Official UK procurement notice
ESND - Provision of Electronic Counter Measures (ECM)
Authority: Foreign, Commonwealth and Development Office (Central government)
What is being bought
Published requirement descriptionThe FCDO seeks to engage with UK ECM equipment manufacturers who have developed and are currently manufacturing next generation commercial off the shelf (COTS) ECM equipment in the UK. Engagement is requested from UK companies that hold UK List X status and who are currently manufacturing next generation ECM equipment at a technology readiness level (TRL) of 8 (TRL 8 – actual technology completed and qualified through test and demonstration).
The FCDO utilises ECM in some operational environments in civilian armoured vehicles (CAV) and is seeking to engage with suppliers of ECM systems to replace the current capability with a next generation ECM system, which must meet the following criteria:
- The ECM System must be UK manufactured.
- The capability must be evergreen. It must be modular and upgradeable to facilitate capability uplift in the face of new or emerging threats.
- The system must be able to operate within a frequency range of 20Mhz to 6Ghz and be extendible should the FCDO wish to add additional modules to increase the system capability beyond 6Ghz if required.
- The ECM systems must be designed using open architecture protocols and standards.
- The system must be reconfigurable and programmable within the area of operations to implement an appropriate threat response to defeat existing or new threat systems.
- It is desirable for the system be able to detect and log threat frequency equipment activation events when the system is in operation (providing inhibition) and record these events by frequency and GPS location to assist in developing a location specific threat map. Information should be able to be viewed post mission with generic or supplier provided digital mapping software.
- The supplier must have a pedigree in the supply of ECM systems to NATO countries and be able to evidence previous installations in CAVs and the integration of other vehicle systems such as radio communications and tracking equipment.
- The supplier will be required to integrate and maintain the ECM system and FCDO CAV communications and tracking systems for a minimum of 5 years and have a pedigree in supporting their systems in a similar manner.
- The supplier must be prepared to have their ECM system independently assessed for technical capability at no cost to the FCDO.
CPV: Electronic warfare systems and counter measures
The lotProcurement structure
single lot · no lot value publishedLot #1The FCDO utilises ECM in some operational environments in civilian armoured vehicles…Renewal
The FCDO utilises ECM in some operational environments in civilian armoured vehicles (CAV) and is seeking to engage with suppliers of ECM systems to replace the current capability with a next generation ECM system, which must meet the following criteria:
- The ECM System must be UK manufactured.
- The capability must be evergreen. It must be modular and upgradeable to facilitate capability uplift in the face of new or emerging threats.
- The system must be able to operate within a frequency range of 20Mhz to 6Ghz and be extendible should the FCDO wish to add additional modules to increase the system capability beyond 6Ghz if required.
- The ECM systems must be designed using open architecture protocols and standards.
- The system must be reconfigurable and programmable within the area of operations to implement an appropriate threat response to defeat existing or new threat systems.
- It is desirable for the system be able to detect and log threat frequency equipment activation events when the system is in operation (providing inhibition) and record these events by frequency and GPS location to assist in developing a location specific threat map. Information should be able to be viewed post mission with generic or supplier provided digital mapping software.
- The supplier must have a pedigree in the supply of ECM systems to NATO countries and be able to evidence previous installations in CAVs and the integration of other vehicle systems such as radio communications and tracking equipment.
- The supplier will be required to integrate and maintain the ECM system and FCDO CAV communications and tracking systems for a minimum of 5 years and have a pedigree in supporting their systems in a similar manner.
- The supplier must be prepared to have their ECM system independently assessed for technical capability at no cost to the FCDO.
The FCDO plans to tender the requirement for up to 100 systems in September 2021. FCDO will not hold a supplier day prior to the ITT release date and the ITT will be restricted to those bidders identified as having the technical capability and ECM systems that meet the baseline requirements listed above.
Procedure terms & legal framework
From the official record- Procedure method
- Restricted procedure
- Legal basis
- CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
- Procurement category
- Goods
- Notice status
- Closed
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Competitive procedure
- GPA / WTO covered
- Yes (GPA)
- Recurring procurement
- No (one-off requirement)
- First published
- 13 Sept 2021, 22:45 BST
- Last source update
- 13 Sept 2021, 22:45 BST
- FTS notice number
2021/S 000-022736- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-02e03fFind a Tender
How it was run
Official notice- Submission deadline
- 12 Oct 2021, 17:00 BST
- Submission channel
- {"electronicSubmission","written"}
- Accepted languages
- en
- Participation fee
- document
- Bid validity
- 180 days from the deadline
Timeline
13 Sept 2021 → 12 Oct 2021 · 2 dates- Notice published13 Sept 2021, 22:45 BST
- Submission deadline12 Oct 2021, 17:00 BST
Contracting authority & participating public bodies
Official documents & specifications
Official links; attachments are not copiedNo document links were published on the notice.