Official UK procurement notice
Asset Inspection, Testing & Portfolio Management
Authority: Scottish Water
What is being bought
Published requirement descriptionAsset Inspection, Testing & Portfolio Management
CPV: Technical inspection and testing services
How this framework works
From the published notice- Places
- up to 1 suppliers
The lotProcurement structure
single lot · value publishedLot #1Asset Inspection, Testing & Portfolio ManagementRenewalPublished value£140,000,000
Asset Inspection, Testing & Portfolio Management
Scottish Water has a large asset base used to deliver services to customers which requires suppliers to provide project specific asset inspection and testing services for both above ground and underground assets including, but not limited to asset grouping found within table 1.
Depending on the number of inspections and required timescales this may be a rolling programme to deliver a fixed number each year, or a one-off programme.
Table 1 – Asset List
Civil/ Structural Pipelines Chemical Dosing Tanks Boreholes
WW & W Pipebridges WW &W Pipebridges WW Secondary Treatment Chemical Dosing Water Supply Boreholes
WW Inlet Works WW Pumping Mains WTW Chemical Dosing Systems
WW Pumping Stations Strategic Infrastructure WW Ancillaries Chemical Dosing Tanks
(Trunk & Raw Mains)
WW Sludge Centres Water Pumping (Pipework)
Strategic Infrastructure Tunnels/ Aqueducts
(Raw intakes)
Filtration (sand filters)
Treated Water Storage
(Prestressed/post-tensioned assets,
water towers)
Chlorine Contact Tanks
WW Primary Treatment
WW Secondary Treatment
WW Ancillaries
Water Pumping (civils)
WW Sewer Structures
Raw Water Storage
WTW Process
Stage Civil
Water & Wastewater Property
(Roads/ Bridges)
Scope
Scottish Water intend to undertake regular Inspections of our asset base in line with the SW Asset Management Strategy and as detailed within SW’s Management Approaches. The Inspections shall be used to understand the condition of our assets, which in turn will be used to better understand Service Risks to our customers and to prioritise future Investment in our assets. The Asset Inspections shall be undertaken at regular intervals and over time will be used to understand rates of deterioration and inform predictive analytical systems which will be used to inform future decisions.
The Supplier shall be required to plan, manage, undertake and report on the Asset Inspections including the confirmation of the asset condition grade, the remaining useful life of the asset along with recommendations for future work or investment on the asset. The scope of the Inspection activities is listed below and within the Inspection Guidance Documents (refer Section 8.1):
Planning and coordination of inspection
1.Source and review existing asset information to enable planning of inspections activities oIdentify / understand constraints impacting the inspection
activities (i.e. this could include but not be limited to constraints relating to isolating processes / equipment for inspection, impact on the performance of
the asset or works, access, operational support, enabling activities etc). Constraints shall be shown on the Inspections Schedule.
2.Site visit if required in order to plan the inspection activities and scope the enabling activities
- Scheduling of inspections. The Inspections Schedule shall be updated to reflect any changes to the programme of inspections and shall be used to
coordinate the actives of the parties involved in the Inspections
4.Liaison with SW and Operational Staff to give advance notice of any inspection as well as to facilitate the inspection activities
5.Arrange and agree site access with SW Operational Staff
6.Liaison with 3rd Party’s where required to undertake the inspections (i.e. landowners, tenants, Local Authorities, SEPA etc.)
7.Secure Permissions required to undertake the Inspections. This shall include compliance with SW’s Limitation of Access, Access Transfer TOMS and
DOMS procedures which govern and control access to SW’s Assets. In addition, this shall include third party permissions (i.e. SEPA CAR Licences,
NRSWA, Planning etc.) which may be required for specific asset inspections.
8.H&S Planning including the development of a SSOW, Risk Assessment and Method Statements.
9.Where the Inspections activities are deemed to fall under the requirements of the CDM Regulations 2015 (i.e. penetrative inspections etc.) and there is
no requirement for an Enabling Contractor, the Supplier shall be appointed to the role of Principal Contractor under the CDM Regulations.
The Supplier will discharge its duties in-line with this.
1.Identify and develop scope for any enabling activities required to facilitate the site-based inspections
2.Enabling activities may be required in order to facilitate the inspection works. This could include cleaning and emptying of processes, excavations,
erection of scaffolding etc.
