Find a TenderClosedTender notice
Published 19 Mar 2026, 10:00 GMT

Official UK procurement notice

PRO005070 – Supply of Battery Energy Storage Solutions (BESS)

Official notice

Authority: United Utilities Water Limited (Public body)

Framework agreementGoodsCompetitive flexible procedureAbove thresholdUtilitiesSME suitable
Framework ceiling (notional)£40,000,000framework ceiling, not attributable revenue
Submissions closed 7 May 2026
Framework period 8 yrsends 10 Aug 2034 · starts 13 Aug 2026

What is being bought

Published requirement description

United Utilities Water Limited intends to establish a multi-supplier framework agreement for the provision of Battery Energy Storage Systems (BESS) to support delivery of its Power Resilience Programme across operational water and wastewater sites. The framework will enable the deployment of distributed battery storage assets across approximately 225 operational locations, supporting enhanced power resilience, operational continuity and decarbonisation objectives during the AMP8 and AMP9 regulatory periods. The scope of the framework includes the supply of containerised or modular Battery Energy Storage Systems, including battery modules, power conversion systems (PCS), energy management systems (EMS), monitoring and control systems, and associated balance-of-plant components required for integration with existing electrical infrastructure. Systems will support resilience requirements such as backup power during grid outages, peak demand management and, where appropriate, participation in grid flexibility services. Suppliers appointed to the framework will be expected to provide equipment warranties, performance guarantees and options for long-term service and maintenance to support reliable lifecycle operation. The scope may also include technical support for design integration, commissioning assistance, remote monitoring capabilities and integration with site-level control systems, including SCADA where required. The framework will appoint a limited number of experienced suppliers capable of delivering scalable and standardised BESS solutions suitable for deployment across a diverse portfolio of operational sites with varying power and capacity requirements. Call-off contracts for individual deployments may be awarded through direct award or mini-competition in accordance with the framework terms.

  • How the procedure runs: United Utilities Water Limited intends to establish a multi-supplier framework agreement for the provision of Battery Energy Storage Systems (BESS) to support delivery of its Power Resilience Programme across operational water and wastewater sites. The framework will enable the deployment of distributed battery storage assets across approximately 225 operational locations, supporting enhanced power resilience, operational continuity and decarbonisation objectives during the AMP8 and AMP9 regulatory periods. The scope of the framework includes the supply of containerised or modular Battery Energy Storage Systems, including battery modules, power conversion systems (PCS), energy management systems (EMS), monitoring and control systems, and associated balance-of-plant components required for integration with existing electrical infrastructure. Systems will support resilience requirements such as backup power during grid outages, peak demand management and, where appropriate, participation in grid flexibility services. Suppliers appointed to the framework will be expected to provide equipment warranties, performance guarantees and options for long-term service and maintenance to support reliable lifecycle operation. The scope may also include technical support for design integration, commissioning assistance, remote monitoring capabilities and integration with site-level control systems, including SCADA where required. The framework will appoint a limited number of experienced suppliers capable of delivering scalable and standardised BESS solutions suitable for deployment across a diverse portfolio of operational sites with varying power and capacity requirements. Call-off contracts for individual deployments may be awarded through direct award or mini-competition in accordance with the framework terms.

CPV: Battery packs · Chargers · Electrical equipment and apparatus · Information systems

How this framework works

From the published notice
Type
Open framework
Call-offs
every call-off is a further competition among the appointed suppliers
Framework period
8 yrs from 13 Aug 2026
Buyer regions
UKD
Who may buy through it

United Utilities Water Limited

Published description of the framework

The framework agreement will establish a multi-supplier arrangement (2–3 suppliers) for the supply of Battery Energy Storage Systems (BESS), including associated equipment, warranties and long-term service agreements. The framework will operate for an initial term of 4 years, with options to extend by up to 2 + 2 years. An initial direct call-off will be awarded for priority Year 1 sites, with subsequent requirements awarded through mini-competitions between appointed suppliers. The framework is intended to support the phased deployment of BESS across multiple sites as part of a long-term resilience programme.

The lotProcurement structure

single lot · value published
Lot #1 8 yrsSMEPublished value£40,000,000
Contract period: 13 Aug 2026 – 10 Aug 2034 (8 yrs)Value: £40,000,000 exc. VAT · £48,000,000 inc. VAT
Delivery: North WestEligibility: SME eligible
Pre-qualification & selection criteria (PQQ)2
  • Economic & financial standing

    Suppliers must confirm that they have the necessary legal standing and financial capacity to perform the contract. This includes compliance with applicable laws and regulations and confirmation that they are not subject to any exclusion grounds.

  • Technical & professional ability

    Suppliers must demonstrate that they have the necessary technical capability and experience to deliver the contract. This includes relevant experience in the design, manufacture and/or supply of battery systems of similar scale and complexity, and the ability to meet required performance, safety, and delivery standards. Further evidence may be requested at a later stage of the procurement process.

