Find a TenderClosed
Published 31 May 2022, 14:17 BST

Official UK procurement notice

Programme of work on mixed waste composition

Official notice

Authority: Defra Network eTendering Portal

2 lotsServicesOpen procedureMax 1 lot per supplier
Budget not disclosedValue not published
Submissions closed 4 Jul 2022
Lots 2max 1 won per supplier
Contract term Varies by lotfirst lot 2 yrs 7 mo from 19 Aug 2022 · see each lot

What is being bought2 lots · detail below

Published requirement description

The objective of this procurement is to procure two contracts to enable Defra to conduct a programme of work to improve Defra’s understanding of the composition of mixed waste from households and from businesses. The first contract is the most significant and will involve 1) designing, carrying out and reporting on a programme of primary data collection, 2) carrying out research to understand the drivers of waste composition and, based on this, developing a model for updating data in years where primary data collection is not carried out and 3) conduct research to review and recommend near-market approaches to measuring the composition of waste that might make routine waste composition analysis more affordable in the future. The second contract is for a quality assurance auditor for item 1) of the first contract.

CPV: Research and development services and related consultancy services · Technical analysis or consultancy services

Lots and requirements (2)Procurement structure

2 lots · all with a published value (£2,000,000 together) · win at most 1 of them
Lot #1Develop a model to predict and forecast waste composition for all EWC/LoW codes, based on extensive new data gathering 2 yrs 7 moPublished value£1,800,000

Lot 1 is divided into four packages of work (WPs), with design and reporting included within each. Overall project management should be shown as a separate package of work (i.e. WP5).

Within Lot 1 there will be two distinct phases – Phase 1 and Phase 2.

Phase 1 will deliver WP1-WP4 for the following waste streams:

  • waste and recycling collected from households
  • other local authority waste and recycling
  • waste and recycling received at sites
  • output and residual streams coded 19 12 12 produced from waste treatment facilities.

It is anticipated that Phase 1 will run from inception in Q2 2022/23 to completion of reporting in Q4 2023/24.

Phase 2 will deliver WP1-WP4 for the following waste streams (see annex 4):

  • Waste and recycling produced by agriculture, forestry and fishing (SICs 01-03)
  • Waste and recycling produced by industry (SICs 10-36) except for the waste and remediations industries
  • Waste and recycling produced by construction and demolition (SIC 41-43)
  • Waste and recycling produced by commerce (SICs 45-96)

It is anticipated that Phase 2 will run from inception in Q3 2023/24 to completion of reporting in Q4 2024/25. Budgets for 2023/25 have not yet been agreed within Defra. Prior to Phase 2, Defra will have the option of enacting a break clause should budget not be made available for this work; whether Phase 2 will proceed or not will be confirmed in Q3 2023/2024.

WP 1 covers the collection of new primary data using scientific measurement methods, often referred to as ‘waste composition analysis.’ It also includes gathering and collating secondary data.

WP 2 involves desk-based and potentially primary research into the drivers of waste composition.

WP 3 combines the outputs of WPs 1 and 2 to create a predictive model.

WP 4 reviews the approaches used in the project, looking forward to new methods of generating measurement-based data on the composition of waste, and makes recommendations for future programmes of work, including anything that may be needed for delivering our collection and packaging reforms (DRS, EPR and consistency).

All the above WPs will be underpinned by WP 5, which covers contractor project management, communication and knowledge-sharing.

All deliverables for WPs 1-5 will be required for both Phases 1 and 2.

Contract period: 19 Aug 2022 – 31 Mar 2025 (2 yrs 7 mo)
Delivery: UK
Variant bids: not allowed
Lot #2Fieldwork quality assurance 2 yrs 4 moPublished value£200,000

Lot 2 specifically exists to appoint a fieldwork quality auditor whose role will be to assure that delivery of the fieldwork is in line with the quality assurance standards set out by the successful Lot 1 contractor. This applies to fieldwork in both Phases 1 and 2.

Contract period: 19 Aug 2022 – 31 Dec 2024 (2 yrs 4 mo)
Delivery: UK
Variant bids: not allowed

Procedure terms & legal framework

From the official record
Procedure method
Open procedure
Legal basis
CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
Procurement category
Services
Notice status
Closed
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Stand-alone contract (no framework)
Competition type
Competitive procedure
GPA / WTO covered
Unspecified in notice
Recurring procurement
No (one-off requirement)
First published
31 May 2022, 14:17 BST
Last source update
31 May 2022, 14:17 BST
Award evaluation window
4 Jul 2022 – …
FTS notice number
2022/S 000-015216
Classification (CPV)
Research and development services and related consultancy servicesTechnical analysis or consultancy services
Delivery area
UK
Official registry OCID
ocds-h6vhtk-034216 Find a Tender
Review and risk notes
Review procedure

The Authority will incorporate a minimum 10 calendar day standstill period following electronic notification (minimum of 15 calendar days for any other means of communication) to unsuccessful applicants of the award decision. Applicants who are unsuccessful shall be informed by the Authority as soon as possible

after the decision has been made as to the reasons why the Applicant was unsuccessful. The Public Contracts Regulations 2015 (SI 2015 No 102) provide for aggrieved parties who have been harmed or are at risk of harm by breach of the rules to take legal action. Any such action must be brought within the applicable limitation period.

How it was run

Official notice
Run through: Jaggaer · Who buys & how to bid on JAGGAER
Supplier login requiredLanguage: EN
Access & registration note: Free; latest Chrome/Edge/Firefox only — corporate browsers fail

Tender documents are also served through a separate tool: https://defra.bravosolution.co.uk/ ↗

Submission deadline
4 Jul 2022, 15:00 BST
Submission channel
{"electronicSubmission","written"}
Accepted languages
en
Bid validity
1140 days from the deadline
Bids opened
4 Jul 2022, 15:00 BST
Detailed submission instructions & authority contactsFrom official release

Timeline

31 May 2022 → 19 Aug 2022 · 4 dates
  1. Notice published
    31 May 2022, 14:17 BST
  2. Submission deadline
    4 Jul 2022, 15:00 BST
  3. Bids opened
    4 Jul 2022, 15:00 BST
  4. Contract starts
    19 Aug 2022, 00:00 BST

Contracting authority & participating public bodies

Defra Network eTendering Portal

Contracting authorityNational or federal agency/officeEnvironmental protection 17 Nobel House, London, UK, SW1P 3JRContact name, email, phone Published organisation website ↗

Dispute resolution & review bodies

  • Courts of England and WalesReview body London

Official documents & specifications

Official links; attachments are not copied

No document links were published on the notice.