Archaeology Framework · UK public procurement notice
Authority: Highways England
What is being bought6 lots · detail below
Published requirement descriptionHighways England (HE) has a legal obligation to ensure that archaeological remains are preserved, and
recorded where new roads, motorway widening projects and trunk road improvements are built by providing
appropriate archaeological expertise, advice on design and contract documentation, supervising, monitoring,
search and recovery and reporting progress on all stages of work.
HE has highlighted the need for an archaeology framework with technically competent, capacity enabled
suppliers, to provide a consistent route across programmes/directorates, drive savings and build direct
relationships with suppliers. The framework will be enabled for use by Highways England other Contractors.
The framework will be composed of six lots. Work orders will be undertaken through lots 1a, 2a and 3a with
values based on individual Schemes within each lot:
Lot 1a: up to GBP 2 million,
Lot 2a: GBP 2 million — <GBP 5 million,
Lot 3a: GBP 5 million or more.
Time charge orders will be undertaken through lots 1b 2b and 3b.
CPV: Site-investigation services
Lots and requirements (6)Procurement structure
6 lots · no lot values published · same evaluation weights on every lotLot #1The scope of the services and works that will be delivered under the framework will…Awarded
The scope of the services and works that will be delivered under the framework will cover six stages:
Stage 1: The provision of general early-stage, desk-based advice on the production and costing of deliverables
and interventions to inform a submission.
Stage 2: Includes the provision of detailed assessment from the framework suppliers. This would cover the
range of skill sets not normally found ‘in-house’ within the client’s design-consultancy providers.
Stage 3: Detailed design and implementation of investigations. The framework suppliers supply non-intrusive
and intrusive archaeological investigations as appropriate.
Stage 4: Mitigation measures including:
- avoidance, preservation by burial or investigation in the case of archaeological remains;
- relocation, photographic or drawn to scale surveys in the case of historic buildings;
- recording, information panels or landscape works in the case of impacts on historic landscapes; and
- reduction to impact on setting through screening or landscaping.
Stage 5: Archaeological mitigation for on-site works
- preservation of archaeological sites in situ (some may require small scale investigation); and
- archaeological recording of assets to be removed by the package contract.
Stage 6: Archaeological mitigation programme for off-site works
- preliminary processing of excavated material and data;
- post-fieldwork assessment;
- analysis and publication; and
- public archaeology and community engagement.
Where archaeological remains are to be preserved in situ the archaeological. Supplier may be required to
undertake or monitor other suppliers’ activities. Additional information: Lot 1a is for schemes of value < 2 million. As the roads investment strategy 2 period progresses Highways
England reserves the right to transfer any unallocated value between lots to fund additional schemes. When
considering potential value of work which may be won by a successful supplier, tenderers should consider the
total expected value of the framework as well as the relevant lot.
Lot #2The scope of all lots covers six stages:Awarded
The scope of all lots covers six stages:
Stage 1: The provision of general early-stage, desk-based advice on the production and costing of deliverables
and interventions to inform a submission.
Stage 2: Includes the provision of detailed assessment from the framework suppliers. This would cover the
range of skill sets not normally found ‘in-house’ within the Client’s design-consultancy providers.
Stage 3: Detailed design and implementation of investigations. The framework suppliers supply non-intrusive
and intrusive archaeological investigations as appropriate.
Stage 4: Mitigation measures including:
- avoidance, preservation by burial or investigation in the case of archaeological remains;
- relocation, photographic or drawn to scale surveys in the case of historic buildings;
- recording, information panels or landscape works in the case of impacts on historic landscapes; and
- reduction to impact on setting through screening or landscaping.
Stage 5: archaeological mitigation for on-site works:
- preservation of archaeological sites in situ (some may require small scale investigation); and
- archaeological recording of assets to be removed by the package contract.
Stage 6: archaeological mitigation programme for off-site works
- preliminary processing of excavated material and data;
- post-fieldwork assessment;
- analysis and publication; and
- public archaeology and community engagement.
Where archaeological remains are to be preserved in situ the archaeological supplier may be required to
undertake or monitor other suppliers’ activities.
Lot #3The scope of all lots covers six stages:Awarded
The scope of all lots covers six stages:
Stage 1: The provision of general early-stage, desk-based advice on the production and costing of deliverables
and interventions to inform a submission.
