Retender radar: UK public contracts ending soon

Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts matching “grounds maintenance”

Showing 121–135

  1. Ends · in 185 days

    Coffee 066-2024 Supply of Coffee Products at Manchester Central Convention Complex

    Manchester City Council · Local authority · North West England

    Incumbent: DC 7 Vending limited · Last contest: 10 bids (8 SME)

    Manchester Central is currently looking for a supplier to supply 13 Bean to Cup Coffee Machines & to supply…

    • Coffee, tea and related products
    Published value
    Not published
    Annual run-rate
    —value not published
    Term
    Ends 30 Apr 2027 · start not published
    Reference
    ocds-h6vhtk-0435ad
  2. Estimated end · in 195 days

    Galloway

    Historic Environment Scotland · Scotland

    Incumbent: Galloway Groundworks Ltd · Last contest: 2 bids (1 SME)

    Historic Environment Scotland is looking for a supplier/s to provide grounds maintenance services at multiple sites, split into 3 lots, across the South West…

    • Grounds maintenance services
    Published value
    £26k
    Annual run-rate
    —start date not published
    Term
    Estimated end 10 May 2027 · start not published
    Reference
    ocds-h6vhtk-04e3d1
  3. Estimated end · in 195 days

    Dumfries

    Historic Environment Scotland · Scotland

    Incumbent: Galloway Groundworks Ltd · Last contest: 2 bids (1 SME)

    Historic Environment Scotland is looking for a supplier/s to provide grounds maintenance services at multiple sites, split into 3 lots, across the South West…

    • Grounds maintenance services
    Published value
    £18k
    Annual run-rate
    —start date not published
    Term
    Estimated end 10 May 2027 · start not published
    Reference
    ocds-h6vhtk-04e3d1
  4. Estimated end · in 195 days

    Ayrshire

    Historic Environment Scotland · Scotland

    Incumbent: Galloway Groundworks Ltd · Last contest: 3 bids (2 SME)

    Historic Environment Scotland is looking for a supplier/s to provide grounds maintenance services at multiple sites, split into 3 lots, across the South West…

    • Grounds maintenance services
    Published value
    £15k
    Annual run-rate
    —start date not published
    Term
    Estimated end 10 May 2027 · start not published
    Reference
    ocds-h6vhtk-04e3d1
  5. Estimated end · in 197 days

    SCC AM Highways and Infrastructure Professional Services Contract

    Surrey County Council · Local authority · South East England

    Incumbent: Atkins Limited · Last contest: 3 bids (0 SME) · awarded 4% over the estimate

    As a Highway Authority Surrey County Council (the Client) delivers maintenance and improvements to the highways as part…

    • Highways consultancy services

    Re-procurement plannedHighways & Infrastructure Professional Services Contract · tender expected

    Published value
    £51m
    Annual run-rate
    —start date not published
    Term
    Estimated end 12 May 2027 · start not published
    Reference
    ocds-h6vhtk-02ecfd
  6. Estimated end · in 199 days

    WO0499 - Streetscene and Grounds Maintenance

    Wiltshire Council · Local authority · South West England

    Incumbent: idverde Ltd · Last contest: 3 bids (2 SME)

    Streetscene services, including rural and urban grass cutting, litter bin emptying, grounds maintenance, grave digging and playground and cemetery maintenance…

    • Horticultural services
    Published value
    Not published
    Annual run-rate
    —value not published
    Term
    Estimated end 14 May 2027 · start not published
    Reference
    ocds-h6vhtk-03110c
  7. Ends · in 216 daysCall-offPanel · 16 suppliers

    Lot 1 - Playground Equipment

    ESPO · Nationwide (UK)

    Panel: Dragon Play and Sports, Fawns Recreational Services Ltd, GARDEN ESCAPES IRELAND LTD +13 more · Last contest: 50 bids (48 SME)

    An ESPO national framework for the design, supply, delivery, installation, maintenance and inspection of Outdoor Playground Equipment, Outdoor…

    • Playground equipment
    Published value
    £140mvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 May 2027 · start not published
    Reference
    ocds-h6vhtk-04b234
  8. Ends · in 216 daysCall-offPanel · 9 suppliers

    Lot 7 - Wet pour Rubber Surfacing

    ESPO · Nationwide (UK)

    Panel: Abacus Playgrounds Ltd, Ace Play Limited, CREATIVE PLAY (UK) LIMITED +6 more · Last contest: 50 bids (48 SME)

    An ESPO national framework for the design, supply, delivery, installation, maintenance and inspection of Outdoor Playground Equipment, Outdoor…