3.The Supplier shall develop a scope of works detailing the enabling works required to facilitate the Inspection activities.
4.For the avoidance of doubt the Supplier shall not be expected to undertake the enabling activities. The Enabling Works Scope shall be issued to the
Client who will engage a SW Framework Construction Delivery Partner to carry out the enabling activities.
5.Where enabling activities are required it is anticipated that the Enabling Contractor shall assume the role of the Principal Contractor in line with the
CDM Regulations 2015 for both the enabling and inspection activities. In such circumstances the Supplier shall be employed directly by the SW
Framework Construction Delivery Partner undertaking the enabling works.
6.Undertake site-based inspection works in line with the Inspection Guidance Documents
7.The scope of Inspection Activities shall either be the Routine Visual Inspection or the Full Detailed Inspection as defined in the call off documentation
8.Use of site-based apps for data collection where appropriate (Initially Fulcrum shall be used). As part of SW digital transformation plan the use of site-
based apps will be reviewed and updated to align with SW’s futur…
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
- Condition of participationno text publishedMinimum: Applicants will be expected to be of sufficient financial and economic standing to support the anticipated contract value. All applicants must complete the financial questions within the pre-qualification questionnaire and tender documents. Financial standing relevant to the anti…
- Legal form for consortia
- In the event of a group of companies submitting an accepted offer it will be necessary for each member of the group to sign an undertaking that each company in the group will be jointly and severally liable for the satisfactory performance of the contract
- “Asset Inspection, Testing & Portfolio Management” is a framework: the contest is a place on its panel, up to 1 suppliers, not a single contract.
Procedure terms & legal framework
From the official record · publisher note attached- Procedure method
- Negotiated procedure with prior call for competition
- Legal basis
- CELEX · 32014L0025 Utilities Contracts Regulations 2016 (Directive 2014/25/EU)
- Procurement category
- Services
- Notice status
- Closed
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Framework agreement
- Who may use this agreement
- Not stated in the notice; call-off rights may be limited to the establishing authority
- Competition type
- Competitive procedure
- GPA / WTO covered
- Yes (GPA)
- Recurring procurement
- No (one-off requirement)
- First published
- 23 May 2022, 16:05 BST
- Last source update
- 23 May 2022, 16:05 BST
- Authority reference
SW22/CI/1412- FTS notice number
2022/S 000-013899- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-033cf0Find a Tender- Contract terms summary
All prices quoted shall be in Sterling (UK) and all payments shall be made in Sterling (UK). Payment shall be made on the basis of completed services in accordance with the agreed contract rates, schedules and conditions of contract
- Electronic trading
- e-invoicing allowed · electronic ordering · electronic payment
- Performance terms
Bidders must comply with modern slavery act and operate an ethical supply chain
Publisher note: Scottish Water will not accept the SPD. We will only accept a completed Scottish Water ITN document. This Notice does not preclude Scottish Water from issuing other notices for specific requirements. Responses to the FTS Notice will be evaluated and applicants who fail to supply all of the information requested in response to this Notice or any resulting exercise may risk elimination For more information about this opportunity, please visit the Delta eSourcing portal at: https://scottishwater.delta-esourcing.com/tenders/UK-UK-Glasgow:-Technical-inspection-and-testing-services.-*Duplicated*/69P9HQYS79 To respond to this opportunity, please click here: https://scottishwater.delta-esourcing.com/respond/69P9HQYS79 GO Reference: GO-2022523-PRO-20184291
How it was run
Official notice- Appointment period ends
- 1 Jul 2022, 13:00 BST
- Submission channel
- {"electronicSubmission","written"}
- Accepted languages
- en
- Deposits and guarantees
Scottish Water reserves the right to require deposits, guarantees, bonds or other forms of appropriate security
Timeline
23 May 2022 → 1 Jul 2022 · 2 dates- Notice published23 May 2022, 16:05 BST
- Admission / appointment period endsperiod end, not a bid countdown1 Jul 2022, 13:00 BST
Contracting authority & participating public bodies
Dispute resolution & review bodies
- Glasgow Sheriff CourtReview body
Official documents & specifications (1)
Official links; attachments are not copiedTender pack and attachments
- Technical selection criteria