Official UK procurement notice
North Campus - Industry Hub
Authority: BURNLEY COLLEGE (Education)·Consortium: 2 public authorities
What is being bought
Published requirement descriptionThis project comprises the development of the newly acquired North campus be developed to include: the construction of the new Industry Hub building; as well the construction of new infrastructure and landscaping elements.
The proposed works will be procured through a single stage Design & Build route, based on RIBA Stage 4 Design information.
The Works will be instructed in two phases:
- Phase 1 being the delivery of the infrastructure and landscaping package only; and
- Phase 2 being the delivery of the infrastructure and landscaping package, as well as the a new Industry Hub building.
The proposed works noted under Phase 2, notably the construction of the new Industry Hub building will be dependent upon a successful funding applications.
CPV: Architectural and related services · Building completion work · Building installation work · Construction work · Construction-related services · Engineering services · Hire of construction and civil engineering machinery and equipment with operator · Monitoring and control services · Site preparation work · Technical testing, analysis and consultancy services · Urban planning and landscape architectural services · Works for complete or part construction and civil engineering work
The lotProcurement structure
single lot · value publishedLot #1In late 2019, the College carried out a review of the campus and accommodation…AwardedPublished value£10,000,000
In late 2019, the College carried out a review of the campus and accommodation strategy, leading to a study for a strategic master plan in March 2020. The master plan identified a number of sites on the existing campus, including the teaching building and Sports building extension.
The land to the North of the existing site was identified as the ideal location for an extension to the campus and would provide the College with medium-long term development capacity, the" North Campus" as it has become known.
Instead of simply forming an extended version of the existing campus, the opportunity has been taken to re-think the character of a place for learning. Providing excellent teaching space is a pre-requisite, as is ensuring buildings have a low energy demand with low emissions leading towards net zero carbon is a key objective of the design. In complete contrast to the existing campus is the integration of green landscape space and buildings.
Although close to the town centre with its retail parks and car parks, the North campus is envisaged as a haven with buildings in soft landscape, where proximity to nature becomes part of the student experience at Burnley College.
At the heart of the North Campus is a green space, almost a park with buildings around the perimeter. The need to deal with water has been treated as a positive with storage capacity built into a central lake with swales. This will create a range of distinctive planting zones with various habitats. A linear pedestrian route that will link future buildings defines the eastern edge of the green space, it will also accommodate café and social learning zones that spill out from the ground floors of teaching buildings. From upper floors it is expected that the design of the proposed buildings can take advantage of views towards Pendle and South towards the viaduct.
The central area will include a small sports area to supplement the all-weather pitch on the main campus. This will be provided managed sports provision that will be available for community just as existing facilities are. At the South end of the site a combination of ramp and steps will deal with the change in level between the current and proposed campus.
There is also potential to incorporate a trim trail around the perimeter of the site and incorporate a performance space to the south of the industry hub with permanent seating as a landscape feature.
Between the linear route and the Calder is the future development zone for teaching buildings. This zone stays outside the 8m easement along the river required by the Environment Agency. Whilst there will be access along the river, it is seen as secondary with minimal footfall. It is intended to be a quite space with limited lighting at night
At the North end of the site will be the Industry Hub. The building will terminate the view and create something of a barrier to motorway noise, but as a two storey structure will not block the views of trees beyond. The ground floor social spaces are linked to a south facing external terrace that will have views of the viaduct and townscape beyond.
The scope of the procurement is to appoint a Principal Contractor for the delivery of the North Campus - Industry Hub project. The successful tenderer/contractor awarded such a contract must be fully available to mobilise in early April 2023.
The Contract terms and conditions will be JCT Design & Build Building Contract (2016),with Special Conditions, which are available as part of the ITT.
The College has procured Project Team and Design Services to complete up to RIBA Stage 4.
The following Design Disciplines are proposed to be novated to the Principal Contractor.
- Architect (lead Designer) - ABW Architects
- Landscape Designer - Milieu Landscape Design
- Civil & Structural Engineering Consultants - Waterman Group.
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Published sub-criteria (7)
- Resource Plan: 10%
- Programme: 20%
- Works Delivery Plan: 10%
- Health and Safety: 10%
- Price: 40%
- Social Value: 5%
- Environment: 5%
Published award criteria (7)
- Resource Plan: 10%
- Programme: 20%
- Works Delivery Plan: 10%
- Health and Safety: 10%
- Environment: 5%
- Social Value: 5%
- Price: 40%
- Suitability
As outlined in the Invitation to Tender (ITT) documents, which are available at www.burnley.ac.uk/newbuildtender ↗.
Potential tenderers should register their interest by emailing: newbuildtender@burnley.ac.uk
Tender clarifications should also be issued to newbuildtender@burnley.ac.uk
Tender submissions should be sent to newbuildtender@burnley.ac.uk
- Price carries 40 of 100 points: a 10% discount moves about 4 points. The method statement decides this lot, not the discount.
Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.
Procedure terms & legal framework
From the official record- Procedure method
- Open procedure
- Legal basis
- CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
- Procurement category
- Works
- Notice status
- Awarded
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Competitive procedure
- GPA / WTO covered
- Unspecified in notice
- Recurring procurement
- No (one-off requirement)
- First published
- 18 Jan 2023, 18:00 GMT
- Last source update
- 7 Jun 2023, 11:23 BST
- Award evaluation window
- 1 Mar 2023 – …
- Authority reference
FTS 001610-2023- FTS notice number
2023/S 000-016106- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-0398aeFind a Tender
How it was run
Official notice- Submission deadline
- 1 Mar 2023, 12:00 GMT
- Submission channel
- {"electronicSubmission","written"}
- Accepted languages
- en
- Bid validity
- 90 days from the deadline
- Bids opened
- 1 Mar 2023, 14:00 GMT
Timeline
1 Mar 2023 → 7 Jun 2023 · 3 dates- Submission deadline1 Mar 2023, 12:00 GMT
- Bids opened1 Mar 2023, 14:00 GMT
- Notice published7 Jun 2023, 11:23 BST
Notice history
2 events · 2 releases on Find a Tender · since 7 Jun 2023- Status changed to complete7 Jun 2023, 11:23 BST
- Buyer details updated7 Jun 2023, 11:23 BST
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast| Awarded to | Value | Date | Status |
|---|---|---|---|
| John Turner Construction Group LimitedSMESubcontracting: declared | £10,795,600 † | — | Awarded |
Contracts
Contract 016106-2023-1 · John Turner Construction Group LimitedSME
- Signed
- 6 Jun 2023
- Value
- £10,795,600
- Status
- active
Bid statistics published by the authority
| Bids | SME | VCSE | Valid bid range |
|---|---|---|---|
| 1bids · 1 electronic | — | — | — |
Contracting authority & participating public bodies
2 public bodies on the noticeDispute resolution & review bodies
- Royal Courts of JusticeReview body
Bidders & participating suppliers
1 commercial party on the notice- John Turner Construction GroupAwarded supplier
Official documents & specifications (2)
Official links; attachments are not copiedTender pack and attachments
- Economic and financial selection criteria
- Technical selection criteria