Find a TenderAwarded without competition
Published 16 Feb 2021, 16:11 GMT

Official UK procurement notice

6:1 Track Converging Conveyors

Official notice

Authority: Department of Health & Social Care (Central government)

GoodsAward procedure without prior publication of a call for competition
Awarded value£235,146published contract · exc. VAT
Awarded 20 Jan 2020no call for competition
Awarded to Converging Solutions Limited

What is being bought

Published requirement description

Provision of 6:1 Track Converging Conveyors

CPV: Electromechanical equipment

The lotProcurement structure

single lot · no lot value published
Lot #1Awarded
Delivery: UK

Procedure terms & legal framework

From the official record
Procedure method
Award procedure without prior publication of a call for competition
Legal basis
CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
Procurement category
Goods
Notice status
Awarded without competition
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Stand-alone contract (no framework)
Competition type
Direct award (no call for competition)
GPA / WTO covered
Yes (GPA)
Recurring procurement
Unspecified in notice
First published
16 Feb 2021, 16:11 GMT
Last source update
16 Feb 2021, 16:11 GMT
FTS notice number
2021/S 000-003126
Classification (CPV)
Electromechanical equipment
Delivery area
UK
Official registry OCID
ocds-h6vhtk-02939d Find a Tender
Why no open competition

Extreme urgency brought about by events unforeseeable for the contracting authority/entity and in accordance with the strict conditions stated in the directive

Published justification
  1. The COVID-19 outbreak is a Public Health Emergency of International Concern as declared by the World Health Organisation on 30 January 2020. The WHO Director General characterised COVID-19 as a pandemic on 11 March 2020.2. A key element of ensuring an effective response to the pandemic is ensuring that there is adequate testing. Therefore, ensuring surge LFT capacity, including sufficient availability of Lateral Flow Tests, is critical. 3. Mass testing of the UK Population is a key step in bringing the Pandemic under control. (Lateral Flow Tests produce quicker results than the current PCR (Polymerase Chain Reaction) test, and do not require a lab processing step.) LFT tests have only recently become viable as a means of testing, with multiple tests being progressed through to certification and approval. This was unforeseen by the DHSC and outside its control.4. Critical steps in the manufacture of LFT tests include automated dispensing of biologically active agents onto reels of backing material and laminating – this is termed Primary Manufacture.5. Further steps required include mounting the test strip in a cassette housing to allow handling, and foil wrapping with desiccant to protect the unit from dust and damp up to the point that it is used – this is termed Secondary manufacture.6. LFT Primary and Secondary Manufacturing equipment are in short supply. The existing supply chains of this equipment are volatile - there are few suppliers worldwide, their order books have long lead times, and what stocks of equipment there are, rapidly are sold. 7. Award of the contract to Converging Solutions Limited Ltd. for the purchase of Converging Conveyors was necessary with immediate effect to meet the timescales necessary for setting up viable production lines for early 2021. There is insufficient time to organise an advertised competition that would meet the required timescales.8. DHSC is satisfied the tests permitting use of the Negotiated procedure without prior publication (Regulation 32(2)(c)) are met:A. As far as is strictly necessary: The surge LFT capacity was identified as strictly necessary to meet the demand to scale up the testing programme in the UK.B. There are genuine reasons for extreme urgency: It is responding to COVID-19 immediately because of public health risks presenting a genuine emergency.C. The events that have led to the need for extreme urgency were unforeseeable: The Commission itself confirmed: “The current coronavirus crisis presents an extreme and unforeseeable urgency – precisely for such a situation our European rules enable public buyers to buy within a matter of days, even hours, if necessary.” (Commissioner Breton, Internal Market, 01.04.2020).D. It is impossible to comply with the usual timescales in the PCR: It is not possible to comply with the timescales of another procedure due to the urgent requirement to ensure effective surge capacity.E. The situation is not attributable to the contracting authority – DHSC has not done anything to cause or contribute to the need for extreme urgency"

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Awards 1
Awarded value £235,1461 contract exc. VAT
Bids received 1
Contracts signed 1latest 20 Jan 2020
Awarded toValueDateStatus
Converging Solutions LimitedSME£235,146 †—Awarded

Contracts

Bid statistics published by the authority

BidsSMEVCSEValid bid range
1bids———

Contracting authority & participating public bodies

Department of Health and Social Care

Contracting authorityCentral GovernmentMinistry or any other national or federal authority, including their regional or local subdivisionsHealth 39 Victoria Street, London, London, SW1H 0EUContact email

Dispute resolution & review bodies

  • The High CourtReview body London

Bidders & participating suppliers

1 commercial party on the notice
  • Converging Solutions LimitedAwarded supplier04157012 Unit 6a Waterloo Industrial Estate, Bidford On Avon, Alcester,, Warwickshire,, UK, B50 4JH

Official documents & specifications

Official links; attachments are not copied

No document links were published on the notice.