Official UK procurement notice
Production and Installation of Integrated UHF SATCOM & EFMTE 4.2 Baseline Equipment (which consist of bespoke integrated satellite communications equipment) for the Royal Navy’s Type 26 Ships 2 & 3
Authority: Ministry of Defence (Central government)
What is being bought
Published requirement descriptionProduction and Installation of Integrated UHF SATCOM & EFMTE 4.2 Baseline Equipment (which consist of bespoke integrated satellite communications equipment) for the Royal Navy’s T26 fleet Ships 2 & 3
CPV: Satellite-related communications equipment
The lotProcurement structure
single lot · no lot value publishedLot #1Awarded
Procedure terms & legal framework
From the official record- Procedure method
- Award procedure without prior publication of a call for competition
- Legal basis
- CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
- Procurement category
- Goods
- Notice status
- Awarded without competition
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Direct award (no call for competition)
- GPA / WTO covered
- Unspecified in notice
- Recurring procurement
- Unspecified in notice
- First published
- 21 Nov 2023, 09:06 GMT
- Last source update
- 21 Nov 2023, 09:06 GMT
- Authority reference
706217450-A- FTS notice number
2023/S 000-034350- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-041b7fFind a Tender
- Why no open competition
- The procurement falls outside the scope of application of the directive
- Published justification
MoD has awarded a 4-year Contract to STS Defence Limited for production & installation of Integrated UHF SATCOM & EFMTE 4.2 baseline equipment (which consist of bespoke integrated satellite communications equipment) for the Royal Navy’s T26 fleet Ships 2 & 3. This equipment meets the Fleet User Requirement Document, such that the user shall be able to provide a communications service to support Information Exchange Requirements for simultaneous voice and data. Capable of supporting DAMA, FM, High Performance Waveform and Integrated Waveform data services within 25KHz channel. It has the ability for one antenna to access two different satellites operating on different waveforms and frequencies simultaneously; and to interface the modems used by the Royal Navy Fleet and radios used by embarked forces through the same antennae.
As per regulation 4 of The Defence & Security Public Contracts (Amendment) (EU Exit) Regulations 2019 (SI 2019/697) this procurement falls under the provisions of the Defence & Security Public Contracts Regulations 2011 as amended (in particular by SI 2019/697 and SI 2020/1450). Prior publication of a contract notice in the OJEU is not appropriate.
This Contract was placed using the Negotiated Procedure Without Prior Publication of a Contract Notice (in accordance with the relevant legislation) pursuant to Regulation 16(1)(a)(ii) of the DSPCR 2011 (as amended) for Technical Reasons.
STS previously designed a bespoke UHF SATCOM 4.2 Design capability in partnership with SNXP Limited which is accredited for use by MoD on T26 Fleet. Installation of this capability in Ship 1 was carried out by STS under a task on an existing MoD Contract, which was competed and awarded to STS. Due to an exclusivity agreement, SNXP will only supply STS with the required hardware design and technical expertise to enable them to complete installation.
Contractual timelines for the delivery of this equipment capability into T26 Ships 2 and 3 are already embedded within the existing T26 Ship Building Contract (Ref. SHIPACQ036) as a requirement to enable repeat supply and fit.
Only STS/SNXP have the technical ability and experience necessary to produce and install this equipment capability into T26 Ships 2 and 3 in a manner that is accredited for use by the MoD and meets the required timescales.
It was not viable for another supplier to deliver an alternative design meeting MoD’s technical requirement within the necessary timescales. The STS/SNXP design is approved by Naval Command Headquarters & Director Special Forces to ensure it is fit for use. This design & accreditation process took several years to complete. Bringing in a third-party supplier to design new equipment, obtaining MoD approval & accreditation for the new design and building and installing it on T26 Ships 2 & 3 would incur significant and disproportionate additional time and cost consequences to the MoD, and also result in significant delays to Vessel Acceptance Date (by which MoD are required to have agreed that the T26 Ship has been delivered to an acceptable level in accordance with the T26 Ship Building Contract (Ref. SHIPACQ036)), thereby causing an unacceptable capability gap.
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast| Awarded to | Value | Date | Status |
|---|---|---|---|
| STS Defence Ltd | £4,282,230 † | — | Awarded |
Contracts
Production and Installation of Integrated UHF SATCOM & EFMTE 4.2 Baseline Equipment (which consist of bespoke integrated satellite communications equipment) for the Royal Navy’s Type 26 Ships 2 & 3 · STS Defence Ltd
- Signed
- 9 Oct 2023
- Value
- £4,282,230
- Status
- active
Bid statistics published by the authority
| Bids | SME | VCSE | Valid bid range |
|---|---|---|---|
| 1bids | 1 | — | — |
Contracting authority & participating public bodies
Dispute resolution & review bodies
- Ministry of Defence - Defence Digital CommercialReview bodyReview contact point
- Ministry of Defence – Central Legal ServicesMediation body
Bidders & participating suppliers
1 commercial party on the notice- STS Defence LimitedAwarded supplier
Official documents & specifications
Official links; attachments are not copiedNo document links were published on the notice.