Stage 2: Includes the provision of detailed assessment from the framework suppliers. This would cover the
range of skill sets not normally found ‘in-house’ within the Client’s design-consultancy providers.
Stage 3: Detailed design and implementation of investigations. The framework suppliers supply non-intrusive
and intrusive archaeological investigations as appropriate.
Stage 4: Mitigation measures including:
- avoidance, preservation by burial or investigation in the case of archaeological remains;
- relocation, photographic or drawn to scale surveys in the case of historic buildings;
- recording, information panels or landscape works in the case of impacts on historic landscapes; and
- reduction to impact on setting through screening or landscaping.
Stage 5: archaeological mitigation for on-site works:
- preservation of archaeological sites in situ (some may require small scale investigation); and
- archaeological recording of assets to be removed by the package contract.
Stage 6: archaeological mitigation programme for off-site works
- preliminary processing of excavated material and data;
- post-fieldwork assessment;
- analysis and publication; and
- public archaeology and community engagement.
Where archaeological remains are to be preserved in situ the archaeological supplier may be required to
undertake or monitor other suppliers’ activities Additional information: Lot 2a is for schemes of value GBP 2 million — < GBP 5 million. As the roads investment strategy 2 period
progresses Highways England reserves the right to transfer any unallocated value between lots to fund
additional schemes. When considering potential value of work which may be won by a supplier,
tenderers to consider the total expected value of the framework as well as the relevant lot
Lot #4The scope of all lots covers six stages: Stage 1: The provision of general…Awarded
The scope of all lots covers six stages: Stage 1: The provision of general early-stage, desk-based advice on the production and costing of deliverables and interventions to inform a submission. Stage 2: Includes the provision of detailed assessment from the framework suppliers. This would cover the range of skill sets not normally found ‘in-house’ within the Client’s design-consultancy providers. Stage 3: Detailed design and implementation of investigations. The framework suppliers supply non-intrusive and intrusive archaeological investigations as appropriate. Stage 4: Mitigation measures including:
- avoidance, preservation by burial or investigation in the case of archaeological remains;
- relocation, photographic or drawn to scale surveys in the case of historic buildings;
- recording, information panels or landscape works in the case of impacts on historic landscapes; and
- reduction to impact on setting through screening or landscaping. Stage 5: archaeological mitigation for on-site works:
- preservation of archaeological sites in situ (some may require small scale investigation); and
- archaeological recording of assets to be removed by the package contract. Stage 6: archaeological mitigation programme for off-site works
- preliminary processing of excavated material and data;
- post-fieldwork assessment;
- analysis and publication; and
- public archaeology and community engagement. Where archaeological remains are to be preserved in situ the archaeological supplier may be required to undertake or monitor other suppliers’ activities
Lot #5The scope of all lots covers six stages: Stage 1: The provision of general…Awarded
The scope of all lots covers six stages: Stage 1: The provision of general early-stage, desk-based advice on the production and costing of deliverables and interventions to inform a submission. Stage 2: Includes the provision of detailed assessment from the framework suppliers. This would cover the range of skill sets not normally found ‘in-house’ within the Client’s design-consultancy providers. Stage 3: Detailed design and implementation of investigations. The framework suppliers supply non-intrusive and intrusive archaeological investigations as appropriate. Stage 4: Mitigation measures including:
- avoidance, preservation by burial or investigation in the case of archaeological remains;
- relocation, photographic or drawn to scale surveys in the case of historic buildings;
- recording, information panels or landscape works in the case of impacts on historic landscapes; and
- reduction to impact on setting through screening or landscaping. Stage 5: archaeological mitigation for on-site works:
- preservation of archaeological sites in situ (some may require small scale investigation); and
- archaeological recording of assets to be removed by the package contract. Stage 6: archaeological mitigation programme for off-site works
- preliminary processing of excavated material and data;
- post-fieldwork assessment;
- analysis and publication; and
- public archaeology and community engagement. Where archaeological remains are to be preserved in situ the archaeological supplier may be required to undertake or monitor other suppliers’ activities. Additional information: Lot 3a is for schemes of value > GBP 5 million. As the roads investment strategy 2 period progresses Highways
England reserves the right to transfer any unallocated value between lots to fund additional schemes. When
considering potential value of work which may be won by a successful supplier, tenderers should consider the
total expected value of the framework as well as the relevant lot.
