Black Start Infrastructure and Gas engines in Northern Ireland

Official notice

Authority: EP UK INVESTMENTS LTD

ServicesNegotiated procedure with prior call for competition
Budget not disclosedValue not published
Submissions closed 31 May 2021

What is being bought

Published requirement description

EPUKI on behalf of EPKL (together, the "Client") is inviting qualification responses from Economic Operators to Engineer, Procure and Construct (EPC) electrical infrastructure associated with black start and the provision of a new containerised Gas Engine package to provide the site standing loads which have a range from circa 1MW to 3.5MW at its Kilroot site in Northern Ireland ("Procurement"). This package of work forms part of a wider site programme.

CPV: Installation services of electric motors, generators and transformers

The lotProcurement structure

single lot · no lot value published
Lot #1Kilroot Power station has 2 coal fired units, 4 GT units and a Battery Energy Storage…

Kilroot Power station has 2 coal fired units, 4 GT units and a Battery Energy Storage System ("BESS"). Soon the 2 coal fired units may be decommissioned and 1 or 2 new gas-fired Open Cycle Gas Turbine ("OCGT") 4 peaking units will be installed. These are referred to as OCGT6 and OCGT7 in this document. The 4 existing GT units (GT1 to GT4) will remain and continue to provide services to SONI along with the BESS.

Figure 2 (below) provides a general layout of the Kilroot site. The 275kV Kilroot substation is located to the north of the site and enclosed within its own building. The location for the new OCGTs is within the existing turbine building for the coal fired power station. When Kilroot was originally built one half of the building was fitted out with two coal fired units. The other half of the building remained empty except for being used for storage / workshop.

The existing GT units, GT1 to GT4, are located to the south east side of the site. GT1 and GT2 are located within a building and connected to the 275kV grid via the coal station electrical systems. GT3 and GT3 are located in separate cabinets, north of the building which houses GT1 and GT2. and connected to the 275kV grid via a common grid connection that is independent to the coal station. The step-up transformer for GT3 and GT4 is located just to the north of GT3 and GT4, this compound also has the 275kV cable sealing ends.

The BESS system is physically located in the coal station and connected into one of the coal unit electrical systems for import and export.

There is currently no natural gas onsite, however a natural gas supply will be brought onto the Kilroot site for the new OCGTs and gas engine package.

The works will be undertaken on an operational Power Station Site.

Further detail in relation to the Client requirements can be found in the Market Brochure appended to this SQ. The technical specifications for the Procurement will be formally issued to all Economic Operators shortlisted for the tender stage.

Variant bids: allowed

Procedure terms & legal framework

From the official record
Procedure method
Negotiated procedure with prior call for competition
Legal basis
CELEX · 32014L0025 Utilities Contracts Regulations 2016 (Directive 2014/25/EU)
Procurement category
Services
Notice status
Closed
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Stand-alone contract (no framework)
Competition type
Competitive procedure
GPA / WTO covered
Unspecified in notice
Recurring procurement
No (one-off requirement)
First published
14 May 2021, 15:14 BST
Last source update
14 May 2021, 15:14 BST
FTS notice number
2021/S 000-010709
Classification (CPV)
Installation services of electric motors, generators and transformers
Delivery area
Northern Ireland (UKN)
Official registry OCID
ocds-h6vhtk-02b146 Find a Tender

How it was run

Official notice
Run through: portal not identified
Language: EN
Submission deadline
31 May 2021, 12:00 BST
Submission channel
{"electronicSubmission"}
Accepted languages
en
Detailed submission instructions & authority contactsFrom official release

Timeline

14 May 2021 → 31 May 2021 · 2 dates
  1. Notice published
    14 May 2021, 15:14 BST
  2. Submission deadline
    31 May 2021, 12:00 BST

Contracting authority & participating public bodies

EP UK INVESTMENTS LTD

Contracting authorityElectricity Byron House,7-9 St. James's Street, LONDON, Northern Ireland, SW1A1EEContact name, email, phone Published organisation website ↗

Dispute resolution & review bodies

  • High Court of Justice in Northern IrelandReview body Belfast

Official documents & specifications

Official links; attachments are not copied

No document links were published on the notice.