Find a TenderClosed
Published 14 Mar 2022, 09:46 GMT

Official UK procurement notice

NGET Call For Innovation - Innovative Substation Auxiliary Load Solutions

Official notice

Authority: National Grid Electricity Transmission plc

ServicesNegotiated procedure with prior call for competition
Budget not disclosedValue not published
Submissions closed 14 Apr 2022

What is being bought

Published requirement description

The Call for Innovation (CFI) is an approach to the market to see what products and services are available in the industry with funding coming from Ofgem's Network Innovation Allowance.

A CFI is not a formal competitive tender process but is an approach to the market with a specific problem statement or topic of interest that National Grid would like to hear ideas about from the marketplace.

All information received will be used to consider whether we want to engage with a specific supplier or whether we believe a competitive tender approach is required. Essentially this CFI will inform or dictate our procurement strategy.

CPV: Installation services of electricity control equipment

The lotProcurement structure

single lot · no lot value published
Lot #1To tackle climate change by reducing emissions and enhance the reliability and…

To tackle climate change by reducing emissions and enhance the reliability and resilience of backup power systems, NGET, is seeking to establish a new commercial approach with a 3rd party supplier, to trial new backup power systems or combined standby and generation assets that are low carbon alternatives to the traditional battery and diesel assets that are used across its substations.

NGET's substations need both AC and DC power for the safe reliable operation of the network including protection, control, critical plant and equipment such as transformers, reactors, and switchgear. Traditionally, incoming AC supplies are derived from a DNO (via distribution transformers) and DC power from substation batteries (VRLA, Planté and some Ni-Cad). In addition, backup diesel generators (gensets) provide standby AC power in in the event of a loss of supply event.

The purpose of this CFI is to help National Grid identify:

  1. Products

a. New technologies capable of providing in the region of 300 - 500kVA low emission backup power to a substation for a minimum of 72 hours with no external supply; and/or,

b. Novel technology capable of delivering energy solutions that can meet all or part of the substation load demand (AC/DC) during normal and standby operations (as a priority) combined with commercial generation (MW) that can synchronise to the GB electricity network*.

  1. Services

a. Service offerings related to the provision of power during a loss of supply event.

This CFI will inform NGET's approach to obtaining the required resource / improve NGET's knowledge of the backup power and generation market.

Delivery: UK
Extensions: NGET will have the option to extend the term of any agreement.Variant bids: allowed

Procedure terms & legal framework

From the official record
Procedure method
Negotiated procedure with prior call for competition
Legal basis
CELEX · 32014L0025 Utilities Contracts Regulations 2016 (Directive 2014/25/EU)
Procurement category
Services
Notice status
Closed
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Stand-alone contract (no framework)
Competition type
Competitive procedure
GPA / WTO covered
Unspecified in notice
Recurring procurement
No (one-off requirement)
First published
14 Mar 2022, 09:46 GMT
Last source update
14 Mar 2022, 11:17 GMT
Authority reference
CFI-001
FTS notice number
2022/S 000-006829
Classification (CPV)
Installation services of electricity control equipment
Delivery area
UK
Official registry OCID
ocds-h6vhtk-032134 Find a Tender

How it was run

Official notice
Run through: portal not identified
Language: EN
Submission deadline
14 Apr 2022, 17:00 BST
Submission channel
{"electronicSubmission"}
Accepted languages
en
Detailed submission instructions & authority contactsFrom official release

Timeline

14 Mar 2022 → 14 Apr 2022 · 2 dates
  1. Notice published
    14 Mar 2022, 11:17 GMT
  2. Submission deadline
    14 Apr 2022, 17:00 BST

Notice history

2 releases on Find a Tender
Published amendments (1 · 0 deadline changes)
WhenWhatBeforeAfterShift
—TextI.1.3The procurement documents are available for unrestricted and full direct access, free of charge, at https://www.nationalgrid.com/gas-transmission/innovation/how-to-work-with-us Additional information can be obtained from the above-mentioned address Tenders or requests to participate must be submitted electronically via https://www.nationalgrid.com/gas-transmission/innovation/how-to-work-with-usThe procurement documents are available for unrestricted and full direct access, free of charge, at https://www.nationalgrid.com/electricity-transmission/innovation/how-to-work-with-us Additional information can be obtained from the above-mentioned address Tenders or requests to participate must be submitted electronically via https://www.nationalgrid.com/electricity-transmission/innovation/how-to…

1 amendment published without a description.

Contracting authority & participating public bodies

NATIONAL GRID ELECTRICITY TRANSMISSION PLC

Contracting authorityElectricity 1 - 3 Strand, LONDON, UK, WC2N5EHContact name, email, phone Published organisation website ↗

Official documents & specifications

Official links; attachments are not copied

No document links were published on the notice.