Lot #6The scope of all lots covers six stages: Stage 1: The provision of general…Awarded
The scope of all lots covers six stages: Stage 1: The provision of general early-stage, desk-based advice on the production and costing of deliverables and interventions to inform a submission. Stage 2: Includes the provision of detailed assessment from the framework suppliers. This would cover the range of skill sets not normally found ‘in-house’ within the Client’s design-consultancy providers. Stage 3: Detailed design and implementation of investigations. The framework suppliers supply non-intrusive and intrusive archaeological investigations as appropriate. Stage 4: Mitigation measures including:
- avoidance, preservation by burial or investigation in the case of archaeological remains;
- relocation, photographic or drawn to scale surveys in the case of historic buildings;
- recording, information panels or landscape works in the case of impacts on historic landscapes; and
- reduction to impact on setting through screening or landscaping. Stage 5: archaeological mitigation for on-site works:
- preservation of archaeological sites in situ (some may require small scale investigation); and
- archaeological recording of assets to be removed by the package contract. Stage 6: archaeological mitigation programme for off-site works
- preliminary processing of excavated material and data;
- post-fieldwork assessment;
- analysis and publication; and
- public archaeology and community engagement. Where archaeological remains are to be preserved in situ the archaeological supplier may be required to undertake or monitor other suppliers’ activities
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Published award criteria (2)
- Quality: 70
- Price: 30
- Price carries 30 of 100 points: a 10% discount moves about 3 points. The method statement decides this lot, not the discount.
- “Archaeology Framework” is a framework: the contest is a place on its panel, not a single contract.
Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.
Procedure terms & legal framework
From the official record- Procedure method
- Open procedure
- Legal basis
- CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
- Procurement category
- Services
- Notice status
- Awarded
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Framework agreement
- Who may use this agreement
- Not stated in the notice; call-off rights may be limited to the establishing authority
- Competition type
- Competitive procedure
- GPA / WTO covered
- Unspecified in notice
- Recurring procurement
- Unspecified in notice
- First published
- 20 Apr 2021, 22:55 BST
- Last source update
- 20 Apr 2021, 22:55 BST
- FTS notice number
2021/S 000-008404- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-02a845Find a Tender
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast6 suppliers are admitted to this framework without individual award values or dates, see the supplier list below.
Contracts
All 2 of these contracts carry the same published figure, £19,000,000, the framework's maximum for the whole notice, not each contract's own value. They are not eleven separate sums.
Archaeology Framework Lot 1a
- Signed
- 14 Sept 2020
- Value
- ceiling above
- Status
- active
Archaeology Framework Lot 1b
- Signed
- 14 Sept 2020
- Value
- £16,000,000
- Status
- active
Contract 008404-2021-3
- Signed
- 14 Sept 2020
- Value
- £72,000,000
- Status
- active
Archaeology Framework Lot 2b
- Signed
- 14 Sept 2020
- Value
- ceiling above
- Status
- active
Archaeology Framework Lot 3a
- Signed
- 14 Sept 2020
- Value
- £159,000,000
- Status
- active
Archaeology Framework Lot 3b
- Signed
- 14 Sept 2020
- Value
- £7,200,000
- Status
- active
Bid statistics published by the authority
| Lot | Bids | SME | VCSE | Valid bid range |
|---|---|---|---|---|
| 1 · The scope of the services and works that will be delivered under the framework will… | 8bids | — | — | — |
| 2 · The scope of all lots covers six stages: | 8bids | — | — | — |
| 3 · The scope of all lots covers six stages: | 8bids | — | — | — |
| 4 · The scope of all lots covers six stages: Stage 1: The provision of general… | 8bids | — | — | — |
| 5 · The scope of all lots covers six stages: Stage 1: The provision of general… | 8bids | — | — | — |
| 6 · The scope of all lots covers six stages: Stage 1: The provision of general… | 8bids | — | — | — |
Contracting authority & participating public bodies
Framework contractors & participating bidders
8 commercial parties on the notice- Aecom LtdFramework contractor
- Archaeological Management SolutionsFramework contractor
- Archaeological Management SolutionsFramework contractor
- Connect Archaeology LLPFramework contractor
- Headland ArchaeologyFramework contractor
- Infra JVFramework contractor
- Museum of London ArchaeologyFramework contractor
- OCA JVFramework contractor
Official documents & specifications
Official links; attachments are not copiedNo document links were published on the notice.