Official UK procurement notice
Construction of a New Bus Maintenance Depot and Ancillary Bus Parking Areas
Authority: Warrington Borough Council (Local council)
What is being bought
Published requirement descriptionConstruction of a New Bus Maintenance Depot and Ancillary Bus Parking Areas
The facility will be a new purpose built bus maintenance depot initially supporting the existing diesel powered bus fleet of Warrington’s Own Buses and will incorporate infrastructure to accommodate an all-electric fleet of buses in the future. Warrington’s Own Buses will migrate to the new depot upon completion.
The facility will comprise of a three storey building combining a maintenance workshop complete with specialist maintenance equipment, ancillary offices and staff/driver welfare facilities, MOT centre and storage, a single storey service building for fuelling and washing buses and external areas comprising extensive bus open storage and general service yard, staff car parking, re-configuration and widening of vehicular accesses; fencing (including acoustic fencing), lighting, a new substation building and all associated and ancillary works.
CPV: Construction work
The lotProcurement structure
single lot · no lot value publishedLot #1Awarded
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Published sub-criteria (2)
- Quality is not the only award criterion and all criteria are stated only in the procurement documents: 45%
- price: 55%
Published award criteria (2)
- Quality is not the only award criterion and all criteria are stated only in the procurement documents: 45
- Price: 55
- Price carries 55 of 100 points: a 10% discount moves about 5.5 points. This one is won on the number: sharpen the price before polishing the prose.
Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.
Procedure terms & legal framework
From the official record- Procedure method
- Restricted procedure
- Legal basis
- CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
- Procurement category
- Works
- Notice status
- Awarded
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Competitive procedure
- GPA / WTO covered
- Yes (GPA)
- Recurring procurement
- Unspecified in notice
- First published
- 22 Apr 2022, 15:40 BST
- Last source update
- 22 Apr 2022, 15:40 BST
- Authority reference
DN514427- FTS notice number
2022/S 000-010511- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-032fadFind a Tender
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast| Awarded to | Value | Date | Status |
|---|---|---|---|
| Walter Carefoot & Sons (Construction) LtdSME | £8,045,102 † | — | Awarded |
Contracts
Contract 010511-2022-DN514427-1 · Walter Carefoot & Sons (Construction) LtdSME
- Signed
- 19 Oct 2021
- Value
- £8,045,102
- Status
- active
Bid statistics published by the authority
| Bids | SME | VCSE | Valid bid range |
|---|---|---|---|
| 4bids · 4 electronic | 0 | — | — |
Contracting authority & participating public bodies
Bidders & participating suppliers
1 commercial party on the notice- Walter Carefoot & Sons (Construction) LtdAwarded supplier
Official documents & specifications
Official links; attachments are not copiedNo document links were published on the notice.