Find a TenderClosedTender notice
Published 6 May 2026, 20:01 BST

Official UK procurement notice

GWR - Re-deployment of Mobile shore supplies for Class 802

Official notice

Authority: FIRST GREATER WESTERN LIMITED (Public body)

ServicesCompetitive flexible procedureAbove thresholdUtilities
Sectors: Installation services (except software) (51) Delivery: Delivery location not published
Published estimate£1,600,000≈ £800k / year · £1,600,000 inc. VAT
Submissions closed 10 Jun 2026
Contract term 2 yrsends 9 Sept 2028 · up to 9 Sept 2030 with extensions · starts 10 Sept 2026

What is being bought

Published requirement description

This tender is for costed bids for the re-deployment of shore supplies in three work packages at Taunton Fair Water Yard, Bristol Temple Meads Station, Hackney Sidings and Swindon Transfer Sidings.

Work Package 1:

Hire of Diesel Generators, 3000 litre self-bunded tank and distribution board supply. To include delivery, and installation, fuel, and power monitoring (telemetry) as well as support for the duration of the blockade.

Work package 2:

Arrange for the collection and delivery of GWR's 400vac Mobile Shore Supply equipment from our storage facility at Reading for delivery to the sites at Bristol, Taunton and Swindon Transfer Sidings and or Hackney Sidings if required.

Work package 3:

Re-installation/site set up as per the AFC layout designs and electrical connections at each stabling location. This works package shall include logistics for the subsequent removal of the equipment and re delivery to the Reading storage facility.

  • How the procedure runs: A Contract Notice will be published inviting suppliers to express an interest in participating in the procurement. Suppliers who express interest during the Expression of Interest (EOI) period will be added to the tender list on a rolling basis as quickly as reasonably practicable following receipt of their request. Upon being added to the tender portal, suppliers will immediately be granted access to the tender documentation to allow early review and preparation of their submissions. The EOI period will remain open for a minimum of 25 days. Following closure of the EOI period, tenderers will be provided with a minimum of seven (7) calendar days to finalise and submit their tender responses. The procedure will comprise a single tender submission stage. Submitted tenders will be evaluated against the published award criteria, including quality and commercial considerations. Clarification questions may be raised with bidders during the evaluation process to ensure a full understanding of submitted responses. The Authority reserves the right to undertake limited negotiation or refinement with the preferred bidder(s) in relation to contractual, technical, commercial, or delivery matters, provided this does not materially alter the scope of the procurement or distort competition. Following evaluation and any necessary clarification or negotiation activities, the Authority will identify the Most Advantageous Tender in accordance with the published award criteria and proceed to contract award following completion of the applicable standstill period.

CPV: Installation services of electrical and mechanical equipment

The lotProcurement structure

single lot · value published
Lot #1Renewal 2 yrsPublished value£1,600,000
Contract period: 10 Sept 2026 – 9 Sept 2028 (2 yrs) · up to 9 Sept 2030 with extensionsValue: £1,600,000 exc. VAT · £1,600,000 inc. VAT
Extensions: Contract will be published as a 2+1+1 contract (4 Years in total)

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
How bids were scored
Quality: 45%Price: 55%
Published sub-criteria (2)
  • Technical: 45%
  • Commercial: 55%
Published award criteria (2)
  • Technical
  • Commercial
What this means for your bid
  • Price carries 55 of 100 points: a 10% discount moves about 5.5 points. This one is won on the number: sharpen the price before polishing the prose.

Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.

Procedure terms & legal framework

From the official record
Procedure method
Competitive flexible procedure
Legal basis
UKPGA · 2023/54 Procurement Act 2023
Procurement category
Services
Notice status
Closed
Procurement threshold
Above threshold (FTS publication)
Regulatory regime
Utilities
Commercial structure
Stand-alone contract (no framework)
Competition type
Competitive procedure
GPA / WTO covered
Unspecified in notice
Recurring procurement
Unspecified in notice
First published
6 May 2026, 20:01 BST
Last source update
6 May 2026, 20:01 BST
Award evaluation window
Submission end – 5 Aug 2026
FTS notice number
2026/S 000-041643
Latest notice
Tender notice (UK4)
Classification (CPV)
Installation services of electrical and mechanical equipment
Delivery area
Not published
Official registry OCID
ocds-h6vhtk-0692b2 Find a Tender
How it runs

A Contract Notice will be published inviting suppliers to express an interest in participating in the procurement. Suppliers who express interest during the Expression of Interest (EOI) period will be added to the tender list on a rolling basis as quickly as reasonably practicable following receipt of their request. Upon being added to the tender portal, suppliers will immediately be granted access to the tender documentation to allow early review and preparation of their submissions.

The EOI period will remain open for a minimum of 25 days. Following closure of the EOI period, tenderers will be provided with a minimum of seven (7) calendar days to finalise and submit their tender responses.

The procedure will comprise a single tender submission stage. Submitted tenders will be evaluated against the published award criteria, including quality and commercial considerations. Clarification questions may be raised with bidders during the evaluation process to ensure a full understanding of submitted responses.

The Authority reserves the right to undertake limited negotiation or refinement with the preferred bidder(s) in relation to contractual, technical, commercial, or delivery matters, provided this does not materially alter the scope of the procurement or distort competition.

Following evaluation and any necessary clarification or negotiation activities, the Authority will identify the Most Advantageous Tender in accordance with the published award criteria and proceed to contract award following completion of the applicable standstill period.

How it was run

Official notice
Run through: portal not identified
Electronic submission allowedLanguage: EN
Submission deadline
10 Jun 2026, 18:00 BST
Submission channel
Official e-sourcing portal
Electronic submission
Allowed
Accepted languages
en
Detailed submission instructions & authority contactsFrom official release

Timeline

6 May 2026 → 10 Sept 2026 · 4 dates
  1. Tender notice published175 days ago
    6 May 2026, 20:01 BST
  2. Submission deadline140 days ago
    10 Jun 2026, 18:00 BST
  3. Award decision expected by83 days ago
    5 Aug 2026, 23:59 BST
  4. Contract starts48 days ago
    10 Sept 2026, 00:00 BST

Notice history

1 event · 1 release on Find a Tender
  1. Tender notice published
    6 May 2026, 20:01 BST
    UK4

Contracting authority & participating public bodies

FIRST GREATER WESTERN LIMITED

Contracting authorityPrivate utility GB-COH: 05113733 · GB-PPON: PXVG-2764-GZCQ Milford House 1 Milford Street, Wiltshire, South West, SN1 1HLContact email

Official documents & specifications (2)

Official links; attachments are not copied

Tender pack and attachments

Notices published for this procedure

  • Tender notice tenderTender noticeUK4Tender notice on Find a Tender