Programme of work on mixed waste composition
Authority: Defra Network eTendering Portal
What is being bought2 lots · detail below
Published requirement descriptionThe objective of this procurement is to procure two contracts to enable Defra to conduct a programme of work to improve Defra’s understanding of the composition of mixed waste from households and from businesses. The first contract is the most significant and will involve 1) designing, carrying out and reporting on a programme of primary data collection, 2) carrying out research to understand the drivers of waste composition and, based on this, developing a model for updating data in years where primary data collection is not carried out and 3) conduct research to review and recommend near-market approaches to measuring the composition of waste that might make routine waste composition analysis more affordable in the future. The second contract is for a quality assurance auditor for item 1) of the first contract.
CPV: Research and development services and related consultancy services · Technical analysis or consultancy services
Lots and requirements (2)Procurement structure
2 lots · all with a published value (£2,000,000 together) · win at most 1 of themLot #1Develop a model to predict and forecast waste composition for all EWC/LoW codes, based on extensive new data gatheringPublished value£1,800,000
Lot 1 is divided into four packages of work (WPs), with design and reporting included within each. Overall project management should be shown as a separate package of work (i.e. WP5).
Within Lot 1 there will be two distinct phases – Phase 1 and Phase 2.
Phase 1 will deliver WP1-WP4 for the following waste streams:
- waste and recycling collected from households
- other local authority waste and recycling
- waste and recycling received at sites
- output and residual streams coded 19 12 12 produced from waste treatment facilities.
It is anticipated that Phase 1 will run from inception in Q2 2022/23 to completion of reporting in Q4 2023/24.
Phase 2 will deliver WP1-WP4 for the following waste streams (see annex 4):
- Waste and recycling produced by agriculture, forestry and fishing (SICs 01-03)
- Waste and recycling produced by industry (SICs 10-36) except for the waste and remediations industries
- Waste and recycling produced by construction and demolition (SIC 41-43)
- Waste and recycling produced by commerce (SICs 45-96)
It is anticipated that Phase 2 will run from inception in Q3 2023/24 to completion of reporting in Q4 2024/25. Budgets for 2023/25 have not yet been agreed within Defra. Prior to Phase 2, Defra will have the option of enacting a break clause should budget not be made available for this work; whether Phase 2 will proceed or not will be confirmed in Q3 2023/2024.
WP 1 covers the collection of new primary data using scientific measurement methods, often referred to as ‘waste composition analysis.’ It also includes gathering and collating secondary data.
WP 2 involves desk-based and potentially primary research into the drivers of waste composition.
WP 3 combines the outputs of WPs 1 and 2 to create a predictive model.
WP 4 reviews the approaches used in the project, looking forward to new methods of generating measurement-based data on the composition of waste, and makes recommendations for future programmes of work, including anything that may be needed for delivering our collection and packaging reforms (DRS, EPR and consistency).
All the above WPs will be underpinned by WP 5, which covers contractor project management, communication and knowledge-sharing.
All deliverables for WPs 1-5 will be required for both Phases 1 and 2.
Lot #2Fieldwork quality assurancePublished value£200,000
Lot 2 specifically exists to appoint a fieldwork quality auditor whose role will be to assure that delivery of the fieldwork is in line with the quality assurance standards set out by the successful Lot 1 contractor. This applies to fieldwork in both Phases 1 and 2.
Procedure terms & legal framework
From the official record- Procedure method
- Open procedure
- Legal basis
- CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
- Procurement category
- Services
- Notice status
- Closed
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Competitive procedure
- GPA / WTO covered
- Unspecified in notice
- Recurring procurement
- No (one-off requirement)
- First published
- 31 May 2022, 14:17 BST
- Last source update
- 31 May 2022, 14:17 BST
- Award evaluation window
- 4 Jul 2022 – …
- FTS notice number
2022/S 000-015216- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-034216Find a Tender
- Review procedure
The Authority will incorporate a minimum 10 calendar day standstill period following electronic notification (minimum of 15 calendar days for any other means of communication) to unsuccessful applicants of the award decision. Applicants who are unsuccessful shall be informed by the Authority as soon as possible
after the decision has been made as to the reasons why the Applicant was unsuccessful. The Public Contracts Regulations 2015 (SI 2015 No 102) provide for aggrieved parties who have been harmed or are at risk of harm by breach of the rules to take legal action. Any such action must be brought within the applicable limitation period.
How it was run
Official noticeTender documents are also served through a separate tool: https://defra.bravosolution.co.uk/ ↗
- Submission deadline
- 4 Jul 2022, 15:00 BST
- Submission channel
- {"electronicSubmission","written"}
- Accepted languages
- en
- Bid validity
- 1140 days from the deadline
- Bids opened
- 4 Jul 2022, 15:00 BST
Timeline
31 May 2022 → 19 Aug 2022 · 4 dates- Notice published31 May 2022, 14:17 BST
- Submission deadline4 Jul 2022, 15:00 BST
- Bids opened4 Jul 2022, 15:00 BST
- Contract starts19 Aug 2022, 00:00 BST
Contracting authority & participating public bodies
Dispute resolution & review bodies
- Courts of England and WalesReview body
Official documents & specifications
Official links; attachments are not copiedNo document links were published on the notice.