the proposed construction, arboricultur…
- Published value
- £42k
- Annual run-rate
- £42kpublished value ÷ term, exc. VAT
- Term
- 20 Jul 2026 → 19 Jul 2027 · 1 yr
- Reference
ocds-h6vhtk-06f9da
- Ends · in 265 days
Stockton on Tees Brough Council NHC Active Fire July 2026
COMMUNITY GATEWAY ASSOCIATION LIMITED · Other public body · Nationwide (UK)
Incumbent: FIRNTEC LTD
This contract details notice is to notify the market that Stockton on Tees Borough Council has appointed Fintec Limited for their Active Fire (2026-2030). This appointment has been made under the Northern Housing Consortium's Active Fire Fr…
- Published value
- £15k
- Annual run-rate
- £16kpublished value ÷ term, exc. VAT
- Term
- 20 Jul 2026 → 19 Jul 2027 · 1 yr
- Reference
ocds-h6vhtk-06cef7
- Ends · in 265 days
Stockton on Tees Borough Council NHC Active Fire July 2026
COMMUNITY GATEWAY ASSOCIATION LIMITED · Other public body · Nationwide (UK)
Incumbent: Tersus Consultancy Ltd
This contract details notice is to notify the market that Stockton on Tees Borough Council has appointed Tersus Consultancy Ltd for their Active Fire (2026-2030). This appointment has been made under the Northern Housing Consortium's Active…
- Published value
- £11k
- Annual run-rate
- £11kpublished value ÷ term, exc. VAT
- Term
- 20 Jul 2026 → 19 Jul 2027 · 1 yr
- Reference
ocds-h6vhtk-06ce7a
- Estimated end · in 266 days
Elderpark Housing Association - Landscape Maintenance Contract 2023-2025
Elderpark Housing Association · Housing · Scotland
Incumbent: Digby Landscaping · Last contest: 2 bids (2 SME)
The Contract will principally comprise litter picking, grass cutting, leaf collection, tree, shrub bed, planters and hedging landscape maintenance services to existing properties and common landscaped areas throughout Elderpark, Govan, Ibro…
- Published value
- £71k
- Annual run-rate
- —start date not published
- Term
- Estimated end 20 Jul 2027 · start not published
- Reference
ocds-h6vhtk-03c53e
- Ends · in 266 days
Gallery 33 Refurbishment: Design and Consultancy Services
Natural History Museum · Greater London
Incumbent: Studio Downie Architects LLP · Last contest: 16 bids (14 SME)
The Natural History Museum wishes to appoint a company to provide the services of Architect and Lead Designer, Building Safety Act Principal Designer, Structural Engineer and Sustainability Consultant for the refurbishment of Gallery 33 wit…
- Published value
- £223k
- Annual run-rate
- —start date not published
- Term
- Ends 20 Jul 2027 · start not published
- Reference
ocds-h6vhtk-04d69b
- Ends · in 266 daysExtension option · up to 20 Jul 2028
Penny Fields House - Architect
LATIMER DEVELOPMENTS LTD · Other public body
Incumbent: LRA Retinue
Architectural Services for Penny Fields House Remediation
- Published value
- £173k
- Annual run-rate
- £72kpublished value ÷ term, exc. VAT
- Term
- 1 Mar 2025 → 20 Jul 2027 · 2.4 yrs · up to 20 Jul 2028 with extensions
- Reference
ocds-h6vhtk-055457
- Ends · in 266 daysExtension option · up to 20 Jul 2028
Penny Fields House - Architect
LATIMER DEVELOPMENTS LTD · Other public body
Incumbent: LRA Retinue
Architectural Services for Penny Fields House Remediation
- Published value
- £173k
- Annual run-rate
- £72kpublished value ÷ term, exc. VAT
- Term
- 1 Mar 2025 → 20 Jul 2027 · 2.4 yrs · up to 20 Jul 2028 with extensions
- Reference
ocds-h6vhtk-055458
- Ends · in 266 daysExtension option · up to 20 Jul 2028
Penny Fields House - Architect
LATIMER DEVELOPMENTS LTD · Other public body
Incumbent: LRA Retinue
Architectural Services for Penny Fields House Remediation
- Published value
- £173k
- Annual run-rate
- £72kpublished value ÷ term, exc. VAT
- Term
- 1 Mar 2025 → 20 Jul 2027 · 2.4 yrs · up to 20 Jul 2028 with extensions
- Reference
ocds-h6vhtk-05545a
- Ends · in 266 days
South Downs Scaffold Yard Development - Architect
Brighton and Hove City Council · Local authority
Incumbent: Mackellar Schwerdt LLP
Brighton & Hove City Council plans to develop council-owned land along Bear Road, within the urban fringe and near the South Downs National Park, as part of the New Homes for Neighbourhoods Programme. The appointed consultant will work wit…
- Published value
- £24k
- Annual run-rate
- £12kpublished value ÷ term, exc. VAT
- Term
- 21 Jul 2025 → 20 Jul 2027 · 2 yrs
- Reference
ocds-h6vhtk-056629
When contracts end · Architectural, construction, engineering i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
2,285 contracts and agreements end within 24 months, 3,292 in total · £790m published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services3,61279Business services: law, marketing, consulting2,65145Construction work2,08772IT services: consulting, software, internet1,61960Transport services (except waste transport)1,53771Architectural, construction, engineering1,41350Repair and maintenance services1,40680Education and training services1,254
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.