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
How bids were scored
Quality: 50%Price: 50%
Published sub-criteria (2)
  • Technical: 50%
  • Commercial: 50%
Published award criteria (2)
  • Commercial
  • Technical
Conditions of participation2
  • Economic & financial standing

    Suppliers must confirm that they have the necessary legal standing and financial capacity to perform the contract. This includes compliance with applicable laws and regulations and confirmation that they are not subject to any exclusion grounds.

  • Technical & professional ability

    Suppliers must demonstrate that they have the necessary technical capability and experience to deliver the contract. This includes relevant experience in the design, manufacture and/or supply of battery systems of similar scale and complexity, and the ability to meet required performance, safety, and delivery standards. Further evidence may be requested at a later stage of the procurement process.

What this means for your bid
  • Price carries 50 of 100 points: a 10% discount moves about 5 points. This one is won on the number: sharpen the price before polishing the prose.
  • “PRO005070 – Supply of Battery Energy Storage Solutions (BESS)” is a framework: the contest is a place on its panel, not a single contract: each call-off is a further competition, so the pricing contest starts after appointment.

Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.

Procedure terms & legal framework

From the official record
Procedure method
Competitive flexible procedure
Legal basis
UKPGA · 2023/54 Procurement Act 2023
Procurement category
Goods
Notice status
Closed
Procurement threshold
Above threshold (FTS publication)
Regulatory regime
Utilities
Commercial structure
Framework agreement
Who may use this agreement
United Utilities Water Limited
Competition type
Competitive procedure
GPA / WTO covered
Unspecified in notice
Recurring procurement
Unspecified in notice
First published
19 Mar 2026, 10:00 GMT
Last source update
19 Mar 2026, 10:00 GMT
Award evaluation window
Submission end – 13 Aug 2026
Authority reference
PRO005070
FTS notice number
2026/S 000-024976
Latest notice
Tender notice (UK4)
Classification (CPV)
Battery packsChargersElectrical equipment and apparatusInformation systems
Delivery area
North West (UKD)
Official registry OCID
ocds-h6vhtk-066e73 Find a Tender
How it runs

United Utilities Water Limited intends to establish a multi-supplier framework agreement for the provision of Battery Energy Storage Systems (BESS) to support delivery of its Power Resilience Programme across operational water and wastewater sites. The framework will enable the deployment of distributed battery storage assets across approximately 225 operational locations, supporting enhanced power resilience, operational continuity and decarbonisation objectives during the AMP8 and AMP9 regulatory periods. The scope of the framework includes the supply of containerised or modular Battery Energy Storage Systems, including battery modules, power conversion systems (PCS), energy management systems (EMS), monitoring and control systems, and associated balance-of-plant components required for integration with existing electrical infrastructure. Systems will support resilience requirements such as backup power during grid outages, peak demand management and, where appropriate, participation in grid flexibility services. Suppliers appointed to the framework will be expected to provide equipment warranties, performance guarantees and options for long-term service and maintenance to support reliable lifecycle operation. The scope may also include technical support for design integration, commissioning assistance, remote monitoring capabilities and integration with site-level control systems, including SCADA where required. The framework will appoint a limited number of experienced suppliers capable of delivering scalable and standardised BESS solutions suitable for deployment across a diverse portfolio of operational sites with varying power and capacity requirements. Call-off contracts for individual deployments may be awarded through direct award or mini-competition in accordance with the framework terms.

How it was run

Official notice
Run through: EU-Supply (CTM) · Who buys & how to bid on EU-Supply
Public notice page · account needed to bidElectronic submission allowedLanguage: EN
Access & registration note: Free · 5–10 minutes
Appointment period ends
7 May 2026, 18:00 BST
Clarification deadline
1 Apr 2026, 18:00 BST
Submission channel
Official e-sourcing portal
Electronic submission
Allowed
Accepted languages
en
Detailed submission instructions & authority contactsFrom official release

Timeline

19 Mar 2026 → 13 Aug 2026 · 5 dates
  1. Tender notice published223 days ago
    19 Mar 2026, 10:00 GMT
  2. Clarification questions by210 days ago
    1 Apr 2026, 18:00 BST
  3. Admission / appointment period ends174 days ago · period end, not a bid countdown
    7 May 2026, 18:00 BST
  4. Contract starts77 days ago
    13 Aug 2026
  5. Award decision expected by76 days ago
    13 Aug 2026, 23:59 BST

Notice history

1 event · 1 release on Find a Tender
  1. Tender notice published
    19 Mar 2026, 10:00 GMT
    UK4

Contracting authority & participating public bodies

United Utilities Water Limited

Contracting authorityPrivate utility GB-PPON: PVVB-5589-BWHX Lingley Mere Business Park, Warrington, North West, WA5 3LPContact name, email, phone

Official documents & specifications (1)

Official links; attachments are not copied

Notices published for this procedure

  • Tender notice tenderTender noticeUK4Tender notice on Find a Tender