Find a TenderPast planning notice
Published 10 Jan 2024, 14:42 GMT

Official UK procurement notice

Project and Asset Care Execution (PACE)

Official notice

Authority: Sellafield Limited (Public body)

Works
Planned pipeline value£2,400,000,000pipeline notice, not a live tender
Tender notice expected 3 Oct 2024from the planned procurement notice

What is being bought

Published requirement description

This Prior Information Notice (PIN), without call for competition, is to alert the market that Sellafield Ltd intends to commence market engagement activity for the forthcoming Project and Asset Care Execution (PACE) Contract Opportunity. <br/><br/>PACE will be the successor to the Integrated Asset Care (IAC) framework and will maintain asset condition, and will provide new asset capabilities when needed, at the Sellafield Site in Cumbria. PACE will not be a like for like replacement for IAC but will build upon the existing IAC framework by including, higher value gated projects and design capability to deliver asset care for a scope of work, which includes jobs, tasks and projects in operational nuclear facilities in radiologically controlled areas. <br/><br/>As a result of this PIN and as part of the market engagement activity, Sellafield Ltd is seeking to obtain feedback on the proposed different contracting strategy delivery models, which use a varying number of Integrated Delivery Partners and the proposed long 15 year contract terms duration, that are currently under consideration, as set out in the supporting PACE PIN 1 Market Engagement Information document shared via Atamis, as referred to in II.2.14.1 Additional Information.<br/><br/>Interested parties can provide their feedback on the proposed contracting strategy delivery models and contract term duration by completing a PACE Request for Information (RfI) template which can be obtained from, and when completed submitted via Atamis, as referred to in II.2.14.1 Additional Information.

CPV: Construction work · Site preparation work

The lotProcurement structure

single lot · no lot value published
Lot #1The main scope for PACE will be to deliver jobs, tasks and projects in nuclear…Planned

The main scope for PACE will be to deliver jobs, tasks and projects in nuclear facilities within the Spent Fuel Management (SFM) and Special Nuclear Materials (SNM) areas, but with the potential to deliver jobs and tasks across any onsite nuclear facility where needed. The majority of the work will take place in operational nuclear facilities and in radiologically controlled areas. The work involves maintaining existing asset condition and providing new asset capabilities when needed, which requires a level of Sellafield Ltd Integrated Partner engagement, subject matter expertise and assurance. Typically, the work will be in line with the following:<br/>- design, procurement, installation, modifications and commissioning of plant and equipment, and their dismantlement and removal;<br/>- asset care and support activities; and<br/>- integrated project controls and project management. <br/><br/>The delivery of the scope will be via the placement of packages of work that vary in size and complexity. With the description provided as high level examples only, these work packages are categorised as follows: <br/>- Jobs, small work content and short duration such as asset repairs; <br/>- Tasks, medium work content and duration such as an asset replacement;<br/>- Minor Projects, complex work involving multi disciplines such as the replacement of a series of assets ; and <br/>- Gated Projects, high value complex work involving multi disciplines, such as the installation of new types of assets. <br/>With the description provided again as high level examples only, the capabilities that will be required fit broadly into the following work disciplines and service types:<br/>- Civil works, including roofing, painting, fencing, roads and paths etc; <br/>- Mechanical works, including heating and ventilation, pipework, steelwork etc;<br/>- Electrical works, including building lighting, alarm systems, instrumentation etc; and<br/>- Project works, including Project, Contract & Cost Management etc. <br/>The proposed strategy for the agreement duration is up to a maximum 15-year framework, with an optional break point at year 9. The proposed extended contract term duration reflects the mobilisation and ramp up involved in building up the required expertise in the access, security and safe working requirements associated with the complex working arrangements at the Sellafield site. The extended contract term duration is also considered necessary to provide potential suppliers with the confidence to sustainably invest in technologies and in training their workforce to provide them with the critical skills needed to support delivery of the potentially complex work. <br/>The value of the work will be subject to ongoing governance and approval on an annual basis, but for planning purposes the mid-range estimate of the anticipated framework value across all of the work package categories for the maximum duration of 15 years is £2,400,000,000 (£2,400m). Additional information: As referenced to in I.3) Communication, the market engagement activity will be managed via the shared service Nuclear Decommissioning Authority (NDA) OneNDA eCommercial Systems powered by Atamis (Atamis), which can be accessed via the URL atamis-2464.my.site.com/s/Welcome ↗ . <br/><br/>Along with the issue of further PIN’s going forward, Atamis will be used to facilitate and provide details of further Market Engagement activity that we intend to use going forward such as webinars, face to face and further RfI requests. It is therefore important that interested organisations monitor Contracts Finder, the Find a Tender Service and Atamis for further PIN’s and market engagement activities relating to the PACE Contract Opportunity. <br/><br/>Once you have registered on Atamis, you can access using the record reference C17465, the PACE PIN 1 Market Engagement Information and the PACE RfI template documents referred to in II.1.4.1 Short Description above. <br/> <br/>If you are interested in providing feedback on our proposed delivery models and proposed contract term duration, you should again access Atamis using record reference C17465 and upload and return your completed RfI template by attaching it to a message using the ‘New Messages’ functionality. Completed RfI’s should be returned at the earliest opportunity and preferably by 12:00 on Tuesday 23rd January 2024.

Delivery: North West · Sellafield Site

Procedure terms & legal framework

From the official record
Legal basis
CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
Procurement category
Works
Notice status
Past planning notice
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Stand-alone contract (no framework)
Competition type
Competitive procedure
GPA / WTO covered
Yes (GPA)
Recurring procurement
Unspecified in notice
First published
10 Jan 2024, 14:42 GMT
Last source update
10 Jan 2024, 14:42 GMT
FTS notice number
2024/S 000-000821
Classification (CPV)
Construction workSite preparation work
Delivery area
North West (UKD11)
Official registry OCID
ocds-h6vhtk-042c14 Find a Tender

How it was run

Official notice
Submission deadline
—

Timeline

10 Jan 2024 → 3 Oct 2024 · 2 dates
  1. Notice published
    10 Jan 2024, 14:42 GMT
  2. Tender notice expected
    3 Oct 2024, 00:00 BST

Commercial outcome & contract awards

Pipeline notice
Awards (0)
No award published
Contracts (0)
No contract published
Bid statistics
No aggregate bid statistics published

Contracting authority & participating public bodies

Sellafield Ltd

Contracting authorityPublic bodyBody governed by public lawNuclear Decommissioning Hinton House, Birchwood Park Avenue, Warrington, North West, WA36GRContact name, email

Official documents & specifications

Official links; attachments are not copied

No document links were published on the notice.