    • Playground equipment
    Published value
    £140mvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 May 2027 · start not published
    Reference
    ocds-h6vhtk-04b234
  9. Ends · in 216 daysCall-offPanel · 12 suppliers

    Lot 8.1 - Sport and Play Surface - Synthetic Artificial Grass

    ESPO · Nationwide (UK)

    Panel: Abacus Playgrounds Ltd, Ace Play Limited, Axo Leisure Ltd +9 more · Last contest: 50 bids (48 SME)

    An ESPO national framework for the design, supply, delivery, installation, maintenance and inspection of Outdoor Playground Equipment, Outdoor…

    • Playground equipment
    Published value
    £140mvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 May 2027 · start not published
    Reference
    ocds-h6vhtk-04b234
  10. Ends · in 216 daysCall-offPanel · 10 suppliers

    Lot 8.2 - Sport and Play Surface - Needle Punched Carpet

    ESPO · Nationwide (UK)

    Panel: Abacus Playgrounds Ltd, Ace Play Limited, Axo Leisure Ltd +7 more · Last contest: 50 bids (48 SME)

    An ESPO national framework for the design, supply, delivery, installation, maintenance and inspection of Outdoor Playground Equipment, Outdoor…

    • Playground equipment
    Published value
    £140mvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 May 2027 · start not published
    Reference
    ocds-h6vhtk-04b234
  11. Ends · in 216 daysCall-offPanel · 9 suppliers

    Lot 9 - Football - 3rd Generation Synthetic Grass (3G) Pitch

    ESPO · Nationwide (UK)

    Panel: Abacus Playgrounds Ltd, Ace Play Limited, Axo Leisure Ltd +6 more · Last contest: 50 bids (48 SME)

    An ESPO national framework for the design, supply, delivery, installation, maintenance and inspection of Outdoor Playground Equipment, Outdoor…

    • Playground equipment
    Published value
    £140mvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 May 2027 · start not published
    Reference
    ocds-h6vhtk-04b234
  12. Ends · in 216 daysCall-offPanel · 6 suppliers

    Lot 10.1 - Tennis Courts - Macadam

    ESPO · Nationwide (UK)

    Panel: Abacus Playgrounds Ltd, Axo Leisure Ltd, Blakedown Sport & Play Limited +3 more · Last contest: 50 bids (48 SME)

    An ESPO national framework for the design, supply, delivery, installation, maintenance and inspection of Outdoor Playground Equipment, Outdoor…

    • Playground equipment
    Published value
    £140mvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 May 2027 · start not published
    Reference
    ocds-h6vhtk-04b234
  13. Ends · in 216 daysCall-offPanel · 6 suppliers

    Lot 10.2 - Tennis Courts - Synthetic Grass

    ESPO · Nationwide (UK)

    Panel: Abacus Playgrounds Ltd, Axo Leisure Ltd, Blakedown Sport & Play Limited +3 more · Last contest: 50 bids (48 SME)

    An ESPO national framework for the design, supply, delivery, installation, maintenance and inspection of Outdoor Playground Equipment, Outdoor…

    • Playground equipment
    Published value
    £140mvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 May 2027 · start not published
    Reference
    ocds-h6vhtk-04b234
  14. Ends · in 216 daysCall-offPanel · 12 suppliers

    Lot 2 - Bespoke Design Playground Equipment / Play areas

    ESPO · Nationwide (UK)

    Panel: Fawns Recreational Services Ltd, GARDEN ESCAPES IRELAND LTD, Greenspan Projects Ltd +9 more · Last contest: 50 bids (48 SME)

    An ESPO national framework for the design, supply, delivery, installation, maintenance and inspection of Outdoor Playground Equipment, Outdoor…

    • Playground equipment
    Published value
    £140mvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 May 2027 · start not published
    Reference
    ocds-h6vhtk-04b234
  15. Ends · in 216 daysCall-offPanel · 6 suppliers

    Lot 3.3 - Multi Use Games Area (MUGA) - Timber on Steel Frame - Macadam Surface

    ESPO · Nationwide (UK)

    Panel: Blakedown Sport & Play Limited, KOMPAN Limited, Playcubed Limited +3 more · Last contest: 50 bids (48 SME)

    An ESPO national framework for the design, supply, delivery, installation, maintenance and inspection of Outdoor Playground Equipment, Outdoor…

    • Playground equipment
    Published value
    £140mvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 May 2027 · start not published
    Reference
    ocds-h6vhtk-04b234
How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.